Independent. Publicly sourced. Alberta focused.
See where Alberta's data centre buildout is happening.
Explore proposed, approved, under-construction, and operating projects through a transparent public record.
Use +/− or your keyboard to zoom. Hold Ctrl while scrolling, or use two fingers on touchscreens.
Operating
14 projects- O · Operating4WEB Edmonton Data CentreCity of Edmonton · Commercial colocation
- Capacity
- Not disclosed
- Cooling
- Not disclosed
- Power
- Alberta grid · EPCOR distribution
- O · OperatingCologix CGY1City of Calgary · Commercial colocation
- Capacity
- 400 kW facility capacity
- Cooling
- Not disclosed
- Power
- Alberta grid · ENMAX distribution
- O · OperatingDataHiveTwoCity of Calgary · Commercial colocation
- Capacity
- Not disclosed
- Cooling
- Not disclosed
- Power
- Alberta grid · ENMAX distribution
- O · OperatingEquinix Calgary CL1City of Calgary · Commercial colocation
- Capacity
- Not disclosed
- Cooling
- Not disclosed
- Power
- Alberta grid · ENMAX distribution
- O · OperatingEquinix Calgary CL2City of Calgary · Commercial colocation
- Capacity
- Not disclosed
- Cooling
- Not disclosed
- Power
- Alberta grid · ENMAX distribution
- O · OperatingEquinix Calgary CL3City of Calgary · Commercial colocation
- Capacity
- Not disclosed
- Cooling
- Not disclosed
- Power
- Alberta grid · ENMAX distribution
- O · OperatingeStruxture CAL-1City of Calgary · Commercial colocation
- Capacity
- 9 MW facility capacity
- Cooling
- Not disclosed
- Power
- Alberta grid · ENMAX distribution
- O · OperatingeStruxture CAL-2Rocky View County · Commercial colocation
- Capacity
- 26 MW current capacity
- Cooling
- Waterless free cooling
- Power
- Alberta grid · Multiple utility feeds
- O · OperatingQu Calgary CGY1City of Calgary · Commercial colocation
- Capacity
- 2.6 MW utility capacity
- Cooling
- Powered mechanical cooling with one redundant unit (N+1)
- Power
- Alberta grid · ENMAX distribution
- O · OperatingQu Calgary CGY2City of Calgary · Commercial colocation
- Capacity
- 1.8 MW utility capacity
- Cooling
- Powered mechanical cooling with one redundant unit (N+1)
- Power
- Alberta grid · ENMAX distribution
- O · OperatingQu Calgary CGY3City of Airdrie · AI-ready colocation
- Capacity
- 9 MW full-design capacity
- Cooling
- Powered mechanical cooling with one redundant unit (N+1)
- Power
- Alberta grid · FortisAlberta distribution
- O · OperatingQu Edmonton EDM1City of Edmonton · Commercial colocation
- Capacity
- 2.5 MW facility capacity
- Cooling
- Powered mechanical cooling with one redundant unit (N+1)
- Power
- Alberta grid · EPCOR distribution
- O · OperatingQu Edmonton EDM2City of Edmonton · AI-ready colocation
- Capacity
- 3 MW Tier III capacity
- Cooling
- Powered mechanical cooling with one redundant unit (N+1)
- Power
- Alberta grid · EPCOR distribution
- O · OperatingWhipcord LDC01City of Lethbridge · Commercial colocation
- Capacity
- Not disclosed
- Cooling
- Not disclosed
- Power
- Alberta grid · City of Lethbridge distribution
Under construction
4 projects- C · Under constructionAHI Red Deer / Blindman Industrial Park AI Data CentreRed Deer County · AI / High-performance computing
- Capacity
- Not disclosed
- Cooling
- Waterless cooling design reported
- Power
- Not disclosed
- C · Under constructioneStruxture CAL-3Rocky View County · AI-ready colocation
- Capacity
- 90 MW facility capacity
- Cooling
- Not disclosed
- Power
- Not disclosed
- C · Under constructionK-Tech and Aurora AZ Energy Compute FacilityCity of Calgary · Mixed AI / High-density compute
- Capacity
- 5 MW initial facility
- Cooling
- Not disclosed
- Power
- Not disclosed
- C · Under constructionPrairie Sky Strathmore CampusTown of Strathmore · AI-ready colocation
- Capacity
- 50 MW full-build roadmap
- Cooling
- Direct liquid cooling designed
- Power
- Not disclosed
Approved
1 projectProposed
23 projects- P · ProposedBantry Data SiteBantry region · AI / High-performance computing
- Capacity
- Not disclosed
- Cooling
- Not disclosed
- Power
- Not disclosed
- P · ProposedBeacon Chestermere AI Data Center HubCity of Chestermere · AI / High-performance computing
- Capacity
- 400 MW proposed campus
- Cooling
- Not disclosed
- Power
- Not disclosed
- P · ProposedBeacon Foothills AI Data Center HubFoothills County · AI / High-performance computing
- Capacity
- 400 MW proposed campus
- Cooling
- Not disclosed
- Power
- Not disclosed
- P · ProposedBeacon Harry Smith AI Data Center HubParkland County · AI / High-performance computing
- Capacity
- Not disclosed
- Cooling
- Not disclosed
- Power
- Not disclosed
- P · ProposedBeacon Heartland AI Data Center HubSturgeon County · AI / High-performance computing
- Capacity
- 800 MW proposed data centre load
- Cooling
- Not disclosed
- Power
- Not disclosed
- P · ProposedBeacon Indus Data Center HubRocky View County · AI / High-performance computing
- Capacity
- 1.2 GW proposed data centre load
- Cooling
- Air-cooled and closed-loop systems proposed
- Power
- Not disclosed
- P · ProposedBeacon Saunders Lake AI Data Center HubLeduc County · AI / High-performance computing
- Capacity
- Not disclosed
- Cooling
- Not disclosed
- Power
- Not disclosed
- P · ProposedCrusoe Alsike Energy Park Data CentreRed Deer County · AI / High-performance computing
- Capacity
- 170 MW related power plant
- Cooling
- Not disclosed
- Power
- Not disclosed
- P · ProposedCrusoe Crossfield Energy Park Data CentreRocky View County · AI / High-performance computing
- Capacity
- 170 MW related power plant
- Cooling
- Not disclosed
- Power
- Not disclosed
- P · ProposedCrusoe Myers Energy Park Data CentreBrazeau County · AI / High-performance computing
- Capacity
- 170 MW related power plant
- Cooling
- Not disclosed
- Power
- Not disclosed
- P · ProposedData Centre West of CliveLacombe County · Mixed AI / Cryptocurrency
- Capacity
- 19.8 MW announced capacity
- Cooling
- Not disclosed
- Power
- Not disclosed
- P · ProposedData District Olds FacilityTown of Olds · AI / High-performance computing
- Capacity
- 55 MW announced Olds facility
- Cooling
- Not disclosed
- Power
- Not disclosed
- P · ProposedGenesee Data Centre SiteLeduc County · Data centre / Workload undisclosed
- Capacity
- Approximately 500 MW marketed as available
- Cooling
- Not disclosed
- Power
- Not disclosed
- P · ProposedGoldfinch Technology Park Data CentreWheatland County · Data centre / Workload undisclosed
- Capacity
- Not disclosed
- Cooling
- Not yet selected
- Power
- Not disclosed
- P · ProposedHubOne AI and BTC High Density Compute ParkWheatland County · Mixed AI / Cryptocurrency
- Capacity
- Not disclosed
- Cooling
- Not disclosed
- Power
- Not disclosed
- P · ProposedKeephills Data Centre DevelopmentParkland County · Data centre / Workload undisclosed
- Capacity
- 230 MW initial development framework
- Cooling
- Not disclosed
- Power
- Not disclosed
- P · ProposedMalachite One DatacenterYellowhead County · AI / High-performance computing
- Capacity
- 1 GW provincial listing
- Cooling
- Not disclosed
- Power
- Not disclosed
- P · ProposedMihta Askiy Data CentreNorthern Sunrise County · AI / High-performance computing
- Capacity
- 650 MW proposed data centre load at full build
- Cooling
- Closed-loop data-centre cooling proposed
- Power
- Not disclosed
- P · ProposedSynapse Olds Data CentreTown of Olds · Hyperscale / AI
- Capacity
- 1 GW proposed data centre capacity
- Cooling
- Closed-loop cooling proposed
- Power
- Not disclosed
- P · ProposedTeton Digital Black Bear CampusSwan Hills region · AI / High-performance computing
- Capacity
- 466 MW proposed gas generation
- Cooling
- Not disclosed
- Power
- Not disclosed
- P · ProposedTeton Digital Northern Forge CampusMunicipal District of Greenview No. 16 · AI / High-performance computing
- Capacity
- 200 MW proposed gas-to-compute capacity
- Cooling
- Not disclosed
- Power
- Not disclosed
- P · ProposedWild Rose Power Hub Data CentreRocky View County · Data centre / Workload undisclosed
- Capacity
- Not disclosed
- Cooling
- Not disclosed
- Power
- Not disclosed
- P · ProposedWonder Valley AI Data Centre ParkMunicipal District of Greenview No. 16 · Hyperscale / AI
- Capacity
- 1.4 GW proposed first-phase power system
- Cooling
- Reuse and recirculation under study
- Power
- Not disclosed
Inactive
1 projectNo verified projects match those filters.
Published so far
A public record that grows carefully.
ADCW currently publishes 43 verified project records, including 5 full evidence profiles. Research leads stay private until their identity, status, location, and source base have been reviewed.
Scope
What ADCW tracks
Energy demand
Water consumption
Regulatory decisions
Public consultation
Economic impacts
Environmental impacts
Explore ADCW
Start with the question you have.
Browse verified projects
Compare published records by status, municipality, operator, and available evidence.
Open the project directory →Understand the issues
Learn what energy, water, environmental, regulatory, and economic claims actually tell us.
Read the issues overview →Inspect the evidence
Follow ADCW summaries back to municipal, provincial, regulatory, and proponent records.
Review research and sources →Take informed action
Find the right public body, write a focused message, and participate on the official record.
Use the action guide →About the project
Evidence before rhetoric.
Alberta Data Centre Watch is an independent public-interest project that makes fragmented information about Alberta data centre development easier to find, compare, and understand.
ADCW is not affiliated with any government, regulator, municipality, political party, or project proponent. It tracks AI, hyperscale, and colocation facilities, plus directly related power infrastructure when the connection can be documented. Crypto-only facilities and ordinary internal server rooms fall outside the current scope.
Primary sources come first. Company and government claims are attributed to the people making them. Unknown information stays visible, and every material summary should lead back to an original record.
Read the research methodology →