Project directory

Alberta data centre project list

ADCW brings verified Alberta data centre records into one directory, including projects that companies may describe as Alberta data centers in their own materials. Records are published only after their identity, current status, location precision, and source base have been reviewed.

Illustrative photo: John Guccione / Pexels

Publication scope

Verified records, not every lead

Alberta has no single authoritative registry for all data centre development. A missing listing does not prove that a project does not exist. It means ADCW has not yet published a record that meets its evidence standard.

Every record below has a checked public source trail. An evidence profile is the deeper, source-by-source review; a verified listing publishes the confirmed essentials while that fuller review has not yet been completed.

Public records
80
Evidence profiles
28
Verified listings
52
Operating20 projects

Facilities confirmed to be in service. Some may still be expanding or operating below their announced full capacity.

4WEB Edmonton Data Centre

Verified listing

4WEB · City of Edmonton · Commercial colocation

A small operating northwest Edmonton data centre providing colocation, hosting, backup, and cloud services.

View project detailsHide project details
Not disclosed
Alberta grid · EPCOR
Not disclosed
Not disclosedNo project-specific values found
Current status
OperatingOperating local colocation and hosting facility
Power arrangement

Alberta interconnected grid through EPCOR's Edmonton distribution system; 4WEB discloses a three-phase utility feed.

Capacity context
Not disclosedNo additional capacity context published.
Cooling and water
Not disclosedProject-specific cooling technology and routine water use have not been publicly disclosed.
Noise details
Not disclosedProject-specific noise details were not found in the public sources reviewed.
Verified
2026-09-01
Treaty geography
Treaty 6 territory
In service since
January 2008

Backup powerBackup generationBackup generators provide electricity when the normal supply is unavailable. They may also run for testing or maintenance.Installed capacity does not establish continuous operation, annual fuel use, or emissions. Operating hours and permit conditions are separate evidence.Learn more →: Operator-listed backup equipment includes a 130 kW generator connected by automatic transfer switch and an 80 kW APC UPS. These equipment ratings are not facility capacity.

Cologix CGY1

Verified listing

Cologix · City of Calgary · Commercial colocation

An operating downtown carrier-neutral interconnection facility formerly known as DataHiveOne.

View project detailsHide project details
400 kW facility capacity
Alberta grid · ENMAX
Fault-tolerant air conditioning with N+1 redundancy
Not disclosedNo project-specific values found
Current status
OperatingOperating carrier hotel acquired from DataHive in October 2025
Power arrangement

Alberta interconnected grid through ENMAX Power's Calgary distribution system, based on the published facility address.

Capacity context
400 kW facility capacityOperator-listed capacity for the current facility.
Cooling and water
Fault-tolerant air conditioning with N+1N+1 redundancyN is the number of units needed for the design load. The extra unit allows service to continue when one unit fails or is maintained.This describes redundancy. It does not identify the cooling technology or establish efficiency, water use, or environmental performance.Learn more → redundancyCologix says temperature, airflow, and humidity are monitored and regulated. It does not identify the heat-rejection method or disclose routine cooling-water use.
Noise details
Not disclosedProject-specific noise details were not found in the public sources reviewed.
Verified
2026-09-01
Treaty geography
Treaty 7 territory
In service since
Not publicly confirmed

Federal principles: Cologix is listed as a signatory to Canada's five responsible data-centre development principles. This is a company commitment, not a project approval or permit condition. What the five principles mean →

DataHiveTwo

Verified listing

DataHive · City of Calgary · Commercial colocation

An operating downtown Calgary facility offering private cloud, colocation, security, and archival data services.

View project detailsHide project details
Not disclosed
Alberta grid · ENMAX
Not disclosed
Not disclosedNo project-specific values found
Current status
OperatingOperating downtown data centre retained by DataHive after the sale of DataHiveOne
Power arrangement

Alberta interconnected grid through ENMAX Power's Calgary distribution system, based on the published facility address.

Capacity context
Not disclosedNo additional capacity context published.
Cooling and water
Not disclosedProject-specific cooling technology and routine water use have not been publicly disclosed.
Noise details
Not disclosedProject-specific noise details were not found in the public sources reviewed.
Verified
2026-07-31
Treaty geography
Treaty 7 territory
In service since
Not publicly confirmed

Equinix Calgary CL1

Verified listing

Equinix · City of Calgary · Commercial colocation

An operating Equinix interconnection and colocation facility in downtown Calgary.

View project detailsHide project details
Not disclosed
Alberta grid · ENMAX
N+20% cooling redundancy
Not disclosedNo project-specific values found
Current status
OperatingOperating carrier-neutral colocation facility
Power arrangement

Alberta interconnected grid through ENMAX Power's Calgary distribution system, based on the published facility address.

Capacity context
Not disclosedNo additional capacity context published.
Cooling and water
N+20% cooling redundancyEquinix discloses cooling redundancy but not the equipment type, heat-rejection method, or routine cooling-water use on the CL1 facility page.
Noise details
Not disclosedProject-specific noise details were not found in the public sources reviewed.
Verified
2026-09-01
Treaty geography
Treaty 7 territory
In service since
Not publicly confirmed

Federal principles: Equinix is listed as a signatory to Canada's five responsible data-centre development principles. This is a company commitment, not a project approval or permit condition. What the five principles mean →

Equinix Calgary CL2

Verified listing

Equinix · City of Calgary · Commercial colocation

An operating Equinix interconnection and colocation facility on Maynard Road in Calgary.

View project detailsHide project details
Not disclosed
Alberta grid · ENMAX
Free cooling with N+2 redundancy
Not disclosedNo project-specific values found
Current status
OperatingOperating carrier-neutral colocation facility
Power arrangement

Alberta interconnected grid through ENMAX Power's Calgary distribution system, based on the published facility address.

Capacity context
Not disclosedNo additional capacity context published.
Cooling and water
Free cooling with N+2 redundancyEquinix lists free cooling but does not identify the heat-rejection design or disclose routine cooling-water use on the CL2 facility page. Free cooling does not by itself establish waterlessWaterless coolingThis usually describes cooling that rejects heat without routinely evaporating water in cooling towers.It does not establish zero water use across the site, or the absence of cooling fluids. The full design and the scope of the claim matter.Learn more → operation.
Noise details
Not disclosedProject-specific noise details were not found in the public sources reviewed.
Verified
2026-09-01
Treaty geography
Treaty 7 territory
In service since
Not publicly confirmed

Federal principles: Equinix is listed as a signatory to Canada's five responsible data-centre development principles. This is a company commitment, not a project approval or permit condition. What the five principles mean →

Equinix Calgary CL3

Verified listing

Equinix · City of Calgary · Commercial colocation

An operating Equinix interconnection and colocation facility in southeast Calgary.

View project detailsHide project details
Not disclosed
Alberta grid · ENMAX
Free cooling with N+1 redundancy
Not disclosedNo project-specific values found
Current status
OperatingOperating carrier-neutral colocation facility
Power arrangement

Alberta interconnected grid through ENMAX Power's Calgary distribution system, based on the published facility address.

Capacity context
Not disclosedNo additional capacity context published.
Cooling and water
Free cooling with N+1N+1 redundancyN is the number of units needed for the design load. The extra unit allows service to continue when one unit fails or is maintained.This describes redundancy. It does not identify the cooling technology or establish efficiency, water use, or environmental performance.Learn more → redundancyEquinix also lists hot/cold-aisle containment, efficient humidity control, and decoupled dehumidification. It does not identify the heat-rejection design or disclose routine cooling-water use on the CL3 facility page.
Noise details
Not disclosedProject-specific noise details were not found in the public sources reviewed.
Verified
2026-09-01
Treaty geography
Treaty 7 territory
In service since
Not publicly confirmed

Federal principles: Equinix is listed as a signatory to Canada's five responsible data-centre development principles. This is a company commitment, not a project approval or permit condition. What the five principles mean →

eStruxture CAL-1

Verified listing

eStruxture Data Centers · City of Calgary · Commercial colocation

An operating high-density, Tier III certified commercial colocation facility in southeast Calgary.

View project detailsHide project details
9 MW facility capacity
Alberta grid · ENMAX
Redundant cooling modules with hot/cold-aisle containment
Not disclosedNo project-specific values found
Current status
OperatingOperating carrier-neutral colocation facility
Power arrangement

Alberta interconnected grid through ENMAX Power's Calgary distribution system, based on the published facility address.

Capacity context
9 MW facility capacityCurrent operator-listed facility capacity.
Cooling and water
Redundant cooling modules with hot/cold-aisle containmenteStruxture describes high-density redundant cooling modules, raised-floor airflow design, and N+1N+1 redundancyN is the number of units needed for the design load. The extra unit allows service to continue when one unit fails or is maintained.This describes redundancy. It does not identify the cooling technology or establish efficiency, water use, or environmental performance.Learn more → cooling. It does not identify the heat-rejection method or disclose routine cooling-water use.
Noise details
Not disclosedProject-specific noise details were not found in the public sources reviewed.
Verified
2026-09-01
Treaty geography
Treaty 7 territory
In service since
2015 (first data hall)

Federal principles: eStruxture is listed as a signatory to Canada's five responsible data-centre development principles. This is a company commitment, not a project approval or permit condition. What the five principles mean →

eStruxture CAL-2

Verified listing

eStruxture Data Centers · Rocky View County · Commercial colocation

An operating Tier III designed commercial colocation facility in the Balzac area.

View project detailsHide project details
26 MW current capacity
Alberta grid · Multiple feeds
Waterless free cooling
No receptor value published12 MW backup plant approved
Current status
OperatingOperating carrier-neutral colocation facility
Power arrangement

Alberta interconnected grid through multiple utility feeds; the operator does not publicly name the local wires provider, retailer, or generating plant.

Capacity context
26 MW current capacityThe current operator page lists 26 MW; the 2023 opening announcement described a 30 MW design.
Cooling and water
WaterlessWaterless coolingThis usually describes cooling that rejects heat without routinely evaporating water in cooling towers.It does not establish zero water use across the site, or the absence of cooling fluids. The full design and the scope of the claim matter.Learn more → free coolingThe operator says the cooling system does not consume water for routine heat rejection.
Noise details
No receptor value publishedAUC Decision 27614-D01-2022 approved CAL-2's 12 MW diesel backup plant, consisting of four generators intended for monthly testing and outages. ADCW did not identify a published project-specific receptor prediction or operating measurement in the August 29 review.
Verified
2026-07-31
Treaty geography
Treaty 7 territory
In service since
2023

County sector research: Rocky View County's August 2026 consultant report discusses infrastructure capacity, agricultural land, water, energy, and municipal policy. Council received it for information on September 22. It is not a site-specific study, a change to CAL-2's operating status, or an adopted strategy.

Federal principles: eStruxture is listed as a signatory to Canada's five responsible data-centre development principles. This is a company commitment, not a project approval or permit condition. What the five principles mean →

Fire Technology Torrington Cryptomining Facility

Verified listing

Fire Technology Corp. · Kneehill County · Cryptocurrency / Bitcoin mining

An operating cryptomining facility near Torrington with an on-site natural-gas power plant. The Alberta Utilities Commission approved a revised 9.4 MW generating configuration in June 2026.

View project detailsHide project details
9.5 MW facility name in Alberta's carbon registry
In June 2026, the AUC recorded 7.4 MW of installed generating capability and approved changes to the natural-gas plant. Completion of the revised configuration and the site's actual electricity use remain unverified.
Not disclosed
Not disclosedNo project-specific values found
Current status
OperatingKneehill County approved two additional units in April 2026. The AUC's June decision confirms Phase 1 of the associated gas plant was operating.
Power arrangement

In June 2026, the AUC recorded 7.4 MW of installed generating capability and approved changes to the natural-gas plant. Completion of the revised configuration and the site's actual electricity use remain unverified.

Capacity context
9.5 MW facility name in Alberta's carbon registryThe registry identifies the facility as the Torrington 9.5 MW cryptomining facility. This is a registered facility label, not a measurement of continuous electricity use.
Cooling and water
Not disclosedProject-specific cooling technology and routine water use have not been publicly disclosed.
Noise details
Not disclosedProject-specific noise details were not found in the public sources reviewed.
Verified
2026-11-22
Treaty geography
Treaty 7 territory
In service since
Not publicly confirmed

Original municipal file: Permit 4010-22-D covered a micropower-generation and cryptocurrency-mining facility at SE 28-32-26-W4M.

2026 expansion: Kneehill County's April 2026 approvals list APPN-2026-0020 for two additional units at the existing data centre.

Power plant approval history: The AUC first approved the plant in 2022 (27556), amended it in 2023 (28450), and approved another amendment in June 2026 (30730), extending the completion deadline to August 31, 2026.

Installed generation: Fire Technology reported starting Phase 1 operations at 3.5 MW in March 2023. The June 2026 decision records eight installed gas generators with 7.4 MW of maximum output and two replacement generators still awaiting delivery.

Registry evidence: Alberta's carbon registry lists the facility at LSD 8-28-32-26-W4M and shows 2023 emissions-performance credits. The registry does not establish the present number of mining units or operating load.

Hut 8 Drumheller

Evidence profile

Hut 8 Corp. · Drumheller · Cryptocurrency / ASIC compute

Hut 8's 42 MW Drumheller ASIC-compute facility, returned to service in March 2026 after a two-year shutdown.

Read evidence profile
Quick factsHide quick facts
42 MW listed site capacity
The current public sources identify the site capacity but do not publish its present electricity contract, supply mix or site-specific emissions.
Not disclosed in the reviewed current sources
Not disclosedNo project-specific values found
Current status
OperatingRe-energized in March 2026 and operating as ASIC colocation
Power arrangement

The current public sources identify the site capacity but do not publish its present electricity contract, supply mix or site-specific emissions.

Capacity context
42 MW listed site capacityHut 8 lists 42 MW for Drumheller. This is site capacity, not a measurement of continuous electricity use.
Cooling and water
Not disclosed in the reviewed current sourcesADCW did not find a current public figure for cooling-water withdrawalWithdrawal, consumption, and dischargeWithdrawal is water taken from a source. Consumption is the portion not returned to the same water system. Discharge is water released after use or treatment.These are different quantities. Check which one a water figure describes before comparing projects.Learn more →, consumption or discharge.
Noise details
Not disclosedProject-specific noise details were not found in the public sources reviewed.
Verified
2026-08-21
Location precision
Municipality centre →
Treaty geography
Treaty 7 territory
In service since
Not publicly confirmed

Hut 8 Medicine Hat

Evidence profile

Hut 8 Corp. · Medicine Hat · Cryptocurrency / ASIC compute

Hut 8's operating 67 MW Medicine Hat data centre, where American Bitcoin operates Bitcoin miners under Hut 8 service agreements.

Read evidence profile
Quick factsHide quick facts
67 MW listed site capacity
The facility was developed with municipal electricity supply
Not disclosed in the reviewed current sources
Not disclosedNo project-specific values found
Current status
OperatingOperating ASIC-compute facility listed by Hut 8 at 67 MW
Power arrangement

The facility was developed with municipal electricity supply; current site-specific supply terms and electricity mix were not found in the reviewed sources.

Capacity context
67 MW listed site capacityHut 8 lists 67 MW for Medicine Hat. This is site capacity, not a measurement of continuous electricity use.
Cooling and water
Not disclosed in the reviewed current sourcesADCW did not find a current public figure for cooling-water withdrawalWithdrawal, consumption, and dischargeWithdrawal is water taken from a source. Consumption is the portion not returned to the same water system. Discharge is water released after use or treatment.These are different quantities. Check which one a water figure describes before comparing projects.Learn more →, consumption or discharge.
Noise details
Not disclosedProject-specific noise details were not found in the public sources reviewed.
Verified
2026-08-22
Location precision
Exact site →
Treaty geography
Treaty 7 territory
In service since
2018

Qu Calgary CGY1

Verified listing

Qu Data Centres · City of Calgary · Commercial colocation

An operating 25,649-square-foot carrier-neutral Qu facility serving Calgary enterprise workloads.

View project detailsHide project details
2.6 MW utility capacity
Alberta grid · ENMAX
Powered mechanical cooling with one redundant unit (N+1)
Not disclosedNo project-specific values found
Current status
OperatingOperating commercial colocation facility
Power arrangement

Utility power from Alberta's interconnected grid through ENMAX Power's Calgary distribution system.

Capacity context
2.6 MW utility capacityCurrent utility capacity disclosed by Qu, not measured electricity consumption.
Cooling and water
Powered mechanical cooling with one redundant unit (N+1N+1 redundancyN is the number of units needed for the design load. The extra unit allows service to continue when one unit fails or is maintained.This describes redundancy. It does not identify the cooling technology or establish efficiency, water use, or environmental performance.Learn more →)Capacity: 510 refrigeration tons. Qu does not identify the heat-rejection method or disclose routine cooling-water use in the facility spec sheet.
Noise details
Not disclosedProject-specific noise details were not found in the public sources reviewed.
Verified
2026-07-31
Treaty geography
Treaty 7 territory
In service since
Not publicly confirmed

Backup powerBackup generationBackup generators provide electricity when the normal supply is unavailable. They may also run for testing or maintenance.Installed capacity does not establish continuous operation, annual fuel use, or emissions. Operating hours and permit conditions are separate evidence.Learn more →: One 1.5 MW and one 2 MW generator (3.5 MW combined nameplate), with on-site fuel for 24 hours at full load.

Qu Calgary CGY2

Verified listing

Qu Data Centres · City of Calgary · Commercial colocation

An operating 39,470-square-foot Qu facility in downtown Calgary.

View project detailsHide project details
1.8 MW utility capacity
Alberta grid · ENMAX
Powered mechanical cooling with one redundant unit (N+1)
Not disclosedNo project-specific values found
Current status
OperatingOperating commercial colocation facility
Power arrangement

Utility power from Alberta's interconnected grid through ENMAX Power's Calgary distribution system.

Capacity context
1.8 MW utility capacityQu says the utility capacity is upgradeable to 6 MW. These are capacity figures, not measured electricity consumption.
Cooling and water
Powered mechanical cooling with one redundant unit (N+1N+1 redundancyN is the number of units needed for the design load. The extra unit allows service to continue when one unit fails or is maintained.This describes redundancy. It does not identify the cooling technology or establish efficiency, water use, or environmental performance.Learn more →)Capacity: 960 refrigeration tons. Qu does not identify the heat-rejection method or disclose routine cooling-water use in the facility spec sheet.
Noise details
Not disclosedProject-specific noise details were not found in the public sources reviewed.
Verified
2026-07-31
Treaty geography
Treaty 7 territory
In service since
Not publicly confirmed

Backup powerBackup generationBackup generators provide electricity when the normal supply is unavailable. They may also run for testing or maintenance.Installed capacity does not establish continuous operation, annual fuel use, or emissions. Operating hours and permit conditions are separate evidence.Learn more →: Ten 375 kW generators, including one redundant unit beyond the required capacity (N+1). Combined nameplate capacity is 3.75 MW, with on-site fuel for 24 hours at full load.

Qu Calgary CGY3

Verified listing

Qu Data Centres · City of Airdrie · AI-ready colocation

Qu's operating 80,000-square-foot Airdrie facility, built for high-density AI, HPC, and enterprise workloads.

View project detailsHide project details
9 MW full-design capacity
Alberta grid · FortisAlberta
Powered mechanical cooling with one redundant unit (N+1)
Not disclosedNo project-specific values found
Current status
OperatingOperating Tier III certified colocation facility with AI and high-density workload support
Power arrangement

Utility power from Alberta's interconnected grid through FortisAlberta's Airdrie distribution system.

Capacity context
9 MW full-design capacityQu's expandable full-design capacity, not measured electricity consumption.
Cooling and water
Powered mechanical cooling with one redundant unit (N+1N+1 redundancyN is the number of units needed for the design load. The extra unit allows service to continue when one unit fails or is maintained.This describes redundancy. It does not identify the cooling technology or establish efficiency, water use, or environmental performance.Learn more →)Capacity: 1,450 refrigeration tons. Qu does not identify the heat-rejection method or disclose routine cooling-water use in the facility spec sheet.
Noise details
Not disclosedProject-specific noise details were not found in the public sources reviewed.
Verified
2026-07-31
Treaty geography
Treaty 7 territory
In service since
Not publicly confirmed

Backup powerBackup generationBackup generators provide electricity when the normal supply is unavailable. They may also run for testing or maintenance.Installed capacity does not establish continuous operation, annual fuel use, or emissions. Operating hours and permit conditions are separate evidence.Learn more →: Two 1 MW and two 2 MW generators, with one redundant unit beyond the required capacity (N+1). Combined nameplate capacity is 6 MW, with on-site fuel for 24 hours at full load.

Qu Edmonton EDM1

Verified listing

Qu Data Centres · City of Edmonton · Commercial colocation

An operating 18,000-square-foot downtown Edmonton colocation facility. Wolfpaw markets a dedicated restricted-access suite here as Wolfpaw EDM2.

View project detailsHide project details
2.5 MW facility capacity
Alberta grid · EPCOR
Powered mechanical cooling with one redundant unit (N+1)
Not disclosedNo project-specific values found
Current status
OperatingOperating commercial colocation facility in Edmonton's financial core
Power arrangement

Utility power from Alberta's interconnected grid through EPCOR's Edmonton distribution system.

Capacity context
2.5 MW facility capacityCurrent capacity disclosed by Qu, not measured electricity consumption.
Cooling and water
Powered mechanical cooling with one redundant unit (N+1N+1 redundancyN is the number of units needed for the design load. The extra unit allows service to continue when one unit fails or is maintained.This describes redundancy. It does not identify the cooling technology or establish efficiency, water use, or environmental performance.Learn more →)Capacity: 248 refrigeration tons. Qu does not identify the heat-rejection method or disclose routine cooling-water use in the facility spec sheet.
Noise details
Not disclosedProject-specific noise details were not found in the public sources reviewed.
Verified
2026-08-14
Treaty geography
Treaty 6 territory
In service since
Not publicly confirmed

Backup powerBackup generationBackup generators provide electricity when the normal supply is unavailable. They may also run for testing or maintenance.Installed capacity does not establish continuous operation, annual fuel use, or emissions. Operating hours and permit conditions are separate evidence.Learn more →: Three 1 MW generators, including one redundant unit beyond the required capacity (N+1). Combined nameplate capacity is 3 MW, with on-site fuel for 24 hours at full load.

Qu Edmonton EDM2

Verified listing

Qu Data Centres · City of Edmonton · AI-ready colocation

Qu's larger Edmonton facility, with 35,000 square feet across two expandable phases. Wolfpaw markets a dedicated restricted-access suite here as Wolfpaw EDM3.

View project detailsHide project details
3 MW Tier III capacity
Alberta grid · EPCOR
Powered mechanical cooling with one redundant unit (N+1)
Not disclosedNo project-specific values found
Current status
OperatingOperating Tier III certified colocation facility with AI and high-density workload support
Power arrangement

Utility power from Alberta's interconnected grid through EPCOR's Edmonton distribution system.

Capacity context
3 MW Tier III capacityQu also lists 2.5 MW at Tier II. These are capacity figures, not measured electricity consumption.
Cooling and water
Powered mechanical cooling with one redundant unit (N+1N+1 redundancyN is the number of units needed for the design load. The extra unit allows service to continue when one unit fails or is maintained.This describes redundancy. It does not identify the cooling technology or establish efficiency, water use, or environmental performance.Learn more →)Capacity: 1,450 refrigeration tons. Qu does not identify the heat-rejection method or disclose routine cooling-water use in the facility spec sheet.
Noise details
Not disclosedProject-specific noise details were not found in the public sources reviewed.
Verified
2026-08-14
Treaty geography
Treaty 6 territory
In service since
Not publicly confirmed

Backup powerBackup generationBackup generators provide electricity when the normal supply is unavailable. They may also run for testing or maintenance.Installed capacity does not establish continuous operation, annual fuel use, or emissions. Operating hours and permit conditions are separate evidence.Learn more →: Five 1 MW generators across two phases, with one redundant unit beyond the required capacity in each phase (N+1). Combined nameplate capacity is 5 MW. The spec sheet does not disclose fuel autonomy.

The Internet Centre

Verified listing

The Internet Centre Canada Inc. · City of Edmonton · Commercial colocation

An independently owned 3,000-square-foot south Edmonton data centre offering colocation, cloud hosting, and connectivity services.

View project detailsHide project details
Not disclosed
Alberta grid · EPCOR
Not disclosed
Not disclosedNo project-specific values found
Current status
OperatingOperating locally owned colocation and hosting facility
Power arrangement

Alberta interconnected grid through EPCOR's Edmonton distribution system, based on the published facility address.

Capacity context
Not disclosedNo additional capacity context published.
Cooling and water
Not disclosedProject-specific cooling technology and routine water use have not been publicly disclosed.
Noise details
Not disclosedProject-specific noise details were not found in the public sources reviewed.
Verified
2026-08-14
Treaty geography
Treaty 6 territory
In service since
Not publicly confirmed

Backup powerBackup generationBackup generators provide electricity when the normal supply is unavailable. They may also run for testing or maintenance.Installed capacity does not establish continuous operation, annual fuel use, or emissions. Operating hours and permit conditions are separate evidence.Learn more →: The operator confirms redundant power systems but does not publish equipment ratings or fuel autonomy.

ThinkTel Edmonton

Verified listing

ThinkTel Communications · City of Edmonton · Commercial colocation

An operating downtown Edmonton colocation facility offering server housing, power, bandwidth, and connectivity services.

View project detailsHide project details
Not disclosed
Alberta grid · EPCOR
Redundant HVAC climate control
Not disclosedNo project-specific values found
Current status
OperatingOperating telecommunications and colocation facility
Power arrangement

Alberta interconnected grid through EPCOR's Edmonton distribution system, based on the published facility address.

Capacity context
Not disclosedNo additional capacity context published.
Cooling and water
Redundant HVAC climate controlThinkTel does not disclose Edmonton-specific cooling equipment or routine water use.
Noise details
Not disclosedProject-specific noise details were not found in the public sources reviewed.
Verified
2026-08-14
Treaty geography
Treaty 6 territory
In service since
Not publicly confirmed

Backup powerBackup generationBackup generators provide electricity when the normal supply is unavailable. They may also run for testing or maintenance.Installed capacity does not establish continuous operation, annual fuel use, or emissions. Operating hours and permit conditions are separate evidence.Learn more →: ThinkTel says its colocation service includes generator-backed redundant power. Edmonton-specific equipment and fuel autonomy are not publicly disclosed.

Whipcord LDC01

Verified listing

Whipcord Edge · City of Lethbridge · Commercial colocation

Whipcord's operating Alberta data centre in Lethbridge, distinct from its Calgary network point of presence.

View project detailsHide project details
2.5 MW original Phase 1 utility power
Alberta grid · Lethbridge
Chilled-glycol system with chillers and dry coolers
Not disclosedNo project-specific values found
Current status
OperatingOperating Tier III designed colocation and managed-infrastructure facility
Power arrangement

Whipcord's original facility specification lists 2.5 MW of City of Lethbridge utility power for Phase 1. It identifies another 2.5 MW as a future Phase 2, which ADCW has not confirmed as completed or current capacity.

Capacity context
2.5 MW original Phase 1 utility powerWhipcord's facility specification lists 2.5 MW for Phase 1. It also identifies a future additional 2.5 MW Phase 2, but ADCW has not confirmed that expansion or the site's current total capacity.
Cooling and water
Chilled-glycol system with chillers and dry coolersDry coolingDry cooling releases heat to the air without relying on water evaporation for that heat rejection.Fans and other equipment still use electricity and can produce sound. Check whether the design also uses wet or water-assisted equipment during hot weather.Learn more →The original facility specification lists two 160-ton Daikin/McQuay chillers, two dry coolers, in-row cooling, and hot-aisle containment. It does not disclose routine water use.
Noise details
Not disclosedProject-specific noise details were not found in the public sources reviewed.
Verified
2026-09-01
Treaty geography
Treaty 7 territory
In service since
June 2011 (original facility completion)

Backup powerBackup generationBackup generators provide electricity when the normal supply is unavailable. They may also run for testing or maintenance.Installed capacity does not establish continuous operation, annual fuel use, or emissions. Operating hours and permit conditions are separate evidence.Learn more →: The original Phase 1 specification lists one 1.5 MW Cummins generator and two 800 kW APC Symmetra MW UPS units in a 2(N+1N+1 redundancyN is the number of units needed for the design load. The extra unit allows service to continue when one unit fails or is maintained.This describes redundancy. It does not identify the cooling technology or establish efficiency, water use, or environmental performance.Learn more →) arrangement. Current equipment configuration has not been independently confirmed.

Wolfpaw EDM1

Verified listing

Wolfpaw Data Centres Inc. · City of Edmonton · Commercial colocation

Wolfpaw's independently operated downtown Edmonton facility, connected by dark fibre to its restricted suites within Qu's two Edmonton data centres.

View project detailsHide project details
Not disclosed
Alberta grid · EPCOR
Fully redundant HVAC
Not disclosedNo project-specific values found
Current status
OperatingOperating Wolfpaw-owned colocation facility
Power arrangement

Alberta interconnected grid through EPCOR's Edmonton distribution system, based on the published facility address.

Capacity context
Not disclosedNo additional capacity context published.
Cooling and water
Fully redundant HVACWolfpaw does not disclose EDM1's heat-rejection method or routine cooling-water use.
Noise details
Not disclosedProject-specific noise details were not found in the public sources reviewed.
Verified
2026-08-14
Treaty geography
Treaty 6 territory
In service since
Not publicly confirmed

Backup powerBackup generationBackup generators provide electricity when the normal supply is unavailable. They may also run for testing or maintenance.Installed capacity does not establish continuous operation, annual fuel use, or emissions. Operating hours and permit conditions are separate evidence.Learn more →: Wolfpaw lists redundant UPS backup and on-site backup generation for EDM1. Equipment ratings and fuel autonomy are not fully disclosed in current operator materials.

Under construction5 projects

Projects with physical construction confirmed. Announced capacity and completion dates may still change by phase.

AHI Red Deer / Blindman Industrial Park AI Data Centre

Evidence profile

Havenz Smart Communities · Red Deer County · AI / High-performance computing

A Phase 1 modular AI data centre on a roughly 120-acre Blindman Industrial Park parcel. The first 10 MW power block is being built around natural-gas-fuelled, hydrogen-ready engines; hydrogen blending and conversion remain future plans.

Read evidence profile
Quick factsHide quick facts
10 MW Phase 1 on-site generation
10 MW Phase 1 on-site generation using natural gas. Future hydrogen blending is proposed, not current operation.
Waterless cooling design reported in the provincial project listing
22 receptors assessedValues not published
Current status
Under constructionRed Deer County approved the discretionary use on October 7, 2025, subject to conditions. Havenz says Phase 1 construction is underway, and the provincial registry lists the project as under construction
Power arrangement

10 MW Phase 1 on-site generation using natural gas. Future hydrogen blending is proposed, not current operation.

Capacity context
10 MW Phase 1 on-site generationHavenz describes the first power block as 10 MW. It is on-site generation capacity for the initial modular build, not a verified data-centre IT load.
Cooling and water
Waterless coolingWaterless coolingThis usually describes cooling that rejects heat without routinely evaporating water in cooling towers.It does not establish zero water use across the site, or the absence of cooling fluids. The full design and the scope of the claim matter.Learn more → design reported in the provincial project listingThe provincial registry describes a waterless design, while the County requires written confirmation of water consumptionWithdrawal, consumption, and dischargeWithdrawal is water taken from a source. Consumption is the portion not returned to the same water system. Discharge is water released after use or treatment.These are different quantities. Check which one a water figure describes before comparing projects.Learn more → and use. No project-specific demand, source, wastewater volume, or operating water record has been published.
Noise details
22 receptors assessedThe County report says the applicant's assessment considered 22 residential properties within 1.5 km and predicted compliance with AUC Rule 012. The approval requires hospital-plus-grade exhaust silencers, acoustic enclosures for the 1.5 MW backup generatorsBackup generationBackup generators provide electricity when the normal supply is unavailable. They may also run for testing or maintenance.Installed capacity does not establish continuous operation, annual fuel use, or emissions. Operating hours and permit conditions are separate evidence.Learn more →, and validation at receptor locations. Numerical tables were not included in the public report.
Verified
2026-09-07
Location precision
Approximate area →
Treaty geography
Near the mapped Treaty 6 / Treaty 7 boundary

Phase 1 footprint: A 1,000 m² (10,765 sq. ft.) modular data centre and a 471 m² (5,071 sq. ft.) administration building.

Environmental siting: Part of the parcel overlaps the Red Deer Canyon Environmentally Significant Area, but the County report places the development outside that area and the escarpments.

Traffic condition: A new traffic-impact assessment is required if development expands beyond Phase 1.

Bitdeer Fox Creek

Evidence profile

Bitdeer Technologies Group · Municipal District of Greenview No. 16 · Cryptocurrency / HPC-capable

An approximately 100 MW computing facility under construction near Fox Creek, paired with a 101.133 MW natural-gas power plant.

Read evidence profile
Quick factsHide quick facts
Approximately 100 MW computing capacity
Direct supply from an approved 101.133 MW on-site natural-gas plant, with a 99 MW AESO grid interconnection.
Closed-loop dry cooling proposed
Values not publishedPreliminary studies disclosed
Current status
Under constructionPower-plant construction began in June 2026; latest company schedule targets Q4 2027 energization
Power arrangement

Direct supply from an approved 101.133 MW on-site natural-gas plant, with a 99 MW AESO grid interconnection.

Capacity context
Approximately 100 MW computing capacityBitdeer currently lists cryptocurrency as the planned use while designing the facility to accommodate both cryptocurrency and AI data centre workloads.
Cooling and water
Closed-loopClosed-loop coolingCooling fluid circulates repeatedly through a contained loop instead of being routinely discharged after one pass.That describes the loop, not the whole site's water use. A separate heat-rejection system can still use water, and filling, maintenance, and leaks also matter.Learn more → dry coolingDry coolingDry cooling releases heat to the air without relying on water evaporation for that heat rejection.Fans and other equipment still use electricity and can produce sound. Check whether the design also uses wet or water-assisted equipment during hot weather.Learn more → proposedBitdeer says the project will not withdraw water from nearby surface-water bodies; other construction and facility water volumes are not disclosed.
Noise details
Values not publishedBitdeer says preliminary studies are guiding design toward Alberta nighttime limits and promises active monitoring after operations begin. It has not published receptor predictions or monitoring results.
Verified
2026-08-23
Location precision
Approximate area →
Treaty geography
Treaty 8 territory

Site area: 7.7 hectares (19 acres)

Latest planned use: Cryptocurrency, with a design intended to accommodate AI data centre workloads

eStruxture CAL-3

Evidence profile

eStruxture Data Centers · Rocky View County · AI-ready colocation

A 90 MW total-power, 70 MW critical-power AI-ready colocation facility under construction in Rocky View County.

Read evidence profile
Quick factsHide quick facts
90 MW total facility power
Alberta grid · FortisAlberta
Closed-loop water-based air and direct-to-chip liquid cooling
43–45 dBAPredicted nighttime sound with generators off
Current status
Under constructionUnder construction at 200 High Plains Common; eStruxture targets fall 2026 service and names CoreWeave as the Phase 1 anchor tenant
Power arrangement

Three independent FortisAlberta distribution lines are planned for Phase 1's 45 MW data-centre load. Proceeding 31020 seeks approval for 21 diesel emergency standby generators with 66.75 MW of total nameplate capacity and no grid export.

Capacity context
90 MW total facility powereStruxture's current data sheet lists 90 MW of total power and 70 MW of critical power. The 90 MW figure is design capacity, not measured operating demand.
Cooling and water
Closed-loopClosed-loop coolingCooling fluid circulates repeatedly through a contained loop instead of being routinely discharged after one pass.That describes the loop, not the whole site's water use. A separate heat-rejection system can still use water, and filling, maintenance, and leaks also matter.Learn more → water-based air and direct-to-chipLiquid coolingLiquid carries heat away from computing equipment, for example through cold plates at the chips.This describes how heat leaves the equipment. It does not identify how heat is ultimately released outside, or establish the site's water demand.Learn more → liquid coolingThe permit requires drinking-water and wastewater connections to High Plains Industrial Park systems. It identifies 2,560 L/day of water capacity for the property, with more to be purchased if needed. Actual use and cooling-water volumes are not published.
Noise details
43–45 dBAThe study predicts 43–45 dBA at four nearby locations with the generators off, and 47–53 dBA during daytime testing described as one generator at a time. Its equipment list also mentions ten per phase. It assessed an earlier design and does not show how loud an outage would be with several generators running together. eStruxture claims the smaller fleet would reduce generator sound, but supplies no updated predictions at nearby locations.
Verified
2026-11-03
Location precision
Exact site →
Treaty geography
Treaty 7 territory

Diesel use and carbon emissions: eStruxture estimates that 19 generators at the loads in its filing would use about 11,920 L of diesel and release 32 tonnes of carbon dioxide per hour. Actual fuel use and annual emissions depend on how often and how long the generators run.

Phase 1 building: 205,000 sq. ft., including 51,750 sq. ft. of data-hall whitespace across six halls.

Announced investment: More than CA$750 million for the full CAL-3 build, according to eStruxture and Alberta Major Projects.

Anchor tenant: CoreWeave has committed to an undisclosed portion of Phase 1; eStruxture separately says first-phase capacity is sold out.

AUC proceeding: The AUC issued Notice of Application 31020-F0005 on November 2, 2026 for Proceeding 31020, concerning the already-installed emergency standby generators. A decision remains pending; the notice is not an approval or operating authorization.

Federal principles: eStruxture is listed as a signatory to Canada's five responsible data-centre development principles. This is a company commitment, not a project approval or permit condition. What the five principles mean →

K-Tech and Aurora AZ Energy Compute Facility

Verified listing

K-Tech Solutions / Aurora AZ Energy · City of Calgary · Mixed AI / High-density compute

A reported 5 MW Alberta proof of concept combining wellhead natural-gas generation with AI, high-performance, and cryptocurrency computing. The exact site has not been publicly identified.

View project detailsHide project details
5 MW proof of concept under construction
Dedicated wellhead natural-gas generation supplied by Aurora. The parties say the model may use gas that would otherwise be flared, but project-specific fuel volumes and emissions are not disclosed.
Not disclosed
Not disclosedNo project-specific values found
Current status
Under constructionK-Tech reported construction and on-site testing in progress on a 5 MW proof of concept; the 100 MW flagship plan and potential 500 MW expansion remain prospective
Power arrangement

Dedicated wellhead natural-gas generation supplied by Aurora. The parties say the model may use gas that would otherwise be flared, but project-specific fuel volumes and emissions are not disclosed.

Capacity context
5 MW proof of concept under constructionK-Tech's June 2026 SEC filing says construction and on-site technical testing are in progress on the first 5 MW. This is the only portion currently identified as under construction.
Cooling and water
Not disclosedProject-specific cooling technology and routine water use have not been publicly disclosed.
Noise details
Not disclosedProject-specific noise details were not found in the public sources reviewed.
Verified
2026-08-23
Treaty geography
Treaty 7 territory

Current construction: K-Tech reported a 5 MW proof of concept under construction and undergoing on-site technical testing in June 2026.

Published roadmap: A 100 MW flagship site, with potential expansion toward 500 MW across additional power and land.

Joint venture ownership: The supplemental agreement assigns 75% of the proposed joint venture to K-Tech and 25% to Aurora.

Who is responsible for what: Aurora is responsible for the sites, land rights, wellhead generation, gas handling, electrical infrastructure, and related permits. K-Tech is responsible for data centre design, construction management, computing equipment, and operations.

Sturgeon Data Centre

Evidence profile

Meta Platforms, Inc. · Sturgeon County · Hyperscale / AI

Meta's announced 1 GW campus in Sturgeon County is under construction, with civil and infrastructure works documented since June 2026. Earlier evidence established site preparation and the October 20, 2026 piling-only permit; IAAC's November 10, 2026 response confirms the wider scope of works. Piling and main-building construction remain unverified.

Read evidence profile
Quick factsHide quick facts
1 GW announced data centre capacity
250 MW Capital Power supply agreement, plus an approved 932 MW dedicated natural-gas plant planned for later service.
Closed-loop liquid cooling with dry cooling
50.4 day / 43.1 night dBAModelled at residence; power plant only
Current status
Under constructionCivil and infrastructure works documented since June 2026 in IAAC's November 10, 2026 response; piling and main-building construction remain unverified. Federal designation is legally unavailable because work has substantially begun.
Power arrangement

250 MW Capital Power supply agreement, plus an approved 932 MW dedicated natural-gas plant planned for later service.

Capacity context
1 GW announced data centre capacityMeta announces 1 GW. Clark Builders reports approximately 1.6 GW of compute capacity; the difference is unresolved. ADCW retains Meta's figure, not a measured operating load.
Cooling and water
Closed-loopClosed-loop coolingCooling fluid circulates repeatedly through a contained loop instead of being routinely discharged after one pass.That describes the loop, not the whole site's water use. A separate heat-rejection system can still use water, and filling, maintenance, and leaks also matter.Learn more → liquid coolingLiquid coolingLiquid carries heat away from computing equipment, for example through cold plates at the chips.This describes how heat leaves the equipment. It does not identify how heat is ultimately released outside, or establish the site's water demand.Learn more → with dry coolingDry coolingDry cooling releases heat to the air without relying on water evaporation for that heat rejection.Fans and other equipment still use electricity and can produce sound. Check whether the design also uses wet or water-assisted equipment during hot weather.Learn more →Meta says no water will be used for routine cooling; other facility water needs remain.
Noise details
50.4 day / 43.1 night dBAGreenlight's filed Rule 012 model predicts 50.4 dBA daytime and 43.1 dBA nighttime cumulative sound at the only residence within 1.5 km of the power-plant boundary. Meta's data-centre equipment is not separately quantified.
Verified
2026-11-11
Location precision
Approximate area →
Treaty geography
Treaty 6 territory

Federal designation response: On November 10, 2026, the Impact Assessment Agency of Canada (IAAC) responded to the September 4, 2026 request. It found that work had substantially begun, so paragraph 9(7)(a) of the Impact Assessment Act prevents designation for federal assessment. This is not an environmental approval or a finding that effects are acceptable. The separate Greenlight power plant had already undergone federal review and was outside this designation review.

Piling-only permit: DP-26-0293 covers foundation pilings for Building DCB01 and Mechanical Yard MY01 at 56027 Range Road 223 (SE-3-56-22-W4M). Issued October 20, 2026; stated effective date and appeal deadline November 10, 2026. It does not confirm work has begun or authorize the entire building.

Builder-reported project size: Clark Builders lists 2.9 million sq. ft. This is a company disclosure, not confirmation of the approved building area or final campus footprint.

Site work: Clark Builders' earlier disclosure established site preparation. IAAC's November 10, 2026 response documents civil construction ongoing since June 2026, including utilities, roads, earthworks, and stormwater facilities. These documented works support ADCW's Under construction status. Piling and main-building construction remain unverified.

Associated power-plant ownership: Greenlight is owned by Pembina (47.5%), Morgan Stanley Infrastructure Partners (47.5%), and Kineticor (5%).

Associated power-plant cost: Greenlight reports an approximately CA$4.0 billion capital-cost estimate and an approximately CA$4.6 billion total project cost including CA$0.6 billion in interest during construction and other financing costs.

County development principles: Sturgeon County has published seven principles covering dedicated power, minimized water use, no municipal incentives, developer-funded infrastructure, heavy-industrial locations, reduced community impacts, and expected annual public reporting. The page does not identify every principle as a condition of this project's permit.

Annual public reporting: The County expects operators to report water use, noise levels, and nitrogen oxide emissions each year. This is a published expectation, not confirmation that reports exist or that it is an enforceable permit condition.

Federal principles: Meta is listed as a signatory to Canada's five responsible data-centre development principles. This is a company commitment, not a project approval or permit condition. What the five principles mean →

Approved7 projects

Projects with a major approval in place, but not yet confirmed as under construction. Other permits may still be required.

2661707 Alberta Ltd. Greenview Data Processing Centres

Verified listing

2661707 Alberta Ltd. · Municipal District of Greenview No. 16 · AI / General-purpose computing

Greenview approved eight modular data processing centres for 2661707 Alberta Ltd. on existing gas-well footprints in the Kaybob North area. ADCW groups them as one distributed-compute program because the applicant, facility design, setting, and power model are shared. A ninth application, D25-183, remains deferred.

View project detailsHide project details
Kaybob North area, M.D. of Greenview No. 16
Not disclosed
Proposed on-site natural-gas generation at each location. Greenview's March 2026 reports describe each generator as less than 1 MW
Not disclosed
Not disclosedEight approved sites; one deferred
Current status
ApprovedApprovedAn authority has issued a required approval for a specified part of the project, subject to its conditions.Other permits may still be needed. Approval does not establish construction or operation, and a power-plant approval does not automatically approve the data centre.Learn more →Eight discretionary municipal development permits are effective; a ninth application is deferred, and construction, provincial land authorization, Safety Codes permits, and operation remain unconfirmed
Power arrangement

Proposed on-site natural-gas generation at each location. Greenview's March 2026 reports describe each generator as less than 1 MW; no verified combined data centre load or generation capacity is public.

Capacity context
Not disclosedNo additional capacity context published.
Cooling and water
Not disclosedProject-specific cooling technology and routine water use have not been publicly disclosed.
Noise details
Not disclosedGreenview's permit conditions require compliance with municipal noise rules, but the reviewed records do not publish predicted receptor levels or a project-specific noise assessment. D25-183 was deferred while Council requested more information, including noise levels and impacts on recreational users.
Verified
2026-09-13
Location precision
Multiple legal land descriptions; no single representative map point
Treaty geography
Treaty 8 territory

Effective permits: D25-175 at SE-20-64-19-W5M, D25-176 at SW-35-64-19-W5M, D25-177 at SE-16-64-20-W5M, D25-178 at NE-14-64-20-W5M, and D25-179 at NE-24-64-20-W5M became effective March 4, 2026. D25-180 at NW-06-65-18-W5M, D25-181 at NW-01-65-19-W5M, and D25-182 at NW-19-64-19-W5M became effective April 1, 2026.

Deferred application: D25-183 at NW-23-64-19-W5M was deferred on March 11, 2026, pending more information on environmental impacts, noise levels, impacts on recreational users, and circulation to other users such as trap-line holders. ADCW found no later decision in the reviewed 2026 Greenview meeting records.

Shared design: Municipal reports describe modular facilities using a 40-foot server container and a 40-foot natural-gas generator container within existing disturbed gas-well sites for artificial-intelligence and general-purpose computing.

Approval limits: The municipal permits do not establish that construction or operation has started. The applicant remains responsible for Safety Codes permits and other provincial authorizations. Greenview's reports say Alberta Forestry and Parks was not accepting Public Lands Act applications for this activity while provincial policy work was underway.

Athill Carbon-Area Data Centre

Verified listing

Athill Tech Solution Ltd. · Kneehill County · Cryptocurrency / Bitcoin-mining proposal

An approved Bitcoin-mining development approximately 10 kilometres southwest of Carbon. The February 13, 2024 plan described a 2.23-acre site with 20 containers and 9.97 MW of gas generation. Phase 1 (4.425 MW) was reported commissioned on October 30, 2025; Athill reported construction complete for Phase 2 (5.545 MW) on April 28, 2026. Phase 2 commissioning and current mining operation remain unconfirmed.

View project detailsHide project details
9.97 MW approved natural-gas generation
9.97 MW gas plant: Phase 1 reported commissioned October 30, 2025
Not disclosed
Not disclosedNo project-specific values found
Current status
ApprovedApprovedAn authority has issued a required approval for a specified part of the project, subject to its conditions.Other permits may still be needed. Approval does not establish construction or operation, and a power-plant approval does not automatically approve the data centre.Learn more →Approved data-centre development; Athill reported Phase 1 commissioned October 30, 2025 and Phase 2 construction complete in an April 28, 2026 AUC filing. Phase 2 commissioning and current data-centre operation are not confirmed
Power arrangement

9.97 MW gas plant: Phase 1 reported commissioned October 30, 2025; Phase 2 construction reported complete April 28, 2026. Phase 2 commissioning and current operating load remain unconfirmed.

Capacity context
9.97 MW approved natural-gas generationThe original 2024 design total remains 9.97 MW. The July 2025 approval set completion for November 30, 2025; the November 24, 2025 decision split the plant into 4.425 MW and 5.545 MW phases and extended Phase 2 completion to March 31, 2026. Athill’s April 28, 2026 notice reports Phase 2 construction complete. It gives no exact completion date or Phase 2 commissioning confirmation. Generation capacity is not computing load.
Cooling and water
Not disclosedProject-specific cooling technology and routine water use have not been publicly disclosed.
Noise details
Not disclosedProject-specific noise details were not found in the public sources reviewed.
Verified
2026-11-05
Treaty geography
Treaty 7 territory

Municipal approval: Kneehill County approved file 4152-24-D for a power plant and data centre on part of SE 24-28-24-W4M in April 2024.

Approval history: The November 24, 2025 decision dates original power-plant approval to November 23, 2023. Proceeding 30144 extended the completion deadline in July 2025 after Athill reported pipeline work, civil work, fencing, and procurement substantially advanced. Proceeding 30379 later split the approval into two phases; approvals 30379-D02-2025 and 30379-D03-2025 rescinded the previous single approval 30144-D02-2025.

Phase 1 commissioning: Decision 30379-D01-2025 records Athill’s confirmation that three 1.475 MW gas generators, totalling 4.425 MW, were commissioned on October 30, 2025. The decision does not establish how many mining containers were operating or their electrical load.

Phase 2 construction complete: After equipment issues delayed Phase 2, Approval 30379-D03-2025 extended construction completion to March 31, 2026 and required notification within 30 days of completion. In its April 28, 2026 Direction Response 30379-D03-2025-0001, Athill notified the AUC that Phase 2 construction was complete. The letter does not state the exact completion date or confirm commissioning. Phase 2 comprises three 1.475 MW generators and one 1.12 MW generator, totalling 5.545 MW.

Original site plan: The February 13, 2024 County hearing report describes a 2.23-acre lease with 20 data-centre containers, seven generators, and an office trailer. This is the proposed layout, not a verified installation inventory.

Intended use correction: ADCW previously listed the workload as undisclosed. The February 13, 2024 County report explicitly describes Bitcoin mining; current computing activity remains unconfirmed.

Fuel and access: The same report identifies planned gas supply from adjacent Ember Resources infrastructure and access via Highway 21. The workspace is within SE 24-28-24-W4M; NE 13-28-24-W4M is identified for access only.

Companies and land: The County report names Britestone Hutterian Brethren Church as landowner and SABR Energy Consulting Inc. as Athill's agent. It describes Athill as affiliated with Great Lake Power Ltd., without establishing ownership percentages.

What remains unknown: Athill has reported Phase 1 commissioning and Phase 2 construction completion. Phase 2 commissioning, current computing activity and electrical load, installed mining-container count, and present operating status remain unconfirmed. Cooling design and routine water use also remain unconfirmed.

Emerson Trail Data Centre

Verified listing

Not publicly confirmed · County of Grande Prairie No. 1 · Data centre / Workload undisclosed

Emerson Trail's County development permit is under appeal, with a preliminary hearing scheduled for October 26, 2026. The permit is for five buildings, 15 generators, and 15 makeup-air/cooling units. Electricity demand, water needs, and the final power supply remain unconfirmed. Council is now considering zoning changes that would give residents an earlier opportunity to comment on future data centre proposals.

View project detailsHide project details
Not disclosed
The permit includes 15 generators, but their capacity, fuel, and role are unconfirmed. It does not approve the facility's final power supply or electricity demand.
Fifteen makeup-air/cooling units included in the permit; cooling design unconfirmed
Not disclosedNo project-specific values found
Current status
ApprovedApprovedAn authority has issued a required approval for a specified part of the project, subject to its conditions.Other permits may still be needed. Approval does not establish construction or operation, and a power-plant approval does not automatically approve the data centre.Learn more →Permit under appeal; preliminary Land and Property Rights Tribunal (LPRT) hearing October 26, 2026. The County issued PLDEV20250629 on September 4, 2026. The preliminary hearing is a procedural step, not a confirmed date for a decision on the permit.
Power arrangement

The permit includes 15 generators, but their capacity, fuel, and role are unconfirmed. It does not approve the facility's final power supply or electricity demand.

Capacity context
Not disclosedNo additional capacity context published.
Cooling and water
Fifteen makeup-air/cooling units included in the permit; cooling design unconfirmedThe County says the permit does not establish or approve water use. Water needs will depend on the final design and cooling system.
Noise details
Not disclosedProject-specific noise details were not found in the public sources reviewed.
Verified
2026-10-19
Treaty geography
Treaty 8 territory

What the permit covers: PLDEV20250629 was issued September 4, 2026, for a data processing establishment on SW-14-73-6-W6. The permit register listed five 80-by-180-foot buildings, 15 generator structures, and 15 makeup-air/cooling structures. The buildings would have a combined footprint of about 72,000 square feet if built as listed. Permit conditions and other required approvals must be met before the project can proceed.

Why neighbours were not notified: The County says a data processing establishment was already a permitted use under the property's industrial zoning, so the permit application was not circulated to adjacent landowners. Public consultation took place during the earlier rezoning process. Those are separate decisions: zoning sets the allowed uses, while a development permit addresses the proposed development.

Proposed rules for future data centres: On October 5, 2026, Council gave first reading to Bylaw 2680-26-046. It would create a Data Centre Campus (DAT) district and remove Data Processing Establishment from all other land use districts. Future proposals would need to apply for this specific zoning before a development permit could be considered, identifying the intended use earlier. The bylaw is not yet approved. The County says Council cannot overturn the existing permit.

How residents can take part: The County is accepting feedback through its Engage page or at datacentres@countygp.ab.ca. A public hearing on the proposed bylaw is scheduled for December 2, 2026, at 1:00 p.m. in Council Chambers. Registration to speak closes November 27, 2026; the Engage page explains in-person and remote participation. This hearing concerns future planning rules, not an appeal of Emerson Trail's existing permit.

Permit appeal: preliminary hearing: The permit allows five main buildings instead of one and reduces the setback between buildings from 45 to 35 metres. The County confirms that PLDEV20250629 was appealed to the Land and Property Rights Tribunal (LPRT). The appeal-submission period closed September 25, 2026, and a preliminary hearing is scheduled for October 26, 2026. This is a procedural hearing; it should not be read as a scheduled final decision on whether the permit stands. An appeal outcome remains unconfirmed.

Earlier land-use decisions: On August 10, 2026, Council gave final reading to Bylaws 2680-26-031 and 2680-26-032 for industrial rezoning in the Emerson Trail area. Both include portions of SW-14-73-6-W6, the quarter-section on the permit. The reviewed records do not establish the exact overlap with this site.

Three permits, different approval scopes: The County timeline identifies PLDEV20250629 as the third permit for lands in the Emerson Trail area. In May 2026, PLDEV20260129 approved a data processing establishment on land already zoned Rural Medium Industrial (RM-2), while PLDEV20260127 approved five speculative buildings and related infrastructure without approving a specific use. ADCW is reviewing the May data-processing permit separately to establish its relationship to this proposal; it is not counted as another public project.

What residents still cannot assess: The reviewed records do not confirm the developer or operator, computing workload, generator capacity or fuel, cooling design, water needs, or sound at nearby communities. The County says power generation, grid connections, water use, and environmental requirements involve separate approvals. The municipal permit does not settle those questions or guarantee that the facility will be built.

Pathfinder Rocky 5 Bitcoin Mining Project

Verified listing

Pathfinder Energy Ltd. under court-appointed receivership · Clearwater County · Cryptocurrency / Bitcoin mining

A 60 MW approved gas-powered Bitcoin-mining project near Rocky Mountain House. The AUC recorded 10 MW installed in 2025, but Pathfinder and MCK later entered receivership, and ADCW did not find current evidence that the compute facility remains active.

View project detailsHide project details
60 MW approved natural-gas generation
The AUC approval covers fifty 1.2 MW natural-gas generators for 60 MW total. Ten megawatts had been installed when Pathfinder sought its 2025 extension
Not disclosed
Operating measurement not foundAUC approval conditions
Current status
ApprovedApprovedAn authority has issued a required approval for a specified part of the project, subject to its conditions.Other permits may still be needed. Approval does not establish construction or operation, and a power-plant approval does not automatically approve the data centre.Learn more →AUC approval remains documented, but Pathfinder and MCK entered receivership in October 2025; current ownership, construction, and operating status are unresolved
Power arrangement

The AUC approval covers fifty 1.2 MW natural-gas generators for 60 MW total. Ten megawatts had been installed when Pathfinder sought its 2025 extension; the remaining build and current operation are not confirmed.

Capacity context
60 MW approved natural-gas generationApproval 29846-D02-2025 authorizes fifty 1.2 MW generators. This is approved generation capacity, not evidence of completed construction or operating load.
Cooling and water
Not disclosedProject-specific cooling technology and routine water use have not been publicly disclosed.
Noise details
Operating measurement not foundThe approval requires specified mitigation and a comprehensive post-construction sound survey, including low-frequency noise at two residences, within one year after operations begin. ADCW did not find a current operating survey.
Verified
2026-09-16
Treaty geography
Treaty 6 territory

Receivership: A court-appointed receiver took control of Pathfinder Energy Ltd. and MCK Energy Inc. effective October 15, 2025. The receiver's sale and investment process includes the companies' assets and operations.

Current-status boundary: The AUC approval is not transferable without Commission approval. ADCW did not find a current ownership transfer, construction-completion notice, or evidence that Bitcoin-mining operations continue.

Radiant Ridge Wetwin / Nordcon 1 Data Centre

Evidence profile

Radiant Ridge Energy Limited (applicant) · County of Wetaskiwin · Bitcoin mining (proposed)

Radiant Ridge proposes an 860 ft² off-grid Bitcoin-mining facility on a Norwegian Energy lease southwest of Wetaskiwin. The County conditionally approved D26/169 on August 27, 2026. The permit was appealed, and the outcome is unverified. The proposed gas power system is described as 980 kW in technical filings and 990 kW in the April 22, 2026 handout. The March 27, 2026 noise study modelled four 300 kW generators.

Read evidence profile
Quick factsHide quick facts
Not disclosed
Proposed off-grid gas generation. Technical reports describe 980 kW, the April 22, 2026 handout lists 990 kW maximum station output, and the March 27, 2026 noise study modelled four 300 kW units. The final rating and actual data centre demand are unverified.
Air cooling described in the handout and November submissions. The noise study modelled liquid-cooled mining equipment.
39.1 dBA modelled at nightNearest modelled dwelling, with mitigation
Current status
ApprovedApprovedAn authority has issued a required approval for a specified part of the project, subject to its conditions.Other permits may still be needed. Approval does not establish construction or operation, and a power-plant approval does not automatically approve the data centre.Learn more →County development permit D26/169 was conditionally approved on August 27, 2026 and is under appeal. The outcome and current work authorization remain unverified.
Power arrangement

Proposed off-gridNon-grid-connectedThe facility has no electrical connection to Alberta's interconnected grid and relies on supply available to the site.It does not directly draw from or send electricity to that grid. Power-plant approvals and local impacts can still matter.Learn more → gas generation. Technical reports describe 980 kW, the April 22, 2026 handout lists 990 kW maximum station output, and the March 27, 2026 noise study modelledModelled versus measuredA modelled result is a prediction based on inputs and assumptions. A measured result comes from observations or instruments under particular conditions.A prediction is not verified operating performance. Check the location, period, operating scenario, and what the reported number actually represents.Learn more → four 300 kW units. The final rating and actual data centre demand are unverified.

Capacity context
Not disclosedNo additional capacity context published.
Cooling and water
Air cooling described in the handout and November submissions. The noise study modelled liquid-cooledLiquid coolingLiquid carries heat away from computing equipment, for example through cold plates at the chips.This describes how heat leaves the equipment. It does not identify how heat is ultimately released outside, or establish the site's water demand.Learn more → mining equipment.Radiant Ridge and the County say the proposed facility would use no water. The final cooling design, water balance, and handling of fluids from gas production remain unverified.
Noise details
39.1 dBA modelled at nightThe consultant modelled 39.1 dBA against a 40 dBA nighttime limit about 505 m from the site, with the equipment southwest on the pad and a minimum 4 m south berm. The permit calls for a 4 m perimeter berm and separate property-boundary limits. The noise conditions were appealed.
Verified
2026-11-26
Location precision
Approximate area →
Treaty geography
Treaty 6 territory

SAIDI / MAGA Westlock Cryptocurrency Facility

Evidence profile

SAIDI (Canada) Ltd. and MAGA Energy Ltd.; transfer to SAIDI requested · Westlock County · Cryptocurrency mining

SAIDI and MAGA hold AUC approval for a 9 MW off-grid natural-gas plant designed to power ten on-site cryptocurrency data-centre units near Hazelbluff. The generating equipment is installed but remains shut down under a Westlock County Stop Order. SAIDI is seeking sole control of the approval and a late construction extension, while operation depends on restoring gas supply through MAGA assets subject to AER abandonment and reclamation requirements.

Read evidence profile
Quick factsHide quick facts
9 MW approved natural-gas generation
The project is designed around off-grid gas generation. No grid connection or electricity sale is proposed. The only proposed fuel source is MAGA-related facility F13447 and associated wells and pipelines
Not established in the reviewed record
2 m earth berm requiredSouth, west, and north sides before operation
Current status
ApprovedApprovedAn authority has issued a required approval for a specified part of the project, subject to its conditions.Other permits may still be needed. Approval does not establish construction or operation, and a power-plant approval does not automatically approve the data centre.Learn more →AUC-approved 9 MW plant remains incomplete and shut down under a Westlock County Stop Order; time-extension and approval-transfer applications are under review, with no viable alternative gas source established
Power arrangement

The project is designed around off-gridNon-grid-connectedThe facility has no electrical connection to Alberta's interconnected grid and relies on supply available to the site.It does not directly draw from or send electricity to that grid. Power-plant approvals and local impacts can still matter.Learn more → gas generation. No grid connection or electricity sale is proposed. The only proposed fuel source is MAGA-related facility F13447 and associated wells and pipelines; no alternative source is identified.

Capacity context
9 MW approved natural-gas generationThe AUC approved ten 900 kW generators serving ten on-site cryptocurrency data-centre units. Approval does not establish completed construction or lawful operation.
Cooling and water
Not established in the reviewed recordCooling design and water demand for the computing units are not quantified in the reviewed record.
Noise details
2 m earth berm requiredThe AUC-approved noise mitigation berm has not been built. The applicants say it will be completed before operation; this is a commitment, not completed mitigation.
Verified
2026-10-29
Location precision
Approximate area →
Treaty geography
Treaty 6 territory

AUC proceeding: Proceeding 31085 covers the proposed transfer of MAGA's full approval interest to SAIDI and a late request to move the construction deadline to December 31, 2026.

Municipal status: Development Permit 25-088 remains subject to outstanding requirements. The Development Agreement is unsigned, no power-plant reclamation security has been posted, and building and electrical permits remain unresolved.

Fuel dependency: SAIDI targets April 2027 operation, but says the plant cannot operate until a separate purchaser completes the proposed gas-asset acquisition and the AER permits lawful operation.

Woodcote Big Lakes Cryptocurrency Facility

Verified listing

Woodcote Inc. · Big Lakes County · Cryptocurrency mining

Big Lakes County approved a cryptocurrency-mining development on an existing oil and gas lease north of the Lesser Slave Lake Narrows. The application describes mining equipment in a shipping container and an on-site natural-gas generator building. The applicant expects generation below 1 MW; construction and operation are unconfirmed.

View project detailsHide project details
SW 7-76-9-W5, north of Lesser Slave Lake Narrows, Big Lakes County
Not disclosed
The County's September 22, 2026 application report says an on-site natural-gas generator would supply the mining equipment. The applicant expects associated generation below 1 MW, but the report gives no exact capacity or measured electricity use.
Air cooling with fans, according to the County application report
Not disclosedGenerator and cooling fans
Current status
ApprovedApprovedAn authority has issued a required approval for a specified part of the project, subject to its conditions.Other permits may still be needed. Approval does not establish construction or operation, and a power-plant approval does not automatically approve the data centre.Learn more →Big Lakes County lists development permit 26-D0053 as approved; an appeal may be filed by October 13, 2026. Construction and operation are not confirmed.
Power arrangement

The County's September 22, 2026 application report says an on-site natural-gas generator would supply the mining equipment. The applicant expects associated generation below 1 MW, but the report gives no exact capacity or measured electricity use.

Capacity context
Not disclosedNo additional capacity context published.
Cooling and water
Air cooling with fans, according to the County application reportThe report says no water will be used for cooling. Other site water needs are not quantified.
Noise details
Not disclosedThe County report expects sound from the generator and cooling fans but provides no project-specific sound measurements or modelledModelled versus measuredA modelled result is a prediction based on inputs and assumptions. A measured result comes from observations or instruments under particular conditions.A prediction is not verified operating performance. Check the location, period, operating scenario, and what the reported number actually represents.Learn more → levels.
Verified
2026-09-24
Location precision
Legal quarter-section confirmed; map coordinates not independently verified
Treaty geography
Treaty 8 territory

Municipal approval: Big Lakes County lists permit 26-D0053 for cryptocurrency data mining as an approved discretionary use. The public notice sets an October 13, 2026 appeal deadline.

Crown land: The County report says Alberta Forestry and Parks issued disposition DLO260101 for cryptocurrency use, effective July 3, 2026 to January 23, 2048.

Project site: The application places the mining container and generator building within an existing oil and gas lease on SW 7-76-9-W5.

Proposed44 projects

Projects that are announced, in planning, consulting, or under review. A proposal is not permission to build.

AmpBase Vulcan Data Centre

Verified listing

AmpBase Data Centers Inc. (applicant) · Vulcan County · Data centre; workload unconfirmed

AmpBase Data Centers Inc. proposes an approximately 75 MW data centre in Vulcan County Industrial Park, near the Town of Vulcan. The June 30, 2026 application seeks a land-use amendment. The exact lot, building footprint, and development permit are unverified.

View project detailsHide project details
74 MW AESO grid connection request
AESO lists a 74 MW grid connection request under P3348, Vulcan Data Load. The county application separately describes approximately 75 MW of facility capacity.
Not disclosed
Not disclosedNo project-specific values found
Current status
ProposedVulcan County held a public hearing on November 13, 2026, and listed second and final readings of Bylaw 2026-023 on its November 18, 2026 agenda. The vote outcome and a project-specific development permit are unverified.
Power arrangement

AESO lists a 74 MW grid connection requestGrid connection requestA request for new or changed electricity delivery capacity through the Alberta Electric System Operator (AESO).Requested capacity is not measured electricity use, a guaranteed connection, or approval to build a data centre.Learn more → under P3348, Vulcan Data Load. The county application separately describes approximately 75 MW of facility capacity.

Capacity context
74 MW AESO grid connection requestThe Alberta Electric System Operator's November 2026 list shows P3348 as an active Stage 1 request, with February 1, 2030 as the listed in-service date. Grid service and the opening date remain unconfirmed.
Cooling and water
Not disclosedProject-specific cooling technology and routine water use have not been publicly disclosed.
Noise details
Not disclosedProject-specific noise details were not found in the public sources reviewed.
Verified
2026-11-20
Treaty geography
Treaty 7 territory

Land-use amendment: Bylaw 2026-023 would let the Municipal Planning Commission consider data processing operations as a discretionary use in the industrial park. A separate development permit would still be required. County staff identify application requirements that include a noise assessment, fire protection plans, and details on grid supply or on-site generation.

Grid request and proposed facility capacity: AmpBase's application describes approximately 75 MW of facility capacity. The AESO request specifies 74 MW of grid capacity. The filings do not explain how the two figures relate or explicitly tie P3348 to AmpBase.

Armada Nowlit Data Centre Southeast of Clive

Evidence profile

Armada Nowlit Energy Ltd. · Lacombe County · Mixed AI / Cryptocurrency

A proposed approximately 19.8 MW natural-gas-powered modular facility southeast of Clive. The project is marketed for AI and digital-asset computing, while its submitted air model describes nine miner containers.

Read evidence profile
Quick factsHide quick facts
19.8 MW proposed on-site generation
Proposed 19.8 MW on-site natural-gas generation with biofuel capability. No active project-specific Clive AUC proceeding was identified
Closed-loop dry cooling proposed
36.0 dBAPredicted nighttime total at closest assessed residence
Current status
ProposedA 4.40-acre Agricultural-to-Heavy-Industrial redesignation is under review. Lacombe County says rezoning must precede a development-permit application, where the data processing centre would be a discretionary use. No municipal approval is confirmed; the developer meeting is September 30, 2026.
Power arrangement

Proposed 19.8 MW on-site natural-gas generation with biofuel capability. No active project-specific Clive AUC proceedingAUC proceedingA proceeding is the Alberta Utilities Commission's formal record for reviewing an application, including evidence, submissions, and a decision when issued.A proceeding number helps locate the record. The existence of a proceeding does not mean the application has been approved.Learn more → was identified; proceedings 30385, 30476, and 30709 concern the separate Gayford facility.

Capacity context
19.8 MW proposed on-site generationNine proposed 2.2 MW generator sets. This is gross generation capacity, not a verified data-centre load.
Cooling and water
Closed-loopClosed-loop coolingCooling fluid circulates repeatedly through a contained loop instead of being routinely discharged after one pass.That describes the loop, not the whole site's water use. A separate heat-rejection system can still use water, and filling, maintenance, and leaks also matter.Learn more → dry coolingDry coolingDry cooling releases heat to the air without relying on water evaporation for that heat rejection.Fans and other equipment still use electricity and can produce sound. Check whether the design also uses wet or water-assisted equipment during hot weather.Learn more → proposedThe developer proposes a sealed loop with dry coolers, a roughly 1,500 L service-water tank, and off-site wastewater servicing with no dischargeWithdrawal, consumption, and dischargeWithdrawal is water taken from a source. Consumption is the portion not returned to the same water system. Discharge is water released after use or treatment.These are different quantities. Check which one a water figure describes before comparing projects.Learn more → to land. Earlier materials describe a 250–300 L initial fill per unit without enough detail to calculate total or annual water use.
Noise details
36.0 dBAThe developer reports a 36.0 dBA predicted nighttime total at the closest assessed residence against a stated 40 dBA limit. Earlier application-case modelling gives 35.3–35.9 dBA across receptors and 35.4–36.2 dBA cumulatively. These are modelledModelled versus measuredA modelled result is a prediction based on inputs and assumptions. A measured result comes from observations or instruments under particular conditions.A prediction is not verified operating performance. Check the location, period, operating scenario, and what the reported number actually represents.Learn more → results, not operating measurements.
Verified
2026-09-29
Location precision
Exact site →
Treaty geography
Treaty 6 territory

Armada Nowlit Kneehill Cryptocurrency-Mining Proposal

Verified listing

Armada Nowlit Power Ltd. · Kneehill County · Cryptocurrency mining

A proposed cryptocurrency-mining facility approximately six kilometres southeast of Linden, on part of SE 11-30-25 W4M. Four mining/data-processing units would be powered by four 2.2 MW natural-gas generators, totalling 8.8 MW. Rezoning, power-plant approval, and environmental approval remain unresolved in the reviewed records; site acreage and construction timing are unconfirmed.

View project detailsHide project details
8.8 MW proposed on-site generation
Proposed 8.8 MW on-site natural-gas generation for cryptocurrency mining, cooling, electrical distribution, and auxiliary equipment. No grid connection or power export is proposed.
Cooling fans included in the noise model; full system unconfirmed
36.7 dBAModelled maximum residential nighttime total
Current status
ProposedRezoning and power-plant applications remain under review. County written submissions are due November 19, 2026; AUC participation requests November 23, 2026; the County hearing is November 24, 2026.
Power arrangement

Proposed 8.8 MW on-site natural-gas generation for cryptocurrency mining, cooling, electrical distribution, and auxiliary equipment. No grid connection or power export is proposed.

Capacity context
8.8 MW proposed on-site generationFour proposed 2.2 MW natural-gas generators under AUC Application 31109-A001. Generation capacity is not a separately verified computing load or measured electricity consumption.
Cooling and water
Cooling fans included in the noise model; full system unconfirmedThe reviewed documents do not establish cooling-water demand, water source, or a water authorization. The presence of fans does not establish a dry or water-free cooling system.
Noise details
36.7 dBAThe September 3, 2026 assessment's Table 5 predicts a maximum residential nighttime total of 36.7 dBA, including the project, neighbouring compressor station, and an assumed 35 dBA ambient background, against its assessed 40 dBA limit. This is a prediction, not an operating measurement or AUC finding. In X0014, Armada commits to hospital-grade exhaust mufflers and an updated noise assessment once detailed design is complete.
Verified
2026-11-16
Treaty geography
Treaty 7 territory

Municipal application: Kneehill County gave Bylaw 1939 first reading on October 13, 2026, to consider changing part of SE 11-30-25 W4M from Agriculture to Light Industrial for the proposed facility. First reading is not rezoning approval or a development permit.

County hearing and submissions: The County public hearing is November 24, 2026, at 10 a.m., in Council Chambers at 1600 2nd Street NE, Three Hills. Written submissions are due November 19, 2026, at noon. The County notice explains submission and remote-participation arrangements.

AUC application and participation: The Alberta Utilities Commission's October 26, 2026 notice identifies Proceeding 31109, Application 31109-A001, and a November 23, 2026 deadline for statements of intent to participate. This is separate from the County process. The notice says all generated electricity would be consumed on site, with no export to Alberta's interconnected system.

Equipment and design: The noise assessment describes four enclosed 2.2 MW MWM TCG3020 V20 generator sets and four enclosed data centres with cooling fans and transformers, intended for continuous operation. Armada's X0014 response says equipment selection is finalized, detailed design remains in progress, and an updated noise assessment will be submitted.

Sound at nearby communities: The noise model flags possible low-frequency tonal components at several receptors, although the consultant anticipates no tonal issues. Its blanket statement that industrial contributions are below 30 dBA conflicts with Table 5's 31.8 dBA at R-01; Appendix V also gives inconsistent R-01 details. ADCW uses Table 5 and treats the results as provisional pending the promised update. Armada commits to investigating operational exceedances and adding mitigation as needed.

Revised air-quality model: Calvin Consulting's October 22, 2026 revised assessment, J2026-119R (X0015), corrects a terrain-data error in its August 26, 2026 model. The reported one-hour nitrogen-dioxide statistic, including background, rises from 53.9 to 82.0 micrograms/m³, and the annual maximum from 4.9 to 6.9 micrograms/m³. The revised report compares these with objectives of 300 and 45 micrograms/m³, respectively. The one-hour figure is the required ninth-highest modelled hourly concentration, not the absolute hourly maximum.

Air-model assumptions and scope: The revised model includes the neighbouring Ember compressor station and ambient background, and assumes emissions controls on all four generators. Armada confirms selective catalytic reduction to reduce nitrogen oxides. In X0014, the applicant reports separate sensitive-receptor results of up to 60.6 micrograms/m³ for the one-hour statistic and 5.6 micrograms/m³ annually; these differ in scope from the revised report's domain-wide values. These are applicant and consultant predictions, not measured conditions or regulatory findings.

Environmental screening: WSP's August 28, 2026 desktop screening identifies cultivated land beside an existing oil-and-gas facility, no mapped wetlands in the footprint, and the nearest wetland approximately 320 metres away. The site adjoins a portion of the Kneehills Creek environmentally significant area ranked Low Significance. WSP proposes a preconstruction wildlife sweep and bird-season mitigation; its low-impact conclusion is a consultant assessment, not environmental approval.

Environmental approval remains separate: Armada's X0014 response says it submitted Environmental Protection and Enhancement Act Application 001-511952 on September 1, 2026. At the response date, it reported no review comments or approval and committed to obtaining approval before power-plant construction. A later decision has not been verified.

Neighbour concerns: The AUC's information request records objections from two neighbouring households that had not been withdrawn. Armada reports no new written concerns and describes follow-up with one household. No further questions does not establish that objections were withdrawn.

What remains unknown: The reviewed evidence does not establish site acreage, a separate computing-load figure, water requirements, construction or commissioning dates, or operating status. Nearby Ember infrastructure does not establish ownership of, or gas supply to, this project.

Armada Nowlit Wabasca / Hoole Data Centre

Evidence profile

Armada Nowlit Energy Ltd. · Municipal District of Opportunity No. 17 · Cryptocurrency mining

Armada Nowlit proposes nine co-located data-centre units supplied by a 19.8 MW behind-the-fence natural-gas power facility near Hoole. The municipal development permit has been issued, while the AUC power-plant application and required Crown-land disposition remain unresolved.

Read evidence profile
Quick factsHide quick facts
19.8 MW on-site natural-gas generation under AUC review
A 19.8 MW behind-the-fence natural-gas facility is under AUC review. The application proposes no Alberta Interconnected Electric System connection or power export.
Closed-loop cooling proposed
35.6 dBA vs 40 dBA limitFull-build nighttime model at 1,500 m
Current status
ProposedDevelopment Permit 26-DP-001 issued; AUC Proceeding 31058 and the required Crown-land disposition remain unresolved
Power arrangement

A 19.8 MW behind-the-fenceBehind the fence (BTF)AESO uses this process for changes to existing facilities connected to the transmission system that require updated facility data.The category does not by itself establish an off-grid design, new generation, or a data-centre development approval.Learn more → natural-gas facility is under AUC review. The application proposes no Alberta Interconnected Electric System connection or power export.

Capacity context
19.8 MW on-site natural-gas generation under AUC reviewApplication 31058-A001 proposes nine 2.2 MW engines in two phases. This is proposed generation capacity for co-located data infrastructure, not an approved plant or a measured data-centre load.
Cooling and water
Closed-loop coolingClosed-loop coolingCooling fluid circulates repeatedly through a contained loop instead of being routinely discharged after one pass.That describes the loop, not the whole site's water use. A separate heat-rejection system can still use water, and filling, maintenance, and leaks also matter.Learn more → proposedThe application says the cooling system would not withdraw or dischargeWithdrawal, consumption, and dischargeWithdrawal is water taken from a source. Consumption is the portion not returned to the same water system. Discharge is water released after use or treatment.These are different quantities. Check which one a water figure describes before comparing projects.Learn more → process water. Other site water needs and any separate Water Act approvals remain distinct.
Noise details
35.6 dBA vs 40 dBA limitThe full-build model predicts cumulative nighttime sound of 35.3 to 35.6 dBA at theoretical 1,500 m receptors, below the 40 dBA permissible level. These are not operating measurements at nearby communities. The October 16, 2026 update assumes hospital-grade mufflers or equivalent because actual muffler specifications were unavailable. Its conclusion still conflicts with its tables on possible low-frequency tonality: the tables show differences of about 21 to 22 dB and the body labels the tonal component possible.
Verified
2026-11-05
Location precision
Exact site →
Treaty geography
Treaty 8 territory; regional context only

Municipal permit: Development Permit 26-DP-001 has been issued by the Municipal District of Opportunity No. 17. The separate AUC power-plant application remains under review.

Site and footprint: The filing places the project at 16-36-080-25 W4M on Crown land within an existing oil-and-gas leasehold. The environmental evaluation uses a conservative 4.7-hectare footprint and says 92.6% is previously disturbed.

Data-centre configuration: The noise assessment models nine enclosed data centres, each with cooling fans and transformers, operating with the nine proposed engines.

Requested schedule: The application targets construction in the first quarter of 2027 and service in the third quarter of 2027. Appendix V of the October 16, 2026 noise update instead lists Phase 1 completion in the fourth quarter of 2026 and Phase 2 in June 2027. The applicant schedules conflict; neither establishes actual progress.

Draft environmental approval: The EPEA document filed as Appendix H is marked Draftv2. ADCW does not treat it as an issued Environmental Protection and Enhancement Act approval.

Air modelling: The applicant's model, using selective catalytic reduction on all nine engines, predicts nitrogen-dioxide concentrations below the applicable objectives. This is a modelled applicant result, not operating measurement data.

Other approvals: The application says Historical Resources Act clearance has been obtained. A Crown-land disposition remains required before construction, and the filed EPEA document is still a draft.

Closure security proposal: The filed estimate proposes financial assurance based on approximately CA$2.05 million for decommissioning and reclamation. Its amount, form, timing, and beneficiaries remain subject to final approval requirements.

Earlier filing deficiencies: In closing Application 30253-A001, the AUC identified inaccurate Crown-land information, incorrect distances to nearby First Nations communities, and an incomplete record on whether appropriate consultation had occurred. Both earlier closures allowed a future application and were not a permanent ban.

Gas-asset purchase and record: A court order approved Armada's asset purchase from Sequoia Resources, and the trustee certificate says the sale closed on April 1, 2025. Alberta's air-data portal separately lists Hoole South Sour Gas Plant, approval 10135, under Armada. These records establish an asset connection, not permission to build the data centre.

Larger ambitions: The 2025 council presentation described a 200 MW data-centre goal and a 1 GW power-generation goal. These remain expansion ambitions, not confirmed Hoole capacity, and are excluded from current totals.

Bantry Data Site

Verified listing

AVAX One Technology Ltd. · Bantry region · AI / High-performance computing

AVAX One proposed acquiring this Bantry-area site for modular AI and HPC development in July 2026. Its November 12, 2026 release says it will stop pursuing announced modular data-centre initiatives, without naming Bantry or resolving the acquisition and site outcome.

View project detailsHide project details
Bantry area, southern Alberta
Not disclosed
Not disclosed
Not disclosed
Not disclosedNo project-specific values found
Current status
ProposedAVAX One announced a non-binding acquisition letter of intent on July 1, 2026, targeting August 1, 2026 closing. On November 12, 2026, AVAX One said it would no longer pursue its announced modular data-centre initiatives. The release does not name Bantry, confirm acquisition closing, or establish the site's disposition
Power arrangement

Not disclosed

Capacity context
Not disclosedNo additional capacity context published.
Cooling and water
Not disclosedProject-specific cooling technology and routine water use have not been publicly disclosed.
Noise details
Not disclosedProject-specific noise details were not found in the public sources reviewed.
Verified
2026-11-15
Location precision
Region only
Treaty geography
Not yet verified

Announcement history and limits: The July 1, 2026 non-binding letter of intent targeted August 1, 2026 closing. AVAX One's November 12, 2026 results release announces withdrawal from its previously announced modular data-centre initiatives, including the BlueFlare proposal. Bantry is not named in that release. ADCW has not confirmed Bantry closing, cancellation, ownership transfer, or current development; the retained Proposed label is not evidence of an active AVAX commitment.

Beacon Chestermere AI Data Center Hub

Evidence profile

Beacon Data Centers · City of Chestermere · AI / High-performance computing

Beacon's proposed phased 400 MW data centre campus on approximately 310 acres in southern Chestermere. The site has land-use and conditional subdivision approvals, but the City says no data-centre development-permit application has been submitted or approved for construction.

Read evidence profile
Quick factsHide quick facts
Approximately 400 MW proposed at full build
Grid supply through a transmission extension and dedicated substation is proposed. Backup generation details are not confirmed.
Not disclosed
No project value publishedPermit-stage controls
Current status
ProposedLand-use approval and conditional subdivision approval are in place. As checked November 3, 2026, the City says no data-centre development-permit application has been submitted and no development permit has been approved for construction
Power arrangement

Grid supply through a transmission extension and dedicated substation is proposed. Backup generationBackup generationBackup generators provide electricity when the normal supply is unavailable. They may also run for testing or maintenance.Installed capacity does not establish continuous operation, annual fuel use, or emissions. Operating hours and permit conditions are separate evidence.Learn more → details are not confirmed.

Capacity context
Approximately 400 MW proposed at full buildBeacon described phased development to approximately 400 MW. This is a proponent plan, not an approved connection or operating load.
Cooling and water
Not disclosedNo project-specific cooling design, daily or annual water demand, supply source, wastewater volume, or operating water record has been published. A future development agreement must address municipal servicing.
Noise details
No project value publishedBylaw 014-25 requires appropriate controls for heat, noise, and emissions. The Development Authority may require a professional noise-attenuation study, mitigation plan, and monitoring system. No completed project-specific assessment or predicted receptor level was identified.
Verified
2026-11-03
Location precision
Exact site →
Treaty geography
Treaty 7 territory

Land-use approval: Bylaw 014-25 redesignated approximately 310 acres and added Data Centre Campus as a permitted use in the Business Park / Light Industrial district.

Approval boundary: The bylaw is land-use approval. It is not a development permit, servicing agreement, building permit, grid approval, or construction approval.

Municipal agreement: A comprehensive development agreement for municipal services and other matters is required as a condition of any development permit.

Federal principles: Beacon Data Centers is listed as a signatory to Canada's five responsible data-centre development principles. This is a company commitment, not a project approval or permit condition. What the five principles mean →

Beacon Foothills AI Data Center Hub

Evidence profile

Beacon Data Centers · Foothills County · AI / High-performance computing

A proposed 400 MW data centre campus on 279.5 acres east of High River. Foothills County approved the planning framework in February 2025, but a project-specific development permit and utility approvals remain outstanding.

Read evidence profile
Quick factsHide quick facts
400 MW proposed data centre campus
400 MW on-site generation proposed
Not disclosed
Study requiredDevelopment-permit stage
Current status
ProposedMunicipal planning bylaws are approved, but the campus remains a discretionary use and a project-specific development permit has not been verified
Power arrangement

400 MW on-site generation proposed; separate 400 MW grid requestGrid connection requestA request for new or changed electricity delivery capacity through the Alberta Electric System Operator (AESO).Requested capacity is not measured electricity use, a guaranteed connection, or approval to build a data centre.Learn more →. Final supply design unresolved.

Capacity context
400 MW proposed data centre campusThe municipal planning record describes a 400 MW campus. This is a planning-stage capacity, not approved or operating demand.
Cooling and water
Not disclosedNo project-specific cooling design or routine water volume was found. The area plan discusses future County piped servicing and interim on-site options, not an approved campus water supply.
Noise details
Study requiredFoothills County requires a later development-permit application to include noise mitigation and monitoring where AUC Rule 012 does not apply. No project-specific noise model was found.
Verified
2026-11-03
Location precision
Approximate area →
Treaty geography
Treaty 7 territory

Environmental review: Site and habitat assessments were submitted. The amended plan records wetlands and mapped wildlife survey areas; further assessment and mitigation remain part of later approvals.

Planning decision: Foothills County passed Bylaws 05/2025, 06/2025, and 07/2025 on February 26, 2025, amending the area plan and land-use rules and redesignating the subject lands.

Development permit: The data centre campus remains a discretionary use. A complete application must address noise mitigation and monitoring, fire prevention, and emergency response.

Published building concepts differ: The municipal application and provincial registry describe the building program differently. ADCW does not publish a definitive building count pending a current project-specific design filing.

Federal principles: Beacon Data Centers is listed as a signatory to Canada's five responsible data-centre development principles. This is a company commitment, not a project approval or permit condition. What the five principles mean →

Beacon Harry Smith AI Data Center Hub

Verified listing

Beacon Data Centers · Parkland County · AI / High-performance computing

One of six Alberta sites in Beacon's announced 4.5 GW portfolio, this early-stage AI campus is proposed in Parkland County, west of Edmonton; AESO currently lists a 400 MW data-load connection request under the project name.

View project detailsHide project details
400 MW AESO connection request
AESO’s November 2026 list, checked November 15, 2026, records P2927 as a Stage 2 request for a 400 MW grid connection, with the in-service date under review. This is not an approved or completed connection.
Not disclosed
Not disclosedNo project-specific values found
Current status
ProposedThe provincial project registry identifies the proposal; AESO lists a 400 MW data-load connection request, while current municipal approvals remain unclear
Power arrangement

AESO’s November 2026 list, checked November 15, 2026, records P2927 as a Stage 2 request for a 400 MW grid connection, with the in-service date under review. This is not an approved or completed connection.

Capacity context
400 MW AESO connection requestAESO lists P2927 Beacon Harry Smith A.I. Hub Load with a 400 MW DTS request. This is a grid-connection requestGrid connection requestA request for new or changed electricity delivery capacity through the Alberta Electric System Operator (AESO).Requested capacity is not measured electricity use, a guaranteed connection, or approval to build a data centre.Learn more →, not an approved or operating data centre load.
Cooling and water
Not disclosedProject-specific cooling technology and routine water use have not been publicly disclosed.
Noise details
Not disclosedProject-specific noise details were not found in the public sources reviewed.
Verified
2026-09-04
Treaty geography
Treaty 6 territory

Federal principles: Beacon Data Centers is listed as a signatory to Canada's five responsible data-centre development principles. This is a company commitment, not a project approval or permit condition. What the five principles mean →

Beacon Heartland AI Data Center Hub

Evidence profile

Beacon Data Centers / Heartland Power Generation LP · Sturgeon County · AI / High-performance computing

A proposed 800 MW AI and high-performance-computing campus east of Gibbons, paired with a 920 MW natural-gas power plant approved by the AUC with conditions on October 23, 2026.

Read evidence profile
Quick factsHide quick facts
800 MW proposed data centre load
920 MW on-site natural-gas plant approved by the AUC with conditions on October 23, 2026
Air-cooled power generation; data-centre cooling design not final
45.8 day / 38.4 night dBAModelled cumulative at L1, 1.5 km boundary
Current status
ProposedAUC approved the 920 MW power plant with conditions on October 23, 2026; this does not approve the data centre or establish construction
Power arrangement

920 MW on-site natural-gas plant approved by the AUC with conditions on October 23, 2026; future grid connection requires separate applications.

Capacity context
800 MW proposed data centre loadFour proposed 200 MW data halls at full build, not operating demand.
Cooling and water
Air-cooled power generation; data-centre cooling design not finalThe older full-campus estimate is up to 1,500 m³/day (1.5 million L/day). The AUC decision separately estimates 0–1 m³/day for the power plant, replacing its older approximately 100 m³/day allowance. A revised campus total and measured use are not established.
Noise details
45.8 day / 38.4 night dBAThe October 23, 2026 decision reports no dwellings within 1.5 km of the project boundary. At unoccupied L1 on that criteria boundary, cumulative sound is modelledModelled versus measuredA modelled result is a prediction based on inputs and assumptions. A measured result comes from observations or instruments under particular conditions.A prediction is not verified operating performance. Check the location, period, operating scenario, and what the reported number actually represents.Learn more → at 45.8 dBA by day and 38.4 dBA at night, below 50/40 dBA limits. Final design, mitigation, and post-construction verification are required. These are predictions, not measurements; older R1 figures use a different receptor context.
Verified
2026-10-26
Location precision
Exact site →
Treaty geography
Treaty 6 territory

Federal principles: Beacon Data Centers is listed as a signatory to Canada's five responsible data-centre development principles. This is a company commitment, not a project approval or permit condition. What the five principles mean →

Beacon Indus Data Center Hub

Evidence profile

Beacon Data Centers / Indus Power Generation LP · Rocky View County · AI / High-performance computing

Beacon proposes four 300 MW AI and high-performance computing data halls (1,200 MW total) northwest of Indus. On November 17, 2026, the AUC approved the previously proposed 1,494 MW on-site gas plant with conditions.

Read evidence profile
Quick factsHide quick facts
1.2 GW proposed data centre load
1,494 MW on-site natural-gas plant approved by the AUC with conditions on November 17, 2026.
Air-cooled and closed-loop systems proposed
Final assessment requiredCombined power plant and data centre sound
Current status
ProposedThe AUC approved the 1,494 MW natural-gas plant with conditions on November 17, 2026. The data centre remains proposed and Rocky View County development permits are still required.
Power arrangement

1,494 MW on-site natural-gas plant approved by the AUC with conditions on November 17, 2026.

Capacity context
1.2 GW proposed data centre loadFour proposed 300 MW data halls at full build.
Cooling and water
Air-cooled and closed-loopClosed-loop coolingCooling fluid circulates repeatedly through a contained loop instead of being routinely discharged after one pass.That describes the loop, not the whole site's water use. A separate heat-rejection system can still use water, and filling, maintenance, and leaks also matter.Learn more → systems proposedNo cooling towers or evaporative cooling are proposed; total campus demand is projected at about 1,500 m³/day (1.5 million L/day).
Noise details
Final assessment requiredThe AUC requires a final assessment of combined sound from the power plant and data centre. The earlier federal summary describes modelledModelled versus measuredA modelled result is a prediction based on inputs and assumptions. A measured result comes from observations or instruments under particular conditions.A prediction is not verified operating performance. Check the location, period, operating scenario, and what the reported number actually represents.Learn more → sound, but ADCW did not find its numerical receptor table.
Verified
2026-11-17
Location precision
Exact site →
Treaty geography
Treaty 7 territory

Federal principles: Beacon Data Centers is listed as a signatory to Canada's five responsible data-centre development principles. This is a company commitment, not a project approval or permit condition. What the five principles mean →

Beacon Saunders Lake AI Data Center Hub

Evidence profile

Beacon Data Centers · Leduc County · AI / High-performance computing

Land-use changes are approved for Beacon's 160-acre proposal near Saunders Lake. A development permit has not been verified, and the 400 MW grid request does not authorize construction.

Read evidence profile
Quick factsHide quick facts
400 MW AESO connection request
400 MW grid connection requested
Not disclosed
Not disclosedNo project-specific values found
Current status
ProposedProposed: land redesignation approved; no development permit verified in the September 11, 2026 review
Power arrangement

400 MW grid connection requested; supply and service date unconfirmed.

Capacity context
400 MW AESO connection requestSeptember 2026: P2935 remains at Stage 2 with its in-service date under review. This is requested grid capacity, not approved or operating demand.
Cooling and water
Not disclosedCooling design, water source, and daily or annual water demand remain unconfirmed.
Noise details
Not disclosedNo project-specific sound model or levels at nearby communities were found. Leduc County identifies noise as a permit-review consideration.
Verified
2026-09-11
Location precision
Approximate area →
Treaty geography
Treaty 6 territory

Planning decision: Council unanimously passed Bylaw 18-24 on December 10, 2024, changing 160 acres from Agricultural to Light Industrial.

Permit status: Leduc County's June 26, 2026 update said no data-centre development permits had been approved. No later project-specific approval was located.

Federal principles: Beacon Data Centers is listed as a signatory to Canada's five responsible data-centre development principles. This is a company commitment, not a project approval or permit condition. What the five principles mean →

Boreal Technology Hub

Evidence profile

Operator not confirmed; BGRE leads development · Parkland County · Data centre / Workload undisclosed

A proposed data centre at TransAlta's Keephills power-station site. An initial 230 MW stage has a grid-load contract. The project team now proposes up to 1.6 GW at full build-out, compared with the earlier 1 GW disclosure; expansion is not approved or committed. BGRE is leading development on behalf of Brookfield and CPP Investments; the County has not received a development-stage application. Preliminary cooling-water estimates are now published; campus-wide water needs and sound predictions remain unconfirmed.

Read evidence profile
Quick factsHide quick facts
230 MW initial grid-load contract
TransAlta would provide the site and electricity. Boreal describes increased use of existing gas generation followed by new gas generation
Proposed closed-loop cooling
Study not foundNo project-specific values found
Current status
ProposedLand-use changes approved; Parkland County has not received development-stage applications, and final business agreements remain unconfirmed
Power arrangement

TransAlta would provide the site and electricity. Boreal describes increased use of existing gas generation followed by new gas generation; the final supply mix and allocation to the campus remain unconfirmed.

Capacity context
230 MW initial grid-load contractAESO, Alberta's grid operator, has allocated 230 MW to P3083 under a signed load contract. Connection work remains; this does not mean the data centre is built or using power.
Cooling and water
Proposed closed-loop coolingClosed-loop coolingCooling fluid circulates repeatedly through a contained loop instead of being routinely discharged after one pass.That describes the loop, not the whole site's water use. A separate heat-rejection system can still use water, and filling, maintenance, and leaks also matter.Learn more →Boreal estimates 7,952 m³ for the initial fill of a 300 MW facility and approximately 700 m³/year of make-up water. These preliminary cooling figures are not a campus-wide water total or verified allocation.
Noise details
Study not foundBoreal’s October 7, 2026 boards say its noise assessment is still to be undertaken, with results planned for the next open house. The separate Keephills Unit 1 assessment does not establish data-centre sound levels.
Verified
2026-10-29
Location precision
Approximate area →
Treaty geography
Treaty 6 territory

Project name and developer: Parkland County now calls the former TransAlta Data Centre Application the Boreal Technology Hub. BGRE leads development on behalf of Brookfield and CPP Investments; an eventual data-centre operator has not been named.

Proposed site: The project team places Phase 1 on part of Section 25-51-4-W5M, south of the Keephills generating station. Sections 24 and 13 are possible later phases, not an approved layout.

Permission to build: The County's page, updated October 29, 2026, says it has not received development-stage applications. Land-use approval is not a development permit.

Timing: The August grid list shows two 115 MW stages for P3083, dated January 1, 2027, and March 27, 2028. These are connection-planning dates, not confirmed opening dates. Dates for the other two requests are under review.

Existing power plant: TransAlta lists 861 MW of existing gas-fired generation at Keephills. That is not new generation for this proposal, and the reviewed sources do not commit all of it to the data centre.

Captus Generation Pincher Creek Data Centre Proposal

Verified listing

Captus Generation (owned by Summit Point Capital L.P.) · Municipal District of Pincher Creek No. 9 · Data centre; workload unconfirmed

Captus proposes a natural-gas power plant and a co-located data centre on an 825-acre property around the existing Drywood Generating Plant, about 20 km south of Pincher Creek. Captus would build the plant. A technology partner would develop the data centre, whose size remains open.

View project detailsHide project details
74.9 MW requested grid load (AESO P3079)
Captus plans to power the data centre with on-site natural-gas generation and use the grid for backup, according to August 2026 reporting. The company described a possible first phase of about 400 MW of generation. AESO currently lists the nearby P3079 grid request at 74.9 MW, up from 50 MW in April 2026.
Cooling design unconfirmed
Not disclosedNo project-specific values found
Current status
ProposedCaptus briefed municipal council in February 2026 and reported ongoing partner talks in July. A project-specific development permit and a data centre partner remain unconfirmed.
Power arrangement

Captus plans to power the data centre with on-site natural-gas generation and use the grid for backup, according to August 2026 reporting. The company described a possible first phase of about 400 MW of generation. AESO currently lists the nearby P3079 grid requestGrid connection requestA request for new or changed electricity delivery capacity through the Alberta Electric System Operator (AESO).Requested capacity is not measured electricity use, a guaranteed connection, or approval to build a data centre.Learn more → at 74.9 MW, up from 50 MW in April 2026.

Capacity context
74.9 MW requested grid load (AESO P3079)The November 2026 list shows Captus Load active at Stage 3 (Regulatory Preparation), with September 1, 2027 as the target in-service date. AESO's map guide places the request near Drywood. Glenwood is AESO's planning area. Public records reviewed give no confirmed data centre load or parcel-level link to P3079.
Cooling and water
Cooling design unconfirmedCaptus says it plans to treat saline, non-potable water for industrial use. Project-specific withdrawalWithdrawal, consumption, and dischargeWithdrawal is water taken from a source. Consumption is the portion not returned to the same water system. Discharge is water released after use or treatment.These are different quantities. Check which one a water figure describes before comparing projects.Learn more → volumes and water authorizations remain unverified.
Noise details
Not disclosedProject-specific noise details were not found in the public sources reviewed.
Verified
2026-11-22
Treaty geography
Treaty 7 territory

Grid-load request history: AESO listed P3079 at 100 MW in March 2025 and at 50 MW by November 2025. It rose to 74.9 MW in May 2026. AESO listed the request at Stage 3 by October 2026. The formal link to the Captus site remains unverified.

Earlier grid-generation proposal: AESO's December 2025 Cluster 2 study maps the earlier 440 MW Captus cogeneration proposal (P3004). Captus told council in February 2026 that it had suspended plans to supply the provincial grid and was pursuing on-site generation for a data centre. P3004 does not appear in the November 2026 list.

Ownership history: Captus terminated its proposed sale to Gryphon Digital Mining in August 2025, before the transaction closed. Captus announced a separate completed acquisition by Summit Point Capital in October 2025.

Municipal process: The MD adopted Bylaw 1361-25 in September 2025, adding rules for data centre applications. The August 2026 report quoted the MD's development officer as saying the municipality had no application before it.

Crusoe Alsike Energy Park Data Centre

Verified listing

Crusoe / KALiNA Distributed Power · Brazeau County · AI / High-performance computing

A proposed AI data centre on a 160-acre energy-park site near Warburg in Brazeau County. The February 12, 2025 Crusoe framework paired it with a 170 MW gas plant. KALiNA's October 2025 presentation already used a 200 MW initial plant design; its October 30, 2026 report retains approximately 200 MW and lists a separate 178 MW generation connection request. These are different measures, not verified data centre demand. Gas supply is constrained, and construction and site-specific data centre approvals remain unconfirmed.

View project detailsHide project details
Approx. 200 MW design; originally 170 MW
Natural-gas generation: 170 MW in the February 2025 Crusoe framework
Not disclosed
Not disclosedNo project-specific values found
Current status
ProposedProposed data centre under the 2025 framework. The original data-load and generation requests were cancelled; AESO's November 2026 list includes a separate 178 MW Alsike Gas request. Site-specific data centre approvals and a final power contract remain unconfirmed.
Power arrangement

Natural-gas generation: 170 MW in the February 2025 Crusoe framework; 200 MW initial design in October 2025; approximately 200 MW design and 178 MW grid requestGrid connection requestA request for new or changed electricity delivery capacity through the Alberta Electric System Operator (AESO).Requested capacity is not measured electricity use, a guaranteed connection, or approval to build a data centre.Learn more → in October 2026. A final power-purchase agreement remains unconfirmed.

Capacity context
Approx. 200 MW design; originally 170 MWKALiNA's October 30, 2026 report describes an approximately 200 MW base plant design at each of its four larger sites, including Alsike. Its separate 178 MW AESO generation filing is a grid-connection request, not a data centre load or an approved plant rating. The report does not confirm a completed Crusoe power contract.
Cooling and water
Not disclosedProject-specific cooling technology and routine water use have not been publicly disclosed.
Noise details
Not disclosedProject-specific noise details were not found in the public sources reviewed.
Verified
2026-11-10
Treaty geography
Treaty 6 territory

Gas supply: KALiNA's October 30, 2026 report says regulated NGTL gas supply for Alsike remains constrained. The company is seeking alternative supplies from gas producers and processing plants. Gas availability and a completed supply contract are not established by proximity to a pipeline.

Development and customer contracts: KALiNA says its remaining early development work includes rezoning, gas-supply contracts, and electricity connections, with AUC power-plant applications to be prepared according to funding and project progress. The February 12, 2025 Crusoe framework anticipated a power-purchase agreement of at least 15 years; the October 30, 2026 report discusses future commercial contracting and does not confirm that such an agreement has been completed.

Carbon capture: The February 12, 2025 Crusoe framework described plants incorporating carbon capture and storage. Its October 2025 presentation already treated capture as optional or a later addition; the current portfolio webpage also calls it optional. A final site-specific capture design, commitment, and approval remain unconfirmed.

Land and current portfolio: The October 30, 2026 report lists 160 acres at Alsike under an option to purchase, not a completed land purchase. Its five-site portfolio comprises Alsike, Myers, Gilby, Clairmont, and Saddle Hills. Crossfield is absent; the report does not announce a replacement Crusoe campus.

AESO queue status: AESO's October 2026 list marked the original 280 MW data-load request, P3153, and 178 MW generation request, P2979, as recently cancelled. Its November 2026 list still marks P2979 cancelled and separately lists P3251, Alsike Gas, in Cluster 3 at Stage 1, with 178 MW of generation and 3 MW of load. The 3 MW entry is not evidence that the former 280 MW data centre request has resumed. The June 1, 2029 generation date is a planning target, not a confirmed opening.

Location evidence: KALiNA identifies Alsike with the Warburg area, and AESO assigns the related requests to Brazeau County. The provincial map point is approximate, so it should not be read as a confirmed parcel or street address.

Crusoe Myers Energy Park Data Centre

Verified listing

Crusoe / KALiNA Distributed Power · Lacombe County · AI / High-performance computing

A proposed AI data centre on a 65-acre energy-park site east of Lacombe in Lacombe County. The February 12, 2025 Crusoe framework paired it with a 170 MW gas plant. KALiNA's October 2025 presentation already used a 200 MW initial plant design; its October 30, 2026 report retains approximately 200 MW and lists a separate 178 MW generation connection request. These are different measures, not verified data centre demand. Gas supply is constrained, and construction and site-specific data centre approvals remain unconfirmed.

View project detailsHide project details
Approx. 200 MW design; originally 170 MW
Natural-gas generation: 170 MW in the February 2025 Crusoe framework
Not disclosed
Not disclosedNo project-specific values found
Current status
ProposedProposed data centre under the 2025 framework. The original data-load and generation requests were cancelled; AESO's November 2026 list includes a separate 178 MW Myers Gas request. Site-specific data centre approvals and a final power contract remain unconfirmed.
Power arrangement

Natural-gas generation: 170 MW in the February 2025 Crusoe framework; 200 MW initial design in October 2025; approximately 200 MW design and 178 MW grid requestGrid connection requestA request for new or changed electricity delivery capacity through the Alberta Electric System Operator (AESO).Requested capacity is not measured electricity use, a guaranteed connection, or approval to build a data centre.Learn more → in October 2026. A final power-purchase agreement remains unconfirmed.

Capacity context
Approx. 200 MW design; originally 170 MWKALiNA's October 30, 2026 report describes an approximately 200 MW base plant design at each of its four larger sites, including Myers. Its separate 178 MW AESO generation filing is a grid-connection request, not a data centre load or an approved plant rating. The report does not confirm a completed Crusoe power contract.
Cooling and water
Not disclosedProject-specific cooling technology and routine water use have not been publicly disclosed.
Noise details
Not disclosedProject-specific noise details were not found in the public sources reviewed.
Verified
2026-11-10
Treaty geography
Treaty 6 territory

Gas supply: KALiNA's October 30, 2026 report says regulated NGTL gas supply for Myers remains constrained. The company is seeking alternative supplies from gas producers and processing plants. Gas availability and a completed supply contract are not established by proximity to a pipeline.

Development and customer contracts: KALiNA says its remaining early development work includes rezoning, gas-supply contracts, and electricity connections, with AUC power-plant applications to be prepared according to funding and project progress. The February 12, 2025 Crusoe framework anticipated a power-purchase agreement of at least 15 years; the October 30, 2026 report discusses future commercial contracting and does not confirm that such an agreement has been completed.

Carbon capture: The February 12, 2025 Crusoe framework described plants incorporating carbon capture and storage. Its October 2025 presentation already treated capture as optional or a later addition; the current portfolio webpage also calls it optional. A final site-specific capture design, commitment, and approval remain unconfirmed.

Land and current portfolio: The October 30, 2026 report lists 65 acres at Myers under an option to purchase, not a completed land purchase. Its five-site portfolio comprises Alsike, Myers, Gilby, Clairmont, and Saddle Hills. Crossfield is absent; the report does not announce a replacement Crusoe campus.

AESO queue status: AESO's October 2026 list marked the original 280 MW data-load request, P3155, and 178 MW generation request, P2981, as recently cancelled. Its November 2026 list still marks P2981 cancelled and separately lists P3250, Myers Gas, in Cluster 3 at Stage 1, with 178 MW of generation and 3 MW of load. The 3 MW entry is not evidence that the former 280 MW data centre request has resumed. The June 1, 2029 generation date is a planning target, not a confirmed opening.

Location evidence: ADCW correction, November 10, 2026: the earlier marker south of Red Deer came from Alberta Major Projects' approximate map and conflicted with KALiNA's Lacombe description. AESO's November 2026 geographic data maps both the original Myers generation request, P2981, and newer Myers Gas request, P3250, east of Lacombe in Lacombe County. ADCW now uses the P3250 point, approximately 52.47273 N, 113.63388 W. AESO's 35-Red Deer label is an electricity planning area, not a municipality. The marker shows an approximate project area, not a confirmed parcel or building location; AESO cautions that early-stage locations may change.

Data District Bonnyville Region Facility

Verified listing

Data District Inc. / Technologies New Energy · Bonnyville region · AI / High-performance computing

The Government of Alberta lists the Bonnyville region as the expected second site in a four-project Data District and Technologies New Energy program. The provincial record gives a combined 240 MW capacity and CA$1.26 billion budget for all four sites, but no Bonnyville-specific capacity, parcel, permit, or municipal application.

View project detailsHide project details
Bonnyville region
Not disclosed
Not publicly confirmed for the Bonnyville site.
Not disclosed
Not disclosedNo project-specific values found
Current status
ProposedNamed as the expected second site in a four-project Alberta program; site, capacity, land control, permits, and municipal applications have not been publicly identified
Power arrangement

Not publicly confirmed for the Bonnyville site.

Capacity context
Not disclosedNo additional capacity context published.
Cooling and water
Not disclosedProject-specific cooling technology and routine water use have not been publicly disclosed.
Noise details
Not disclosedProject-specific noise details were not found in the public sources reviewed.
Verified
2026-09-13
Location precision
Region only; municipality and site not confirmed beyond the provincial listing
Treaty geography
Treaty 6 territory

Province-wide program: Alberta Major Projects identifies four Phase 1 regions: Olds, Bonnyville, Calgary, and Edmonton, with about 240 MW and CA$1.26 billion combined. It does not assign a capacity or investment amount to Bonnyville.

Schedule claim: The provincial listing says construction on the Bonnyville facility is expected in 2027. This is a projected schedule, not evidence of an approved site or construction start.

Calgary and Edmonton: The same program also names Calgary and Edmonton regions. ADCW is retaining those as research leads until a site-level identity, capacity, land record, permit, or municipal application is found.

Data District Olds Facility

Verified listing

Data District Inc. / Technologies New Energy · Town of Olds · AI / High-performance computing

Data District has purchased land in Olds and is working with Invest Olds on early planning and site readiness for a proposed 55 MW facility. No formal development or regulatory application has been submitted.

View project detailsHide project details
55 MW announced Olds facility
Alberta grid · FortisAlberta
Not disclosed
Not disclosedNo project-specific values found
Current status
ProposedLand purchased; early planning and site-readiness work underway with Invest Olds; no formal development or regulatory application submitted
Power arrangement

Planned 55 MW power expansion being advanced with FortisAlberta; the generation source and final delivery arrangement are not public.

Capacity context
55 MW announced Olds facilityA company-announced target, not an approved or operating load.
Cooling and water
Not disclosedProject-specific cooling technology and routine water use have not been publicly disclosed.
Noise details
Not disclosedProject-specific noise details were not found in the public sources reviewed.
Verified
2026-09-13
Treaty geography
Treaty 7 territory

Municipal status: Data District Inc. has purchased land in Olds and is working with Invest Olds on early planning and site readiness. As of August 28, 2026, the Town reports that no formal development or regulatory application has been submitted.

Phase 1 program: Alberta Major Projects describes Olds as the first of four Phase 1 regional projects, followed by Bonnyville, Calgary, and Edmonton, with about 240 MW and CA$1.26 billion combined. The 55 MW figure in this record applies to Olds; ADCW does not divide the remaining program capacity among the other regions without site-level evidence.

Edmonton Energy & Technology Park AI Data Centre

Verified listing

Not publicly confirmed · City of Edmonton · AI data centre (planning application)

Stantec, for Walton Global Investments, seeks to allow data centres and associated power generation in the Medium Industrial Precinct and move 253 hectares, about 625 acres, into it. The City says the applicant has proposed no replacement policies or guidelines for the eco-industrial provisions it seeks to remove from those uses. The planning changes remain under review.

View project detailsHide project details
Not disclosed
Not publicly confirmed
Not disclosed
Not disclosedNo project-specific values found
Current status
ProposedPlanning amendment LDA26-0225 remains under review. The City lists October 25, 2026 as the engagement deadline; a Council hearing date is not yet listed. This is not approval to build.
Power arrangement

Not publicly confirmed

Capacity context
Not disclosedNo additional capacity context published.
Cooling and water
Not disclosedThe City's engagement page does not identify a cooling system, water source, or water-demand figure.
Noise details
Not disclosedThe City's engagement page does not provide a project-specific sound assessment or predicted levels at nearby communities.
Verified
2026-10-25
Location precision
Approximate area →
Treaty geography
Treaty 6 territory

Application parties: The City identifies Stantec Consulting Ltd. as the applicant acting on behalf of Walton Global Investments Ltd. Walton's role in this application does not establish it as the future data-centre operator.

Planning area: The application would move 253 hectares, about 625 acres, from the Petrochemical Precinct to the Medium Industrial Precinct. Stantec describes the area statistics as preliminary, subject to further studies. This is a proposed planning designation change, not a confirmed building footprint.

Proposed policy changes: The application would allow data centres and associated power generation in the Medium Industrial Precinct. It would limit the area structure plan's eco-industrial policies, intended to reduce environmental effects and improve resource efficiency, to the Petrochemical Precinct. These changes have not been adopted.

Proposed design-guideline exemption: Stantec's September 17, 2026 amendment report would exempt data centres and associated uses, including power generation, from the plan's Section 10 design guidelines. It points instead to the applicable zoning regulations. The report would encourage eco-industrial principles elsewhere in the park while limiting their policy application to the Petrochemical Precinct.

No replacement policies proposed: The City's project team says the applicant has proposed no replacement policies or guidelines for the eco-industrial provisions. Administration is reviewing the effects of removing those policies and design guidelines. The City says they are implemented through Section 3.50 of the Zoning Bylaw; if those regulations were removed through a future zoning amendment, the general zoning regulations would still apply. The current proposal does not remove all development requirements.

Current land-use rules: The City says large-scale data centres remain Major Industrial uses; this application does not propose changing that classification. They are not currently allowed in the Medium Industrial Precinct or its associated Medium Industrial Zone, known as EETIM. Data centres and power generation are already permitted uses in the separate Petrochemical Precinct and its associated zone. Those rules do not approve this proposal.

Risk buffers and river valley: Administration is still evaluating how the proposal would affect the risk buffer around industrial development. The City says no change is proposed to the North Saskatchewan River Valley Area Redevelopment Plan. That does not resolve the buffer review or establish approval of a particular building location.

Public participation: The City lists September 28, 2026 through October 25, 2026 for this round of online engagement, through its engagement page or the file planner listed there. Feedback is to be summarized in a What We Heard report for Council. As of October 25, 2026, the page does not list a Council public hearing date. That later hearing is a separate opportunity to participate; check the City's page and Council calendar for updates.

Further approvals: This is a change to broad planning policy, not an application to build a specific facility. If approved, a separate EETIM zoning-text amendment and any necessary rezoning would still require technical review, further public input, and Council consideration at a public hearing. Development permits and applicable utility and provincial approvals would follow. No construction or operating permission is established here.

What remains unknown: The reviewed City page does not establish the future operator or tenants, data-centre power demand, generation capacity or fuel, grid connection, cooling technology, water demand, building count or footprint, or construction and operating dates. No project-specific Alberta Utilities Commission or Alberta Electric System Operator identifier is established by that page.

Location evidence: The City lists 20411, 21103, 21104, and 21150 34 Street NW, plus 21103 and 21603 50 Street NW. The approximate marker represents 21150 34 Street NW, one of the listed application addresses. It represents the planning area, not a confirmed building location or the boundary of all six application parcels.

FingerMotion Brooks Campus Zone

Evidence profile

FingerMotion and Genius Group, with BlueFlare Energy Solutions Inc. as the proposed builder and operator · County of Newell · AI / High-performance computing

A proposed data centre near Tilley would use 9.9 MW of on-site natural-gas generation. It is the first planned site in a program of about ten data-centre campuses, with an announced total of up to 100 MW.

Read evidence profile
Quick factsHide quick facts
9.9 MW proposed on-site generation
The site would generate its own electricity using 9.9 MW of natural-gas generators. The purchase excludes the old generators and requires their removal before the deal is completed. Approval for replacement generators has not been confirmed.
Proposed liquid cooling
Not disclosedNo project-specific values found
Current status
ProposedProposed: the partners have signed agreements to work together, but the site purchase and approvals for new generators are not confirmed
Power arrangement

The site would generate its own electricity using 9.9 MW of natural-gas generators. The purchase excludes the old generators and requires their removal before the deal is completed. Approval for replacement generators has not been confirmed.

Capacity context
9.9 MW proposed on-site generationThe company proposes this amount of generating capacity for the redeveloped site. It is not operating output, and the existing site registrations do not show that the replacement generators have been approved.
Cooling and water
Proposed liquid coolingLiquid coolingLiquid carries heat away from computing equipment, for example through cold plates at the chips.This describes how heat leaves the equipment. It does not identify how heat is ultimately released outside, or establish the site's water demand.Learn more →The November 4, 2026 announcement proposes liquid cooling for customers’ computing equipment. It does not establish where water would come from, how much would be used, or whether the cooling system has been built.
Noise details
Not disclosedProject-specific noise details were not found in the public sources reviewed.
Verified
2026-11-08
Location precision
Approximate area →
Treaty geography
Treaty 7 territory

The plan for ten sites: On November 5, 2026, FingerMotion, Genius Group, and BlueFlare announced signed, binding agreements for a program of ten data-centre campuses, each about 9.9 MW, with a stated total of up to 100 MW. They also signed an agreement for the first site, Brooks Campus #1. Each site would sit in its own company, owned 75% by FingerMotion and 25% by Genius Group. In its September 15, 2026 plan, FingerMotion had described itself as the sole owner of the site companies. The new agreements do not confirm that the first site has been bought or transferred into the new arrangement.

Who would build it: The November 5, 2026 announcement says BlueFlare Energy Solutions would develop, build, and run the site. FingerMotion and BlueFlare would arrange power, funding, and customers, while Genius Group would lead community and training programs. Before the first-site deal can be completed, the partners need a signed customer contract backed by financial security, committed funding, the required BlueFlare agreements, satisfactory checks of the deal and site, and regulatory approvals. The company aims to make land with power available in the first quarter of 2027. That is a target, not a confirmed date for customers to start using the data centre.

Loans and community commitments: The partners expect loans to cover 60% to 80% of each campus project. Repayment would be tied to that campus rather than general corporate backing, but the funding has not been confirmed. They also say they will use their best commercial efforts to reserve 10% of each campus’s capacity for their GENIUSpark Alberta computing venture and put 10% of net profit into a locally governed community fund. This wording commits them to trying to deliver those benefits; it does not guarantee the capacity or payments.

A possible first customer: On November 4, 2026, FingerMotion said an unnamed customer was interested in renting space and power for computing equipment needing up to 7 MW, with liquid cooling. This measures power for the computing equipment, not the generators’ output. Cascadia Industries Ltd., trading as Cascadia Power, is representing that customer; Cascadia is not the proposed tenant. The expression of interest does not commit the customer to a purchase, and no final customer contract has been signed. The announcement does not say where water would come from or how much would be used.

A separate company merger: On October 29, 2026, FingerMotion announced a preliminary, non-binding plan to combine with BlueFlare Group Holdings. BlueFlare shareholders and certain management and advisory parties would own about 80% of the combined company, proposed to be called BlueFlare Inc. and trade under BFLR. The companies still need a final agreement, funding, shareholder approval, and regulatory and market approvals. This 80% figure concerns ownership of the combined business, not a direct stake in the Brooks site.

Buying the site rights: FingerMotion announced on September 29, 2026 that it had agreed to buy 100% of Newbit Technology Inc. for US$2.3 million. The agreement was signed September 23, 2026 and set October 29, 2026 as its deadline for completing the deal. Buying Newbit would give FingerMotion the company and its site rights, not outright ownership of the leased land. The November 5, 2026 announcement still lists conditions to be met. ADCW has not confirmed that the purchase was completed.

Reported permits and land lease: FingerMotion says Newbit holds an Eastern Irrigation District lease allowing use of the land, Development Permit 2022055, building and electrical permits, an environmental approval, and a registration under Alberta Utilities Commission (AUC) Rule 007. ADCW has not reviewed the permits themselves, so their exact conditions and coverage remain unresolved.

What is already at the site: The announced purchase includes gas pipes and metering equipment, a Canadian Natural Resources Limited road-use agreement, and existing site improvements. These are assets already associated with the site. Their presence does not show that the proposed data-centre buildings or replacement generators have been built.

Securing a gas supply: The earlier gas contract ended after the site stopped taking gas. Completing the purchase requires a new supply agreement with Pivotal Energy Partners, consent from Pivotal and the Eastern Irrigation District, and satisfactory completion of the remaining checks of the deal and site.

Approval for new generators: FingerMotion says it would be responsible for obtaining any required AUC approval for different generators after completing the purchase. Buying the company and its existing rights would not, by itself, mean that the new generators can operate or that a paying computing customer has signed up.

How the 100 MW and 99 MW plans relate: On September 15, 2026, FingerMotion described ten 9.9 MW sites across Brooks, Coronation, Fox Creek, and Vulcan. Together, they would have 99 MW of generating capacity and about 72 MW available continuously for computing equipment. The company did not say how the ten sites would be divided among those locations. Its November 4, 2026 announcement still placed Brooks in that program. The November 5, 2026 announcement calls the newer plan the Brooks Corridor and describes up to 100 MW. It is not clear which sites the two plans share, so ADCW does not add their capacity figures together.

Company timelines: The September 15, 2026 plan aimed to secure permits by the end of the first quarter of 2027, start supplying electricity in late fourth quarter 2026, and hand over data halls about 18 months after each permit. The November 5, 2026 Brooks announcement targets land with power available in the first quarter of 2027. Supplying electricity, preparing land, and handing over a finished data hall are different milestones. None of these targets proves the work has been completed.

How ownership and customer claims changed: On September 15, 2026, FingerMotion described the site companies as entirely its own. Its November 4, 2026 announcement also called Brooks Campus No. 1 Inc. wholly owned. The November 5, 2026 agreements introduce the 75%/25% FingerMotion and Genius Group split, but do not confirm that the site has been transferred into that ownership arrangement. Customer interest reported on September 24, 2026 for the wider program, October 15, 2026 for Brooks, and November 4, 2026 for up to 7 MW at Brooks does not amount to signed customer contracts.

Hanna is a separate project: The October 1, 2026 announcement describes Hanna as additional to the earlier 99 MW program, after earlier material had included it within the Brooks Zone. Hanna has its own purchase agreement, subject to conditions, and the separate GENIUSpark partnership announced October 27, 2026. ADCW has not confirmed that either the Brooks or Hanna purchase has been completed.

Earlier interest in the wider program: On September 24, 2026, FingerMotion reported possible customers interested in up to 52.5 MW across its Alberta program. They had not committed to buying that capacity. The figure is not contracted demand and cannot all be assigned to Brooks.

County rules and site approval: The County of Newell held a public hearing on proposed Bylaw 2129-26 on September 10, 2026 and listed a related petition on its September 24, 2026 Council agenda. ADCW has not confirmed whether the bylaw was finally adopted. These proposed rules would apply to future applications across the County. They are not a permit approving this Brooks project.

FingerMotion Hanna Campus #1

Verified listing

FingerMotion, Inc. / BlueFlare Group Holdings Inc. · Town of Hanna · AI / High-performance computing

Proposed AI computing campus on about 20.2 acres at 409 Pioneer Trail South in Hanna, under a conditional purchase agreement. FingerMotion’s September 21, 2026 announcement described a 9.9 MW campus; its October 1, 2026 design proposed 3 MW of grid supply plus 3 MW of natural-gas generation. The October 27, 2026 plan specifies 2.4 MW of first-phase computing capacity on 3 MW of proposed ATCO grid supply, with up to 3 MW of gas generation now optional. Computing capacity and power supply are separate figures; land closing, connection, financing, and approvals remain unconfirmed.

View project detailsHide project details
2.4 MW proposed first-phase computing capacity
The October 1, 2026 design contemplated 3 MW of grid supply plus 3 MW of gas generation. The October 27, 2026 plan retains 3 MW of proposed ATCO supply but makes up to 3 MW of gas generation optional. Its separate 2.4 MW figure is computing capacity, not total site demand.
Not disclosed
Not disclosedNo project-specific values found
Current status
ProposedProposed campus under a conditional land purchase. The latest design makes gas generation optional; land closing, grid connection, financing, and approvals remain unconfirmed.
Power arrangement

Proposed 3 MW of ATCO grid supply for the first phase, with the option to add up to 3 MW of on-site natural-gas generation. The grid connection agreement and regulatory approvals remain conditions.

Capacity context
2.4 MW proposed first-phase computing capacityCompany computing-capacity figure for 432 GPU servers, not total facility demand or grid supply. Retained as context rather than equated with a complete site-load figure.
Cooling and water
Not disclosedProject-specific cooling technology and routine water use have not been publicly disclosed.
Noise details
Not disclosedProject-specific noise details were not found in the public sources reviewed.
Verified
2026-11-01
Treaty geography
Treaty 7 territory

Grid-supply descriptions: On September 21, 2026, FingerMotion described 3 MW as available under an agreement with the Town of Hanna. Its October 27, 2026 release identifies ATCO as the proposed supplier and leaves a grid connection agreement as a closing condition. The releases do not reconcile those descriptions; ADCW does not treat the connection as secured.

GENIUSpark venture: The September 21, 2026 release described Hanna Campus #1 Inc. as wholly owned by FingerMotion. The October 27, 2026 agreements introduce GENIUSpark Alberta with proposed ownership of 51% FingerMotion and 49% Genius Group, alongside BlueFlare infrastructure work. This does not establish a completed ownership transfer.

Cost and financing: Estimated cost: $24.3 million, targeting $14.4 million in project debt and $9.9 million in equity. The release does not identify the currency. Financing is not secured.

Company schedule: The October 1, 2026 release placed construction after land closing and permit approval, without a calendar start date. The October 27, 2026 release targets December 2026 construction and first computing operations in the second quarter of 2027. Those conditions remain; the dates are targets.

Proposed corporate merger: On October 29, 2026, FingerMotion announced a non-binding BlueFlare combination. BlueFlare shareholders and certain management/advisory parties would hold approximately 80% of the combined company. The proposed BlueFlare Inc. name and BFLR ticker depend on completion.

Land agreement: The agreement to acquire approximately 20.2 acres at 409 Pioneer Trail South was executed September 30, 2026 and announced October 1, 2026. It provides 60 days for due diligence, including financing, utilities, zoning, and permits. Closing is scheduled 30 days after conditions are waived; completed ownership is not confirmed.

Broader program: The October 1, 2026 disclosure describes Hanna as additional to the previously announced 99 MW Alberta program, superseding the earlier description of Hanna within that program. This is a company portfolio statement, not approved capacity.

Customer interest: On September 24, 2026, FingerMotion reported nonbinding indications of interest for up to 52.5 MW across the Alberta program. It said no customer offtake agreement had been signed. The figure is neither Hanna-specific nor contracted demand.

What remains unconfirmed: The October 27, 2026 release leaves land closing, the grid connection, financing, and regulatory approvals conditional; customer contracts are not yet in place. Construction and operation remain unconfirmed.

Gayford Integrated Energy and Data Facility

Verified listing

Armada Nowlit Energy Ltd. · Rocky View County · Data processing / Workload undisclosed

A proposed integrated facility near Gayford pairing up to 20 MW of natural-gas generation with modular on-site data processing. Three earlier 19.95 MW AUC applications were closed for filing deficiencies.

View project detailsHide project details
19.95 MW proposed on-site generation
The municipal plan proposes up to 20 MW of natural-gas generation for exclusive on-site use, with no connection or export to the Alberta grid.
Not disclosed
Not independently confirmedMunicipal and AUC filing record
Current status
ProposedA proposed municipal master site development plan is not final. No active AUC power-plant application was identified after proceedings 30385, 30476, and 30709 were closed without merits decisions.
Power arrangement

The municipal plan proposes up to 20 MW of natural-gas generation for exclusive on-site use, with no connection or export to the Alberta grid.

Capacity context
19.95 MW proposed on-site generationThe three closed AUC applications each described a 19.95 MW gas-fired plant near Gayford. The current municipal plan sets a 20 MW maximum. This is proposed generation, not a verified data-centre load, and is excluded from headline totals while no active AUC application is identified.
Cooling and water
Not disclosedProject-specific cooling technology and routine water use have not been publicly disclosed.
Noise details
Not independently confirmedThe municipal plan says a noise-impact assessment demonstrates compliance with AUC Rule 012. The three AUC applications closed without merits decisions, so this is not a regulator finding or an operating measurement.
Verified
2026-09-14
Treaty geography
Treaty 7 territory

Municipal proposal: The plan seeks to redesignate a 1.8-hectare part of LSD 12, SE 35-26-25-W4M from Agricultural, General to a site-specific Direct Control District. Rocky View County lists the plan as proposed and not final.

AUC filing history: Proceedings 30385, 30476, and 30709 each concerned a 19.95 MW plant near Gayford. The AUC closed all three without prejudice after identifying numerous Rule 007 information deficiencies; it did not decide the project merits.

Third application: Application 30709-A001 was registered on April 8, 2026 and closed on May 7, 2026. The regulator cited deficiencies involving environmental evaluation, wildlife, emergency response, Indigenous consultation information, and participant involvement.

Data-processing scope: The municipal plan describes co-located modular data containers but does not identify a customer, installed computing hardware, specific workload, or data-centre electrical load.

Genesee Data Centre Site

Verified listing

Capital Power · Leduc County · Data centre / Workload undisclosed

An early data centre opportunity at the operating Genesee generating station near Warburg. AESO lists 1.5 GW across two connection requests, while Capital Power markets approximately 500 MW as available and says the project is not advancing immediately.

View project detailsHide project details
1.5 GW across two AESO connection requests
Existing 1,857 MW Genesee natural-gas generation site
Not disclosed
Not disclosedNo project-specific values found
Current status
ProposedAESO lists 1.5 GW across two data-load requests, but Capital Power says the site is not advancing immediately and no tenant or active build is confirmed
Power arrangement

Existing 1,857 MW Genesee natural-gas generation site; Capital Power markets approximately 500 MW as available by 2028 to 2029. The separate 1.5 GW AESO data-load requests are not committed construction or operating demand.

Capacity context
1.5 GW across two AESO connection requestsAESO lists P2942 at 1,000 MW and P2946 at 500 MW. Capital Power says the site is not advancing immediately, so ADCW treats this as queue context rather than an active build commitment.
Cooling and water
Not disclosedProject-specific cooling technology and routine water use have not been publicly disclosed.
Noise details
Not disclosedProject-specific noise details were not found in the public sources reviewed.
Verified
2026-08-20
Treaty geography
Treaty 6 territory

Why the figures differ: The 1.5 GW figure describes requested grid-load stages. The approximately 500 MW figure describes existing generation Capital Power says could be available. They measure different things and cannot be added together.

Goldfinch Technology Park Data Centre

Evidence profile

Diode Ventures · Wheatland County · Data centre / Workload undisclosed

Goldfinch's final concept plan proposes air-based cooling without process water, with water still needed for staff and fire protection. The approximately 576-acre park west of Carseland would open in three phases, subject to permits and power availability. Final power arrangements remain unresolved.

Read evidence profile
Quick factsHide quick facts
950 MW AESO connection request
Proposed grid supply through AESO P3102, with on-site emergency backup. Final supply remains unresolved.
Air-based cooling proposed; final equipment pending
Study requiredDevelopment-permit stage
Current status
ProposedThe concept plan was adopted on August 11, 2026. No project-specific development permit has been verified. AESO’s August 2026 report lists a 950 MW grid request with connection dates under review.
Power arrangement

Proposed grid supply through AESO P3102, with on-site emergency backup. Final supply remains unresolved.

Capacity context
950 MW AESO connection requestP3102 has 650 MW and 300 MW DTS stages at Stage 2. Both in-service dates are under review in AESO's August 2026 list. This is one campus request, not 950 MW of approved or operating load.
Cooling and water
Air-based cooling proposed; final equipment pendingThe final concept plan estimates 11,200 L/day for domestic use, based on about 100 staff, and proposes separate fire-water storage. County raw water or on-site wells could supply these needs; the final source and authorizations remain unconfirmed.
Noise details
Study requiredWSP's June submission says a noise-impact assessment is required at each development-permit stage. Diode proposes mitigation, but ADCW did not find numerical receptor predictions or operating measurements in the reviewed package and project updates.
Verified
2026-10-08
Location precision
Approximate area →
Treaty geography
Treaty 7 territory

HubOne AI Trillion Token Factory

Verified listing

Elemental Developments / HubOne · Wheatland County · AI / Cloud computing

A proposed AI/cloud campus in Wheatland County with 50 MW of dedicated on-site power targeted for 2027, expanding to 400 MW in 2028. The provincial registry previously described at least 750 MW of AI capacity and up to 3,000 MW of mixed-use power, recorded by ADCW on August 20, 2026. The relationship between those plans remains unresolved.

View project detailsHide project details
50 MW initially; 400 MW proposed on-site power
November 2026: 50 MW initially, expanding to 400 MW of proposed on-site power. August 2026: up to 3,000 MW for the mixed-use park.
Liquid-to-chip cooling proposed by HubOne
Not disclosedNo project-specific values found
Current status
ProposedConstruction, project-specific approvals, and committed financing remain unconfirmed.
Power arrangement

Dedicated on-site power is proposed. The final supply assets and delivery arrangements remain unconfirmed.

Capacity context
50 MW initially; 400 MW proposed on-site powerThe registry describes power supply, not confirmed equipment demand or approved generation. Individual private AI facilities would start at 10 MW each; the deployment dates remain targets.
Cooling and water
Liquid-to-chip cooling proposed by HubOneHubOne's public vCloud page describes liquid-to-chip cooling. The final heat-rejection method, water source, and routine water use remain unconfirmed.
Noise details
Not disclosedProject-specific noise details were not found in the public sources reviewed.
Verified
2026-11-18
Treaty geography
Treaty 7 territory

Earlier plan: Formerly HubOne AI and BTC High Density Compute Park. The August 20, 2026 record described 15 AI facilities starting at 50 MW each, implying at least 750 MW of AI capacity, plus up to 3,000 MW of power across AI and Bitcoin operations. The November 2026 description gives power-supply figures for an AI/cloud proposal. The different measures and unresolved campus boundaries prevent a like-for-like comparison. This does not establish a confirmed reduction or cancellation of wider Bitcoin plans. These claims remain excluded from provincial headline totals.

North Gate relationship: HubOne identifies North Gate facilities in Alberta as the physical infrastructure for its cloud offering. The wider campus boundaries, ownership shares, and HubOne's precise allocation remain unconfirmed.

Site details: A legal parcel and project acreage have not been verified. The provincial registry's map point remains approximate.

Kakwa Data Processing Centre

Evidence profile

New West Data Acquisition Corp. · Municipal District of Greenview No. 16 · Cryptocurrency mining

New West Data Acquisition Corp. proposes a cryptocurrency data-processing centre of up to 9.9 MW at an existing industrial site in the Kakwa area. An 8.40 MW isolated natural-gas power plant and a Crown disposition are approved, while the reviewed municipal record is an approval recommendation, not an issued development permit.

Read evidence profile
Quick factsHide quick facts
Up to 9.9 MW in the recommended municipal permit
The AUC approved an 8.40 MW isolated natural-gas power plant. The Crown disposition requires standalone power and prohibits use of the Alberta Interconnected Electric System.
Not disclosed
39.7 dBA vs 40.0 dBA limitHighest modelled cumulative level at the most affected receptor
Current status
ProposedMunicipal agenda recommends approval of D26-087; no issued permit or meeting decision reviewed; 8.40 MW isolated power plant and Crown disposition approved
Power arrangement

The AUC approved an 8.40 MW isolated natural-gas power plant. The Crown disposition requires standalone power and prohibits use of the Alberta Interconnected Electric System.

Capacity context
Up to 9.9 MW in the recommended municipal permitGreenview administration recommended approving a data-processing centre not exceeding 9.9 MW. The agenda package does not establish that the Municipal Planning Commission adopted the recommendation or that the project is operating.
Cooling and water
Not disclosedThe reviewed records do not identify the data centre's cooling system or quantify routine water use.
Noise details
39.7 dBA vs 40.0 dBA limitGreenview staff summarize the applicant's model as 39.7 dBA cumulative sound at the most affected receptor, below the applicable 40.0 dBA permissible level. This is a modelledModelled versus measuredA modelled result is a prediction based on inputs and assumptions. A measured result comes from observations or instruments under particular conditions.A prediction is not verified operating performance. Check the location, period, operating scenario, and what the reported number actually represents.Learn more → result, not an operating measurement at nearby communities.
Verified
2026-09-21
Location precision
Approximate area →
Treaty geography
Treaty geography not established in the reviewed sources

Municipal application: D26-087 is a discretionary-use application. The September 9, 2026 agenda recommends approval, but the reviewed package does not include the Municipal Planning Commission's decision or an issued permit.

Power approval: AUC Proceeding 30521 approved five Caterpillar G3520 natural-gas engines with 8.40 MW total generating capability on February 12, 2026.

Existing industrial site: The proposed data centre would occupy an existing oil-and-gas lease site with a multi-well battery, compressor station, generation equipment, and related infrastructure.

Crown disposition: DLO260092 authorizes overlapping rural commercial cryptocurrency activity from June 15, 2026 to January 22, 2044, subject to its terms and the underlying disposition.

Disturbance: The municipal package says all equipment would remain inside the existing lease and no additional clearing is proposed. The survey identifies a 0.248-hectare cryptocurrency site with no new-cut disturbance.

Other provincial approvals: Greenview staff cite Alberta Energy Regulator facility licence amendment F53063. The AUC decision separately said construction could not start until the Environmental Protection and Enhancement Act industrial application was approved; the reviewed sources do not confirm that later approval.

KALiNA Clairmont Energy Park

Verified listing

KALiNA Distributed Power Limited · County of Grande Prairie · Power site targeting data centre customers; workload unconfirmed

A proposed natural-gas power development on an approximately 160-acre site in the Clairmont area, County of Grande Prairie, held under an option to purchase. KALiNA's earlier plans described 170 MW plants; its October 2025 presentation and October 30, 2026 report use an approximately 200 MW initial design. The site is being marketed to compute buyers, but a data centre operator, computing capacity, and construction start remain unconfirmed.

View project detailsHide project details
Approx. 200 MW plant design; earlier 170 MW
Proposed natural-gas generation: earlier 170 MW concept, later approximately 200 MW initial design, and a separate 178 MW AESO generation request. No data centre load is confirmed.
Not disclosed
Not disclosedNo project-specific values found
Current status
ProposedProposed power development marketed to data centre customers; a neighbouring campus, binding customer agreement, site-specific data centre approvals, and construction remain unconfirmed.
Power arrangement

Proposed natural-gas generation: earlier 170 MW concept, later approximately 200 MW initial design, and a separate 178 MW AESO generation request. No data centre load is confirmed.

Capacity context
Approx. 200 MW plant design; earlier 170 MWCompany-described initial generation design, not approved plant capacity or data centre demand. The separate 178 MW AESO filing measures requested grid generation service. Excluded from ADCW's headline generation total because a dedicated data centre supply relationship is unconfirmed.
Cooling and water
Not disclosedProject-specific cooling technology and routine water use have not been publicly disclosed.
Noise details
Not disclosedProject-specific noise details were not found in the public sources reviewed.
Verified
2026-11-10
Treaty geography
Treaty 8 territory

Data centre relationship: KALiNA is proposing a power plant here and seeking data centre customers for its electricity. A customer could be located elsewhere and buy power under a contract; a data centre would not necessarily be built beside the plant. A customer, data centre location, and binding power contract have not been confirmed. KALiNA's report for the quarter ending June 30, 2025 listed this site separately from its Crusoe agreement.

Sales process: TwelveSix Services identifies an active exclusive sales mandate for Gilby, Clairmont, and Saddle Hills aimed at compute buyers. It is acting as a sales adviser; the mandate does not establish a completed sale, customer commitment, or transfer of ownership.

AESO queue status: AESO's November 2026 list shows P3006, Clairmont Energy Gas, active at Stage 3, with 178 MW generation and 20 MW load. The filing does not establish that the load is a data centre. The May 1, 2029 load and June 1, 2029 generation dates are planning targets, not confirmed opening dates.

Gas supply: KALiNA's October 30, 2026 report describes Clairmont as being in an unconstrained gas-supply area. This is a company statement about availability, not confirmation of an executed gas-supply agreement.

Development status: KALiNA says Clairmont advanced into AESO's second assessment group and that approximately C$2.6 million in security was posted with AESO and ATCO. This is progress in the electricity-connection process, not permission to build a data centre. Remaining company work includes rezoning, gas-supply contracts, and project approvals.

Carbon capture: Earlier KALiNA plans incorporated carbon capture and storage. The October 2025 presentation treats capture as optional or a later addition. A final site-specific capture commitment and design remain unconfirmed.

Location evidence: The approximate marker follows AESO's November 2026 geographic point for P3006, consistent with KALiNA's named Clairmont area site. It is not a surveyed parcel or building location. AESO cautions that early-stage project locations can change.

KALiNA Energy Centre - Saddle Hills

Verified listing

KALiNA Saddle Hills GP Inc. / KALiNA Power · Saddle Hills County · Power site seeking a data centre partner; workload unconfirmed

A natural-gas power development on an approximately 16-acre Crown-leased site in the Gordondale area, Saddle Hills County, seeking a data centre partner. The website describes an approximately 64 MW plant, while the former AUC approval recorded 66.2 MW including backup generation. The AUC rescinded that approval and its connection order on October 2, 2026. KALiNA says development continues; its separate 100 MW AESO request is not a replacement construction approval.

View project detailsHide project details
100 MW grid-generation request; old approval rescinded
The former 66.2 MW plant approval and connection order were rescinded October 2, 2026. A separate 100 MW generation connection request remains in AESO's November 2026 list
Not disclosed
Not disclosedNo project-specific values found
Current status
ProposedKALiNA says development continues toward a new design. The AUC rescinded the old plant approval and connection order on October 2, 2026; a replacement facility approval and committed data centre customer remain unconfirmed.
Power arrangement

The former 66.2 MW plant approval and connection order were rescinded October 2, 2026. A separate 100 MW generation connection request remains in AESO's November 2026 list; the revised plant configuration and approval are unconfirmed.

Capacity context
100 MW grid-generation request; old approval rescindedAESO's November 2026 list records a 100 MW generation request for P3233. This is not approved plant capacity, operating generation, or a data centre load. Excluded from headline generation totals because a dedicated data centre supply relationship is unconfirmed.
Cooling and water
Not disclosedProject-specific cooling technology and routine water use have not been publicly disclosed.
Noise details
Not disclosedProject-specific noise details were not found in the public sources reviewed.
Verified
2026-11-10
Treaty geography
Treaty 8 territory

AUC cancellation: On October 2, 2026, the AUC issued 31088-D01-2026 in Proceeding 31088, Application 31088-A001, rescinding Power Plant Approval 30493-D02-2025 and Connection Order 30493-D03-2025. KALiNA's September 24, 2026 application said it could not meet the approved December 31, 2028 construction-completion deadline and needed more time to finalize the plant configuration.

Future application: The AUC letter records KALiNA's intention to continue development and submit a new Rule 007 facility application once the configuration is finalized. That is the applicant's stated intention, not approval of a replacement plant. A later facility application, revised design, and replacement approval remain unconfirmed in the sources reviewed.

AESO queue status: AESO's November 2026 list includes P3233, Saddle Hills Gas, in Cluster 3 at Stage 1, with 100 MW generation and 2 MW load. The October 1, 2028 date is an electricity-connection planning target, not a confirmed opening or a substitute for the cancelled AUC permission.

Data centre relationship and sales: KALiNA's project page markets the site for co-location with a data centre. The AUC's June 12, 2025 decision also records efforts to secure a data centre partner. TwelveSix currently markets Saddle Hills alongside Gilby and Clairmont. No committed operator, binding customer agreement, computing capacity, or data centre construction is confirmed. KALiNA's report for the quarter ending June 30, 2025 excluded these three sites from the Crusoe AI data centre framework.

Website approval claim: KALiNA's project webpage, accessed November 10, 2026, still describes the approximately 64 MW site as permitted. The AUC's October 2, 2026 rescission is the later regulatory evidence. The website wording does not establish that replacement approval has been granted.

Land and gas supply: KALiNA's October 30, 2026 report lists approximately 16 acres under a 25-year Crown lease and describes the area as unconstrained for gas supply. Neither establishes a completed gas-supply contract or a data centre development approval.

Location evidence: The approximate marker follows AESO's November 2026 geographic point for P3233 in the Gordondale area. The former plant approval identifies LSD 16, Section 36, Township 77, Range 10, west of the Sixth Meridian. The marker is not a surveyed parcel or building location; the eventual revised facility footprint remains unconfirmed.

KALiNA Gilby Power Park

Verified listing

KALiNA Distributed Power Limited · Lacombe County · Power site targeting data centre customers; workload unconfirmed

A proposed natural-gas power development on an approximately 80-acre site in the Gilby area, Lacombe County, held under an option to lease. KALiNA's earlier plans described 170 MW plants; its October 2025 presentation and October 30, 2026 report use an approximately 200 MW initial design. The site is being marketed to compute buyers, but a data centre operator, computing capacity, and construction start remain unconfirmed.

View project detailsHide project details
Approx. 200 MW plant design; earlier 170 MW
Proposed natural-gas generation: earlier 170 MW concept, later approximately 200 MW initial design, and a separate 178 MW AESO generation request. No data centre load is confirmed.
Not disclosed
Not disclosedNo project-specific values found
Current status
ProposedProposed power development marketed to data centre customers; a neighbouring campus, binding customer agreement, site-specific data centre approvals, and construction remain unconfirmed.
Power arrangement

Proposed natural-gas generation: earlier 170 MW concept, later approximately 200 MW initial design, and a separate 178 MW AESO generation request. No data centre load is confirmed.

Capacity context
Approx. 200 MW plant design; earlier 170 MWCompany-described initial generation design, not approved plant capacity or data centre demand. The separate 178 MW AESO filing measures requested grid generation service. Excluded from ADCW's headline generation total because a dedicated data centre supply relationship is unconfirmed.
Cooling and water
Not disclosedProject-specific cooling technology and routine water use have not been publicly disclosed.
Noise details
Not disclosedProject-specific noise details were not found in the public sources reviewed.
Verified
2026-11-10
Treaty geography
Treaty 6 territory

Data centre relationship: KALiNA is proposing a power plant here and seeking data centre customers for its electricity. A customer could be located elsewhere and buy power under a contract; a data centre would not necessarily be built beside the plant. A customer, data centre location, and binding power contract have not been confirmed. KALiNA's report for the quarter ending June 30, 2025 listed this site separately from its Crusoe agreement.

Sales process: TwelveSix Services identifies an active exclusive sales mandate for Gilby, Clairmont, and Saddle Hills aimed at compute buyers. It is acting as a sales adviser; the mandate does not establish a completed sale, customer commitment, or transfer of ownership.

AESO queue status: AESO's November 2026 list marks the original Gilby Power Park generation request, P2982, recently cancelled and separately lists P3249, Gilby Gas, in Cluster 3 at Stage 1, requesting 178 MW generation and 3 MW load. These figures are not a data centre's computing capacity. The June 1, 2029 generation date is a connection-planning target, not a confirmed opening.

Gas supply: KALiNA's October 30, 2026 report says regulated NGTL supply for Gilby remains constrained. It is pursuing alternative supplies from gas producers and processing plants. A completed alternative supply agreement remains unconfirmed.

Development status: KALiNA describes remaining early development work on electricity connections, rezoning, and gas-supply contracts, with AUC power-plant applications to be prioritized according to funding and progress. Site-specific data centre approvals and construction are not established.

Carbon capture: Earlier KALiNA plans incorporated carbon capture and storage. The October 2025 presentation treats capture as optional or a later addition. A final site-specific capture commitment and design remain unconfirmed.

Location evidence: The approximate marker follows AESO's November 2026 geographic point for P3249, consistent with KALiNA's named Gilby area site. It is not a surveyed parcel or building location. AESO cautions that early-stage project locations can change.

Lynx Data Centre Proposal

Evidence profile

Developer not publicly identified; Pembina-linked landowner reported by The Logic · Sturgeon County · Data centre; computing workload unconfirmed

An early-stage data-centre proposal in Sturgeon County with two 1,800 MW AESO load requests. The Logic reports a Pembina-linked land acquisition of approximately 134 acres beside Greenlight and links Lynx to two proposed Sturgeon Gas power plants. The full campus footprint and customer remain unconfirmed.

Read evidence profile
Quick factsHide quick facts
3,600 MW requested across two phases
Two proposed Sturgeon Gas power plants are linked to Lynx by The Logic. Final electrical design, grid supply, gas contracts, and approvals are unconfirmed.
Not publicly established
Not disclosedNo Lynx-specific assessment identified
Current status
ProposedProposed; two Stage 1 AESO load requests with in-service dates under review. Lynx-specific construction approvals are unconfirmed.
Power arrangement

Two proposed Sturgeon Gas power plants are linked to Lynx by The Logic. Final electrical design, grid supply, gas contracts, and approvals are unconfirmed.

Capacity context
3,600 MW requested across two phasesNovember 2026 AESO P3198 and P3204 each request 1,800 MW of demand transmission serviceGrid connection requestA request for new or changed electricity delivery capacity through the Alberta Electric System Operator (AESO).Requested capacity is not measured electricity use, a guaranteed connection, or approval to build a data centre.Learn more →. This is a request total, not an approved grid allocation, installed computing capacity, or measured use. Kept outside provincial headline capacity totals while campus computing capacity remains unconfirmed.
Cooling and water
Not publicly establishedNo Lynx-specific water source, allocation, daily demand, or cooling-water design was identified.
Noise details
Not disclosedNo Lynx-specific assessment of sound at nearby communities or equipment operating limits was identified.
Verified
2026-11-11
Location precision
Approximate area →
Treaty geography
Treaty 6 territory (approximate project location)

Land: The Logic reports approximately 134 acres acquired in October 2026. The full campus footprint is not confirmed.

Customer: No hyperscale customer is publicly identified in the reviewed sources.

Map location: AESO's November 2026 P3198 marker is approximate and subject to change. It does not define a parcel or building footprint.

Malachite One Data Centre

Evidence profile

Emerald Energy Technologies Corp. (Tourmaline Oil Corp. subsidiary) · Yellowhead County · AI / High-performance computing

A proposed AI and high-performance-computing campus on Crown land beside the Banshee Gas Plant, pairing up to 930 MW of on-site natural-gas generation with a 74.9 MW AESO grid-load request.

Read evidence profile
Quick factsHide quick facts
930 MW proposed on-site generation at full build
The concept combines up to 930 MW of on-site natural-gas generation with AESO's active 74.9 MW P3114 grid-load request.
Primarily closed-loop air-based cooling, with supplementary evaporative cooling proposed
Not disclosedNo project-specific values found
Current status
ProposedAESO lists an active 74.9 MW Stage 3 grid connection request. Yellowhead County received the June 2026 concept for information. Project-specific construction approvals remain unconfirmed.
Power arrangement

The concept combines up to 930 MW of on-site natural-gas generation with AESO's active 74.9 MW P3114 grid-load request.

Capacity context
930 MW proposed on-site generation at full buildA proponent projectionProponent projectionA forecast, target, estimate, or promised future outcome from the company proposing the project.The label identifies whose projection it is. It does not turn a future claim into an independently verified result or an enforceable approval condition.Learn more →, not approved or operating generation. The presentation's separate 1,104 MW full-build total does not reconcile with its listed 930 MW generation and 74 MW grid components.
Cooling and water
Primarily closed-loopClosed-loop coolingCooling fluid circulates repeatedly through a contained loop instead of being routinely discharged after one pass.That describes the loop, not the whole site's water use. A separate heat-rejection system can still use water, and filling, maintenance, and leaks also matter.Learn more → air-based cooling, with supplementary evaporative cooling proposedMost proposed water demand is associated with power-plant steam generation. No complete project water balance or project-specific Water Act authorization was identified.
Noise details
Not disclosedProject-specific noise details were not found in the public sources reviewed.
Verified
2026-11-22
Location precision
Approximate area →
Treaty geography
Treaty 6 territory

Full-build concept: Up to 7.1 million square feet across three phases, with a projected 30-year operating life.

Proposed investment: Up to CA$15 billion for the data centre and CA$5 billion for associated power generation.

Employment claims: Emerald projects data-centre staffing beginning around 300 and growing to 700, while Alberta Major Projects reports 300 to 500 long-term data-centre jobs.

Mihta Askiy Data Centre

Evidence profile

Mihta Askiy Datacenter LP / Cree Ative Datacenter Corp GP · Northern Sunrise County · AI / High-performance computing

A majority Woodland Cree First Nation-owned proposal to reuse the former Carmon Creek industrial site for a 650 MW data centre and natural-gas power plant.

Read evidence profile
Quick factsHide quick facts
650 MW proposed data centre load at full build
Proposed 650 MW on-site natural-gas generation with a planned grid connection
Closed-loop data-centre cooling proposed
Not disclosedNo project-specific values found
Current status
ProposedThe proposed power plant and substation remain under AUC review. The federal decision did not approve construction.
Power arrangement

Proposed 650 MW on-site natural-gas generation with a planned grid connection; the AUC applications remain under review.

Capacity context
650 MW proposed data centre load at full buildThe filing describes an initial 400 MW data centre followed by a 250 MW expansion.
Cooling and water
Closed-loopClosed-loop coolingCooling fluid circulates repeatedly through a contained loop instead of being routinely discharged after one pass.That describes the loop, not the whole site's water use. A separate heat-rejection system can still use water, and filling, maintenance, and leaks also matter.Learn more → data-centre cooling proposedThe related power plant is expected to use evaporative cooling; initial-phase project demand is projected at up to 5,000 m³/day (5 million L/day).
Noise details
Not disclosedProject-specific noise details were not found in the public sources reviewed.
Verified
2026-08-23
Location precision
Approximate area →
Treaty geography
Treaty 8 territory

Federal principles: Sovereign Digital Infrastructure, identified in the project's federal filing as its 49 per cent owner, is listed as a signatory to Canada's five responsible data-centre development principles. This is a company commitment, not a project approval or permit condition. What the five principles mean →

Newell Data Center MPC Load

Verified listing

Not publicly disclosed · County of Newell · Data centre / Workload undisclosed

An unnamed developer's 1.2 GW grid-load connection request in AESO's Brooks planning area. The County held a September 10, 2026 public hearing on proposed data centre rules and listed a petition about the bylaw on its September 24, 2026 Council agenda. Final adoption has not been verified; the municipal process does not approve this project or identify its developer.

View project detailsHide project details
Brooks / County of Newell area
1.2 GW AESO connection request
Proposed Alberta grid connection through AESO Project P3109
Not disclosed
Requirement proposedNo project application filed
Current status
ProposedAESO Project P3109 is active in connection-process Stage 2 with three 400 MW stages, all with in-service dates under review; County-wide data centre rules remain proposed, and no project-specific development application or approval has been confirmed
Power arrangement

Proposed Alberta grid connection through AESO Project P3109; a final supply design, on-site generation plan, and backup-power system have not been publicly confirmed.

Capacity context
1.2 GW AESO connection requestAESO lists three 400 MW data-load stages, each with its in-service date under review. This is a request in the connection process, not construction approval, committed service, or operating demand.
Cooling and water
Not disclosedProject-specific cooling technology and routine water use have not been publicly disclosed.
Noise details
Requirement proposedThe County's proposed data-centre bylaw would require project-specific noise information and mitigation, but the County says no development application for P3109 has been confirmed. ADCW did not identify a project-specific assessment in the August 29 review.
Verified
2026-09-29
Location precision
Regional location only; project parcel unverified
Treaty geography
Treaty 7 territory

Municipal status: The County held a public hearing on Bylaw 2129-26 on September 10, 2026, when its agenda also listed the bylaw for second reading. Its September 24, 2026 Council agenda listed a petition about the bylaw but no third reading. The County still labels the bylaw proposed; ADCW has not verified final adoption. These County-wide rules would not approve P3109, and no project-specific development application has been confirmed.

Location lead: Local reporting places the prospective site near Highway 36 and Silver Sage Road on approximately 500 hectares of Eastern Irrigation District land. ADCW has not found a primary project record confirming the parcel, so no map marker is published.

Workload gap: AESO identifies a data-load request but does not disclose the intended computing workload. No public source reviewed by ADCW identifies an AI, high-performance computing, cryptocurrency, or mixed-use allocation.

Northeast Calgary Data Centre Proposal

Verified listing

Not publicly confirmed · City of Calgary · Data centre / Workload undisclosed

A proposed data centre with associated power generation on undeveloped land north of Redstone in northeast Calgary, east of 52 Street NE. The application covers 14047 68 Street NE and adjoining parcels. Calgary is reviewing the requested land-use changes; building footprint, power capacity, and operator remain unconfirmed.

View project detailsHide project details
Not disclosed
Associated power generation is proposed
Not disclosed
Not disclosedNo project-specific values found
Current status
ProposedLand-use and outline-plan application LOC2026-0156 remains under review as of November 11, 2026. No permission to build or operate is established.
Power arrangement

Associated power generation is proposed; fuel, capacity, grid connection, and final supply arrangements remain unconfirmed.

Capacity context
Not disclosedNo additional capacity context published.
Cooling and water
Not disclosedProject-specific cooling technology and routine water use have not been publicly disclosed.
Noise details
Not disclosedProject-specific noise details were not found in the public sources reviewed.
Verified
2026-11-11
Location precision
Approximate area →
Treaty geography
Treaty 7 territory

Planning application: Calgary's land-use dataset lists LOC2026-0156 as a Land Use Amendment and Outline Plan application, submitted August 13, 2026, with Stantec Consulting as applicant. Its status remains Under Review. Rezoning changes what land may be used for; it does not itself authorize construction or operation.

Application parties: Global News identifies Walton Global alongside Stantec in the rezoning proposal. The future operator is unconfirmed.

Proposed use: LiveWire Calgary identifies LOC2026-0156 as a proposal for a data centre and associated power generation. The City's dataset records proposed industrial, natural-area, and infrastructure districts in place of the existing future-urban-development designation. The dataset's district codes do not establish a final site-specific design.

What remains unknown: The reviewed sources do not establish computing workload, operator or tenants, building count or footprint, data-centre electricity demand, generation capacity or fuel, cooling technology, water source or demand, sound levels at nearby communities, or construction and operating dates.

Application status and next steps: No approval or construction start has been verified. Check the City's application page for current documents, contact details, opportunities to comment, and any later public hearing. The effect of Calgary's separate citywide data-centre policy process on this application remains unconfirmed.

Location evidence: Calgary lists 14010R 52 Street NE, 14010 52 Street NE, 14047R 68 Street NE, and 14047 68 Street NE on the same application. The approximate marker uses the City's published application point at 51.18034 N, 113.95010 W. It represents the application area, not a verified building location or the boundaries of all four parcels. Contains information licensed under the Open Government Licence – City of Calgary.

Prairie Sky Strathmore Campus

Verified listing

Prairie Sky Data Solutions · Town of Strathmore · AI-ready colocation

A phased AI-ready colocation campus beginning with a 2 MW retrofit and targeting 50 MW across five phases.

View project detailsHide project details
50 MW full-build roadmap
Company says expansion depends on securing additional power and infrastructure.
Prairie Sky says direct liquid cooling is designed for rack densities up to 150 kW
Not disclosedNo project-specific values found
Current status
ProposedCompany describes a retrofit, but construction and operation are not independently verified; Alberta Major Projects still classifies Phase 1 as Proposed
Power arrangement

Company says expansion depends on securing additional power and infrastructure.

Capacity context
50 MW full-build roadmapPrairie Sky's roadmap lists a 2 MW first phase; a 4 MW expansion to 6 MW total; then 14 MW, 36 MW, and 50 MW total capacity. Later phases are company targets and include a nearby second site.
Cooling and water
Prairie Sky says direct liquid coolingLiquid coolingLiquid carries heat away from computing equipment, for example through cold plates at the chips.This describes how heat leaves the equipment. It does not identify how heat is ultimately released outside, or establish the site's water demand.Learn more → is designed for rack densities up to 150 kWPrairie Sky promotes direct liquid cooling, but routine water withdrawalWithdrawal, consumption, and dischargeWithdrawal is water taken from a source. Consumption is the portion not returned to the same water system. Discharge is water released after use or treatment.These are different quantities. Check which one a water figure describes before comparing projects.Learn more → and consumption are not publicly quantified.
Noise details
Not disclosedProject-specific noise details were not found in the public sources reviewed.
Verified
2026-09-11
Treaty geography
Treaty 7 territory

Opening date remains unconfirmed: The company website still carries a Q2 2026 opening target in its page description. That date has passed. No municipal permit, energization record, or direct operating announcement was located in the September 11 review; the target is not evidence that Phase 1 opened.

What 50 MW means: The company's current roadmap starts with a 2 MW retrofit and expands across five phases, including a nearby second site. The 50 MW total is a future target, not capacity verified in service.

Community benefit discussions: Strathmore's Q3 2025 report records discussions about Phase 3 and a possible annual community donation versus a special tax. This establishes municipal engagement, not a signed benefit agreement, permit, or proof that earlier phases opened.

Slave Lake Pulp / A.E.C. Mill Data Load

Verified listing

Data-centre developer and operator not publicly identified · Municipal District of Lesser Slave River No. 124 · Data load; computing workload unconfirmed

A 60 MW data-load request is associated with the existing Slave Lake Pulp / A.E.C. Mill 844S electrical facility in the Mitsue area. The proposed data centre's developer, operator, building footprint, and approvals are not publicly confirmed.

View project detailsHide project details
60 MW AESO data-load request
The Alberta Electric System Operator (AESO) lists P3236 as a 60 MW data-load request, BTF (behind the fence), Stage 1, in its September and November 2026 reports. This grid request is for electricity delivery capacity, not approved or operating computing demand.
Not disclosed
Not disclosedNo project-specific values found
Current status
ProposedAESO P3236: 60 MW data-load request, BTF, Stage 1; data-centre approvals and construction unconfirmed
Power arrangement

The Alberta Electric System Operator (AESO) lists P3236 as a 60 MW data-load request, BTFBehind the fence (BTF)AESO uses this process for changes to existing facilities connected to the transmission system that require updated facility data.The category does not by itself establish an off-grid design, new generation, or a data-centre development approval.Learn more → (behind the fence), Stage 1, in its September and November 2026 reports. This grid requestGrid connection requestA request for new or changed electricity delivery capacity through the Alberta Electric System Operator (AESO).Requested capacity is not measured electricity use, a guaranteed connection, or approval to build a data centre.Learn more → is for electricity delivery capacity, not approved or operating computing demand.

Capacity context
60 MW AESO data-load requestP3236 demand transmission service request in the September and November 2026 lists. This is requested grid load, not approved or operating computing capacity. Excluded from provincial headline demand totals while project-specific computing capacity remains unconfirmed.
Cooling and water
Not disclosedProject-specific water requirements have not been published.
Noise details
Not disclosedNo project-specific assessment of sound at nearby communities has been identified.
Verified
2026-11-22
Location precision
Approximate area →
Treaty geography
Treaty 8 territory (approximate existing mill location)

Application date: July 30, 2026, as recorded in AESO's September 2026 report.

Target service date: July 15, 2028, for the AESO grid request; not a confirmed data-centre opening date.

Existing facility: AESO identifies Slave Lake Pulp with facility code 844S. Millar Western Forest Products Ltd. operates the pulp mill; this does not identify the data-centre proponent.

Municipal discussion: The draft August 27, 2026 minutes record COW 076-26 directing Administration to add Data Centers to a future Committee of the Whole meeting. On October 28, 2026, Council directed Administration to prepare options for potential data-centre land-use bylaw amendments. This direction does not identify P3236 or approve this project.

StratGrid Project Wheatland

Verified listing

StratGrid Inc. · Wheatland County · AI / High-performance computing

StratGrid proposes four data centre buildings with approximately 198 MW of electrical demand, about 2.5 km west of Carseland in Wheatland County. Its November 2026 proposal describes a 213-acre development area and 320 MW of installed gas generation, with six units normally providing about 240 MW and two held in reserve. Earlier disclosures described 360 acres and approximately 200 MW of generation in July 2026; a broader earlier Alberta concept gave about 250 MW. The land scopes and earlier capacity figures remain unreconciled. Approvals remain outstanding.

View project detailsHide project details
Approximately 198 MW proposed data centre electrical demand
Proposed off-grid gas plant: 320 MW installed, about 240 MW with six units operating. Earlier July 2026 design: about 200 MW. The separate data centre demand is approximately 198 MW.
Closed-loop liquid cooling; air-cooled power-plant condensers proposed
Not disclosedNo receptor values found
Current status
ProposedConsultation underway; StratGrid's November 2026 schedule targets Alberta Utilities Commission and municipal applications in Q1/Q2 2027. Project approvals remain outstanding.
Power arrangement

Proposed off-gridNon-grid-connectedThe facility has no electrical connection to Alberta's interconnected grid and relies on supply available to the site.It does not directly draw from or send electricity to that grid. Power-plant approvals and local impacts can still matter.Learn more → gas plant: 320 MW installed, about 240 MW with six units operating. Earlier July 2026 design: about 200 MW. The separate data centre demand is approximately 198 MW.

Capacity context
Approximately 198 MW proposed data centre electrical demandStratGrid's November 2026 proposal gives this anticipated electrical demand for four digital infrastructure buildings. It is not explicitly identified as IT load or measured operating use, and is separate from the associated power plant and batteries.
Cooling and water
Closed-loopClosed-loop coolingCooling fluid circulates repeatedly through a contained loop instead of being routinely discharged after one pass.That describes the loop, not the whole site's water use. A separate heat-rejection system can still use water, and filling, maintenance, and leaks also matter.Learn more → liquid coolingLiquid coolingLiquid carries heat away from computing equipment, for example through cold plates at the chips.This describes how heat leaves the equipment. It does not identify how heat is ultimately released outside, or establish the site's water demand.Learn more →; air-cooled power-plant condensers proposedStratGrid's November 2026 proposal describes closed-loop liquid cooling for the data centre and air-cooled condensers to reduce power-plant cooling-water needs. Water is still needed for treatment, steam generation, and other operations. Proposed supply is Wheatland County's existing non-potable industrial raw-water pipeline, subject to confirmation and arrangements. Volumes, initial fill, wastewater measures, and water authorizations remain unconfirmed. This adds power-plant water uses beyond the website's office-use and periodic-top-up description; it does not establish a waterlessWaterless coolingThis usually describes cooling that rejects heat without routinely evaporating water in cooling towers.It does not establish zero water use across the site, or the absence of cooling fluids. The full design and the scope of the claim matter.Learn more → campus. The earlier immersionImmersion coolingComputing equipment is submerged in a fluid designed not to conduct electricity, which carries heat away.The fluid and the outside heat-rejection system are separate design questions. This term alone does not establish water use, electricity efficiency, or spill controls.Learn more →-ready description is not repeated.
Noise details
Not disclosedStratGrid said in November 2026 that a Noise Impact Assessment is being completed. StratGrid also proposes quieter equipment, enclosures and barriers, setbacks, berms, and landscaping. No numerical predictions for nearby communities or completed assessment were identified in this review.
Verified
2026-11-16
Treaty geography
Treaty 7 territory

Land and site layout: StratGrid's November 2026 proposal locates two parcels totalling approximately 213 acres on part of Section 10-22-26-W4M, about 2.5 km west of Carseland, south of Township Road 222, west of Highway 24, and north of the CP rail tracks. StratGrid's website separately says it secured 360 acres in May 2026. Whether this is a smaller development footprint within the secured land or another scope difference remains unresolved. The map marker remains approximate and does not represent surveyed boundaries or building locations.

Proposed rezoning: StratGrid's November 2026 proposal includes rezoning the approximately 80-acre Power Island portion to Heavy Industrial and describes the data centre portion as already zoned Medium Industrial within the Goldfinch Industrial Area Structure Plan. This is the developer's description, not an independently checked county zoning determination, adopted rezoning, or development permit.

Power and gas supply: The campus is proposed to operate without drawing from Alberta's grid. StratGrid proposes eight approximately 40 MW combined-cycle units, with heat-recovery and emissions-control equipment. StratGrid intends to secure gas for about 240 MW of generation; the website describes a connection to a pipeline about 3 km away. Neither description establishes a completed connection or verified gas-supply contract.

Regulatory stage and timing: StratGrid's November 2026 schedule targets AUC and municipal development-permit applications in Q1/Q2 2027, approvals in Q2/Q3 2027, construction in Q3 2027, and commercial operation in Q4 2028. Jet.AI's November 12, 2026 release instead targeted an AUC application in Q1 2027 and construction in Q3 or Q4 2027; the website anticipates approval decisions in late 2027. These differing company schedules remain preliminary. No project approval, AUC proceeding number, or municipal planning file has been established by these materials.

Battery storage and auxiliary backup: Four proposed battery energy storage systems would each provide 50 MW/100 MWh, totalling 200 MW/400 MWh, for temporary backup, flexibility, and power-quality support. StratGrid describes approximately two hours of storage per system; actual backup duration depends on load and operating conditions. Two approximately 2 MW gas/diesel generators would support plant restarting and emergency shutdown. Battery power and energy are not added to generation or data centre demand.

Community consultation: StratGrid's November 2026 schedule includes notification and the start of personal consultation for November 2026, and a community open house for January 2027. The exact open-house date and location are not confirmed. This adds a month to the open-house process mentioned in Jet.AI's November 12, 2026 announcement; it is not a statutory hearing notice.

Employment estimates: StratGrid's November 2026 estimates include up to 400 construction jobs for the Power Island and approximately 400 for the digital infrastructure. It projects up to 60 full-time-equivalent operating positions for each component, a combined ceiling of 120. The earlier website estimate recorded by ADCW was up to 50 operating positions and up to 800 direct and indirect construction jobs. The differing operating estimates and construction-job definitions are not reconciled; none is confirmed hiring.

Investment structure: Jet.AI's Q2 2026 SEC filing records a US$1.75 million investment through SG Canada InvestCo LLC, with Jet.AI holding 60% of that vehicle and the vehicle holding approximately 26% of StratGrid on a fully vested basis. Its November 12, 2026 release reports approximately 15% indirect interests in StratGrid and the project. The vehicle's stake and Jet.AI's indirect stake are different ownership measures; the newer figure does not by itself establish an ownership change. Jet.AI says it does not control StratGrid or the project.

Larger scale claims: StratGrid's November 2026 plan retains growth potential beyond 1,000 MW, subject to a new application and consultation process. Jet.AI's July 29, 2026 announcement described more than 2 GW across Wheatland and the separate Project Mountain View. These long-term ambitions are not additional committed capacity and are excluded from ADCW's headline totals.

Proposed capital investment: StratGrid's November 2026 estimates include up to $1.7 billion for the Power Island and up to $1.6 billion for the digital infrastructure, a combined upper estimate of $3.3 billion. The currency is not explicitly identified. These are company capital-expenditure estimates, not confirmed financing or expenditure.

SunFavor AgriPower Camrose Hub (Bashaw)

Evidence profile

SunFavor AgriPower Camrose P1 Inc. / P2 Inc.; SunFavor Management Ltd. proposed operator · Camrose County · Cryptocurrency mining / agricultural heat reuse

SunFavor proposes a data-processing and agricultural-processing hub near Bashaw, with two 23 MW natural-gas power plants. The site plans show cryptocurrency computers housed in modular containers, with heat reuse proposed for agricultural processing. Power-plant approval remains under review, with further noise, air-quality, environmental, and consultation information requested by the Alberta Utilities Commission (AUC).

Read evidence profile
Quick factsHide quick facts
46 MW proposed natural-gas generation
The applications propose off-grid natural-gas generation with no grid connection or electricity export. Waste heat would support agricultural processing.
Proposed closed-loop liquid cooling with dry coolers
39.7 dBA model; review ongoingTwo-phase cumulative nighttime prediction at residence R1; 40 dBA limit
Current status
ProposedMunicipal development approved November 25, 2025; two 23 MW power-plant applications under AUC review; construction and operation unverified
Power arrangement

The applications propose off-gridNon-grid-connectedThe facility has no electrical connection to Alberta's interconnected grid and relies on supply available to the site.It does not directly draw from or send electricity to that grid. Power-plant approvals and local impacts can still matter.Learn more → natural-gas generation with no grid connection or electricity export. Waste heat would support agricultural processing.

Capacity context
46 MW proposed natural-gas generationTwo independently developed 23 MW power plants would serve on-site loads, including data processing and agricultural processing. This is proposed generation capacity, not a confirmed computing load or an approval.
Cooling and water
Proposed closed-loopClosed-loop coolingCooling fluid circulates repeatedly through a contained loop instead of being routinely discharged after one pass.That describes the loop, not the whole site's water use. A separate heat-rejection system can still use water, and filling, maintenance, and leaks also matter.Learn more → liquid coolingLiquid coolingLiquid carries heat away from computing equipment, for example through cold plates at the chips.This describes how heat leaves the equipment. It does not identify how heat is ultimately released outside, or establish the site's water demand.Learn more → with dry coolersDry coolingDry cooling releases heat to the air without relying on water evaporation for that heat rejection.Fans and other equipment still use electricity and can produce sound. Check whether the design also uses wet or water-assisted equipment during hot weather.Learn more →The applicant says dry cooling would avoid routine cooling-water consumptionWithdrawal, consumption, and dischargeWithdrawal is water taken from a source. Consumption is the portion not returned to the same water system. Discharge is water released after use or treatment.These are different quantities. Check which one a water figure describes before comparing projects.Learn more →. Initial fill, top-ups, and total site water demand are not quantified in the reviewed record.
Noise details
39.7 dBA model; review ongoingBKL Consultants predicts 39.7 dBA at R1, including the nearby compressor station, under assumed equipment limits. The AUC requests checks on receptor coordinates, baseline sound, included sources, and final mitigation. This is a conditional model, not measured sound or an accepted compliance finding.
Verified
2026-10-27
Location precision
Approximate area →
Treaty geography
Treaty geography not established in the reviewed sources

AUC proceeding: 31010, applications 31010-A001 and 31010-A002. The October 23, 2026 information request asks for responses by November 13, 2026.

Municipal permit: Camrose County approved DP 25 153 on November 25, 2025, with conditions allowing 24/7 operation, requiring AUC compliance, and setting a November 25, 2030 expiry. The applicant reports the later Tribunal process is complete; that Tribunal decision has not been independently reviewed.

Participation: The AUC notice sets November 13, 2026 as the participation-registration deadline and announces an information session on November 2, 2026, from 5:30 p.m. to 7 p.m., at Bashaw Community Centre, 5020 52 Street.

Synapse James River Bridge Data Centre

Evidence profile

Synapse Data Center · Clearwater County · Hyperscale / AI

Synapse proposes a 1 GW data centre campus on about 580 acres near James River Bridge in Clearwater County. The campus would be built in stages, with its own natural-gas power and diesel backup. Site approvals remain unconfirmed.

Read evidence profile
Quick factsHide quick facts
Near James River Bridge, between Range Road 55 and Highway 22, north of Township Road 344
1 GW proposed at full build
Synapse proposes a campus that would run independently of Alberta’s grid on ten 140 MW natural-gas blocks, with a separate 140 MW reserve plant and 1.8 GW of emergency diesel backup.
Closed-loop cooling and air-cooled power-plant condensers proposed
No site levels publishedProposed noise controls
Current status
ProposedClearwater County’s November 24, 2026 agenda listed Synapse for a closed-session delegation. No site-specific approval has been confirmed.
Power arrangement

Synapse proposes a campus that would run independently of Alberta’s grid on ten 140 MW natural-gas blocks, with a separate 140 MW reserve plant and 1.8 GW of emergency diesel backup.

Capacity context
1 GW proposed at full buildSynapse’s plan calls for ten 100 MW buildings at full buildout.
Cooling and water
Closed-loop coolingClosed-loop coolingCooling fluid circulates repeatedly through a contained loop instead of being routinely discharged after one pass.That describes the loop, not the whole site's water use. A separate heat-rejection system can still use water, and filling, maintenance, and leaks also matter.Learn more → and air-cooled power-plant condensers proposedSynapse says its gas provider would supply water. Source, daily volume, and approvals remain unconfirmed.
Noise details
No site levels publishedSynapse describes silencers, acoustic enclosures, walls, and berms. The handout gives no predicted or measured sound levels at nearby communities.
Verified
2026-11-25
Location precision
Approximate area
Treaty geography
Site-specific treaty geography unconfirmed

Teton Digital Black Bear Campus

Verified listing

Teton Digital · Swan Hills region · AI / High-performance computing

A proposed Tier-compatible compute campus about 19 km south of Swan Hills, paired with the previously approved Black Bear power plant.

View project detailsHide project details
466 MW proposed gas generation
Proposed 466 MW behind-the-meter natural-gas combined-cycle generation
Not disclosed
40.3 dBA nighttimeModelled at 1.5 km boundary
Current status
ProposedThe underlying power plant has approvals, but the data centre campus remains a proponent proposal
Power arrangement

Proposed 466 MW behind-the-meterBehind-the-meter generationGeneration supplies electricity on the customer's side of the meter and can reduce the site's draw from the grid.A facility can have this generation and still be grid-connected. The term does not establish that it is off-grid.Learn more → natural-gas combined-cycle generation; the power plant is permitted, but the data centre remains a proposal.

Capacity context
466 MW proposed gas generationThe operator links this power capacity to a proposed compute campus; it is not an approved data centre load.
Cooling and water
Not disclosedProject-specific cooling technology and routine water use have not been publicly disclosed.
Noise details
40.3 dBA nighttimeThe Black Bear power-plant model predicts 40.3 dBA nighttime cumulative sound at the most affected 1.5 km boundary receptors. The AUC requires stack mitigation plus near-field and comprehensive post-construction surveys, including low-frequency noise. The assessment does not cover a future compute campus.
Verified
2026-08-19
Treaty geography
Treaty 8 territory

Teton Digital Northern Forge Campus

Verified listing

Teton Digital · Municipal District of Greenview No. 16 · AI / High-performance computing

A proposed 200 MW behind-the-meter gas-to-compute campus on a 155-acre Greenview site.

View project detailsHide project details
200 MW proposed gas-to-compute capacity
Proposed 200 MW behind-the-meter natural-gas generation
Not disclosed
No values foundAUC review underway
Current status
ProposedProponent says permits are largely in hand while AUC review remains under evaluation
Power arrangement

Proposed 200 MW behind-the-meterBehind-the-meter generationGeneration supplies electricity on the customer's side of the meter and can reduce the site's draw from the grid.A facility can have this generation and still be grid-connected. The term does not establish that it is off-grid.Learn more → natural-gas generation; the proponent says the AUC review remains underway.

Capacity context
200 MW proposed gas-to-compute capacityA proponent full-build figure; the first planned phase is 30 MW.
Cooling and water
Not disclosedProject-specific cooling technology and routine water use have not been publicly disclosed.
Noise details
No values foundTeton says the power-plant application is under AUC evaluation. ADCW's August 29 noise review did not identify a public noise-impact assessment, receptor prediction, or mitigation schedule for Northern Forge.
Verified
2026-08-19
Treaty geography
Treaty 8 territory

Travers AI Data Centre Campus

Evidence profile

Palliser Grid · Vulcan County · Hyperscale / AI

A proposed AI campus on 594.55 rezoned acres near Travers Reservoir. The January 2026 concept targeted up to 2 GW of IT load; Palliser Grid's homepage and power page now describe a 10 MW first phase and up to 1 GW long term. ADCW's November 13, 2026 review recorded an approximately 400 MW first phase on the earlier power page.

Read evidence profile
Quick factsHide quick facts
January 2026 concept: up to 2,000 MW IT load
The company homepage describes a 240 kV strategy and a preliminary AltaLink screen for up to 600 MW of demand service. The underlying screen and final connection approval are unverified. The January 2026 concept proposed a 500 kV substation and two feeds.
Closed-loop and dry-cooling options under evaluation
Not disclosedNo project-specific values found
Current status
ProposedIndustrial rezoning approved; judicial review outcome, project-specific development permit, and utility approvals remain unverified
Power arrangement

The company homepage describes a 240 kV strategy and a preliminary AltaLink screen for up to 600 MW of demand service. The underlying screen and final connection approval are unverified. The January 2026 concept proposed a 500 kV substation and two feeds.

Capacity context
January 2026 concept: up to 2,000 MW IT loadThe January 2026 concept described four potential 500 MW phases. Retained as design history; the current website describes a different, unreconciled roadmap.
Cooling and water
Closed-loopClosed-loop coolingCooling fluid circulates repeatedly through a contained loop instead of being routinely discharged after one pass.That describes the loop, not the whole site's water use. A separate heat-rejection system can still use water, and filling, maintenance, and leaks also matter.Learn more → and dry-cooling options under evaluationThe January 2026 concept proposed reservoir supply and wastewater reuse. The company water page dated November 9, 2026 reports a BRID allocation of up to 5,500 acre-feet per year, not independently verified by ADCW. This ceiling is not forecast consumptionWithdrawal, consumption, and dischargeWithdrawal is water taken from a source. Consumption is the portion not returned to the same water system. Discharge is water released after use or treatment.These are different quantities. Check which one a water figure describes before comparing projects.Learn more →; final cooling, water balance, and operating demand remain unresolved.
Noise details
Not disclosedProject-specific noise details were not found in the public sources reviewed.
Verified
2026-11-15
Location precision
Approximate area →
Treaty geography
Treaty 7 territory

January 2026 concept footprint: About 8 million square feet across 20 to 30 buildings; not reconciled with the current roadmap

Phasing history: January 2026: four potential 500 MW phases. Current company roadmap: 10 MW, 100 MW, and 300 MW stages, then up to 1 GW long term; both current pages agree on 10 MW for Phase 1. ADCW's November 13, 2026 review recorded about 400 MW on the earlier power page.

Judicial review: A July 22, 2026 application challenges the rezoning process. Its scheduled September 29, 2026 date has passed; no outcome or subsequent date was verified as of November 13, 2026. The allegations are not adjudicated findings.

Wave Infrastructure Junction 42 AI Research Lab

Verified listing

Wave Infrastructure · Red Deer County · AI / High-performance computing

Red Deer County announced a proposed AI research lab at Lot 24, Junction 42 Business Park, near Penhold, on September 29, 2026. The County estimates a $300 million development. A joint public hearing on the proposed planning and rezoning changes is scheduled for November 17, 2026 at 1:30 p.m. Rezoning would not itself approve the data centre.

View project detailsHide project details
Approximately 5 MW critical compute target
Wave targets approximately 7–8 MW of facility power. The supply design, grid connection, and regulatory approvals remain unverified.
Not disclosed
Not disclosedNo project-specific values found
Current status
ProposedJoint public hearing scheduled for November 17, 2026 at 1:30 p.m.; planning changes and development approval are not confirmed.
Power arrangement

Wave targets approximately 7–8 MW of facility power. The supply design, grid connection, and regulatory approvals remain unverified.

Capacity context
Approximately 5 MW critical compute targetWave's planning target for computing equipment, distinct from its approximately 7–8 MW facility-power target. Subject to engineering, approvals, delivery, and final design reconciliation. Kept out of provincial headline totals because it is not a whole-facility electrical-demand figure.
Cooling and water
Not disclosedProject-specific cooling technology and routine water use have not been publicly disclosed.
Noise details
Not disclosedProject-specific noise details were not found in the public sources reviewed.
Verified
2026-10-10
Treaty geography
Treaty 7 territory

Map location: The proposed site is within SW-5-37-27-W4M at Junction 42. The map marker remains approximate and does not show the proposed parcel boundaries or building location.

Land and planning process: The County owns Lot 24 and says the purchase agreement requires it to apply for rezoning. Bylaw 1031/2026-A would amend the Junction 42 Local Area Structure Plan, while Bylaw 1002/2026-K would rezone approximately 13.82 acres within SW-5-37-27-W4M from Agricultural to Medium Industrial. Both changes remain proposed.

Public participation: The joint public hearing is November 17, 2026 at 1:30 p.m. in Council Chambers at the Red Deer County Centre, with telephone and video participation available through the official notice. Written submissions received by November 6, 2026 will be published in the agenda; late submissions will be circulated to Council and the public. The developer is expected to hold at least one local open house; a date is not confirmed.

Separate approvals: If rezoning succeeds, a data centre would be a permitted use under Medium Industrial rules. The County explicitly says rezoning does not approve all development aspects; provincial regulatory approvals may also be required.

Proposed investment: Approximately $300 million, according to Red Deer County. This is an estimate for the intended development, not confirmed spending.

Developer planning targets: Wave targets approximately 5 MW for computing equipment and 7–8 MW for the facility overall. These figures are not additive, approved supply, or measured use. Wave says the targets depend on engineering, approvals, and delivery, with facility power subject to final design reconciliation.

Target opening: Wave targets commercial operation in the first quarter of 2028 (January–March 2028). This is a conditional planning target, not a confirmed opening or construction schedule.

Estimated build-phase roles: Wave estimates 90–100 direct and indirect roles supporting construction and local services, subject to project development. This does not establish permanent employment or guaranteed local hiring.

Site area: The hearing notice identifies a 13.82-acre rezoning area and a proposed 11.48-acre parcel for subdivision and sale within SW-5-37-27-W4M. These describe different planning areas, not the building footprint. Wave describes approximately 12 acres, while the County's earlier conceptual parcel map lists Lot 24 at 13.46 acres; the sources do not explain how that earlier figure relates to the proposed parcel.

Information gaps: Power supply, cooling-water needs, sound at nearby communities, permits, and construction timing remain unverified. Wave's location schematic is not a legal survey or approved site plan, and its building rendering is a concept.

Wild Rose Power Hub Data Centre

Evidence profile

BHE Canada / Chinook Development LP · Rocky View County · Data centre / Workload undisclosed

A proposed 479-acre data centre southwest of Langdon with a 1.3 GW grid request. Planning review continues; published job estimates disagree, and no development permit has been verified.

Read evidence profile
Quick factsHide quick facts
1.3 GW AESO connection request
Alberta grid proposed
Closed-loop dry cooling proposed
65 day / 55 evening dBLocation and weighting unspecified
Current status
ProposedProposed: area structure plan under review; no final plan adoption or development permit verified
Power arrangement

Alberta grid proposed; developer says no on-site power plant.

Capacity context
1.3 GW AESO connection requestSeptember 2026: P3108 lists 300 MW and 1,000 MW stages, with service dates under review. Requested capacity is not approved or operating demand.
Cooling and water
Closed-loopClosed-loop coolingCooling fluid circulates repeatedly through a contained loop instead of being routinely discharged after one pass.That describes the loop, not the whole site's water use. A separate heat-rejection system can still use water, and filling, maintenance, and leaks also matter.Learn more → dry coolingDry coolingDry cooling releases heat to the air without relying on water evaporation for that heat rejection.Fans and other equipment still use electricity and can produce sound. Check whether the design also uses wet or water-assisted equipment during hot weather.Learn more → proposedBHE Canada claims virtually no water use for core cooling. Total site water demand is not quantified.
Noise details
65 day / 55 evening dBWild Rose’s developer states operational sound targets of 65 dB during the day and 55 dB in the evening. It does not say where these targets apply or how the sound would be measured. These figures do not establish sound levels at nearby communities.
Verified
2026-09-11
Location precision
Approximate area →
Treaty geography
Treaty 7 territory

Job estimates conflict: The developer projects 200–300 ongoing jobs and 975–2,100 construction jobs. Alberta Major Projects labels the larger range as operations jobs; the difference remains unresolved.

Public review: The County says a Council public hearing remains part of the planning process. Approval of terms of reference did not approve the data centre.

Wonder Valley AI Data Centre Park

Evidence profile

O'Leary Digital Limited · Municipal District of Greenview No. 16 · Hyperscale / AI

A proposed off-grid AI data centre industrial park south of Grande Prairie. O'Leary Digital now describes a Phase 1 build of up to ten approximately 100 MW data centre facilities supported by up to 2 GW of on-site power.

Read evidence profile
Quick factsHide quick facts
Up to 1 GW of Phase 1 data centre IT load
Proposed off-grid on-site natural-gas generation. The current FAQ describes up to 2 GW for Phase 1 and 7.5 GW over the long term
Reuse and recirculation under study
Study in preparationNo published receptor values
Current status
ProposedPlanning and regulatory preparation underway; required approvals are not complete
Power arrangement

Proposed off-gridNon-grid-connectedThe facility has no electrical connection to Alberta's interconnected grid and relies on supply available to the site.It does not directly draw from or send electricity to that grid. Power-plant approvals and local impacts can still matter.Learn more → on-site natural-gas generation. The current FAQ describes up to 2 GW for Phase 1 and 7.5 GW over the long term; an earlier filing instead describes 9 GW.

Capacity context
Up to 1 GW of Phase 1 data centre IT loadO'Leary Digital says Phase 1 could support up to ten data centre facilities, each designed for approximately 100 MW of IT load. This is a proponent plan, not approved or operating capacity.
Cooling and water
Reuse and recirculation under studyFinal cooling design and operating water balance are not publicly confirmed.
Noise details
Study in preparationThe proponent's consultation filing says project-specific noise work is still being prepared. No final noise-impact assessment or receptor prediction was found.
Verified
2026-11-04
Location precision
Approximate area →
Treaty geography
Treaty 8 territory
Inactive4 projects

Cancelled, withdrawn, or refused projects retained because they remain part of Alberta's public development record.

Crusoe Crossfield / Lone Pine Energy Park Data Centre

Verified listing

Crusoe / KALiNA Distributed Power · Rocky View County · AI / High-performance computing

A former Crusoe and KALiNA proposal for a co-located data centre and gas power plant near Crossfield. The site-specific municipal proposal and both related AESO requests have been withdrawn or cancelled.

View project detailsHide project details
170 MW original power-plant concept
The withdrawn proposal paired the data centre with a planned natural-gas plant: 170 MW in the original framework and 200 MW initial generation in KALiNA's October 2025 portfolio. AESO's October 2026 list marked the related 178 MW generation request cancelled.
Not disclosed
Not disclosedNo project-specific values found
Current status
InactiveKALiNA withdrew the Lone Pine data centre proposal at the mapped Crossfield site; AESO's October 2026 list marked both related requests cancelled
Power arrangement

The withdrawn proposal paired the data centre with a planned natural-gas plant: 170 MW in the original framework and 200 MW initial generation in KALiNA's October 2025 portfolio. AESO's October 2026 list marked the related 178 MW generation request cancelled.

Capacity context
170 MW original power-plant conceptThe original framework described 170 MW; KALiNA's October 2025 portfolio later listed 200 MW initial generation at Lone Pine. Both are historical company plans, not verified data centre load. AESO's October 2026 list marked the related 178 MW generation request cancelled.
Cooling and water
Not disclosedProject-specific cooling technology and routine water use have not been publicly disclosed.
Noise details
Not disclosedProject-specific noise details were not found in the public sources reviewed.
Verified
2026-11-10
Treaty geography
Treaty 7 territory

Municipal status: Rocky View County says KALiNA withdrew the Lone Pine Energy Centre data centre proposal, ending the County's work on the area structure plan terms of reference.

AESO queue status: AESO's October 2026 list marked the 280 MW Lone Pine data-load request, P3154, and 178 MW generation request, P2980, cancelled. Neither appears in its November 2026 list. Their absence does not establish a revived or relocated project.

Broader framework: The February 12, 2025 Crusoe framework remains part of the historical record. KALiNA's October 30, 2026 report lists five secured sites: Alsike, Myers, Gilby, Clairmont, and Saddle Hills. Crossfield is absent. That portfolio list does not announce a replacement Crusoe campus or revive the withdrawn Lone Pine proposal.

Fire Technology Ewing Lake Data Processing Centre

Verified listing

Fire Technology Corp. · County of Stettler No. 6 · Cryptocurrency / Bitcoin mining

The Land and Property Rights Tribunal revoked approval of the Ewing Lake Bitcoin-mining development on August 22, 2025. Its decision preserved the power-generation approval with revised conditions, but did not authorize the data-processing use.

View project detailsHide project details
9.9 MW power component retained in Tribunal decision
The Tribunal preserved approval of the nine-generator, 9.9 MW natural-gas power component under revised conditions. This does not authorize the revoked Bitcoin-mining use or confirm operating generation.
Not disclosed
36.0 to 37.0 dBA cumulative at three existing residencesOriginal proposal model; data-processing approval revoked
Current status
InactiveData-processing approval under DP 24097 revoked on August 22, 2025; power-generation approval preserved with revised conditions. Construction and operation are not confirmed.
Power arrangement

The Tribunal preserved approval of the nine-generator, 9.9 MW natural-gas power component under revised conditions. This does not authorize the revoked Bitcoin-mining use or confirm operating generation.

Capacity context
9.9 MW power component retained in Tribunal decisionThe August 22, 2025 Tribunal decision preserved approval of the power component in accordance with AUC Approval 29356-D02-2024, but revoked the data-processing use. Retained as context and excluded from active data-centre generation totals; current construction and operation are not confirmed.
Cooling and water
Not disclosedProject-specific cooling technology and routine water use have not been publicly disclosed.
Noise details
36.0 to 37.0 dBA cumulative at three existing residencesThe original permit package modelledModelled versus measuredA modelled result is a prediction based on inputs and assumptions. A measured result comes from observations or instruments under particular conditions.A prediction is not verified operating performance. Check the location, period, operating scenario, and what the reported number actually represents.Learn more → 36.0 to 37.0 dBA cumulative sound at three existing residences for the proposed configuration. These are not measured operating levels. The Tribunal retained post-construction and twice-yearly assessment requirements for the power component; it did not decide whether the data-processing proposal was suitable for the location.
Verified
2026-09-30
Treaty geography
Treaty 6 territory

Tribunal decision: Decision LPRT2025/MG0520, dated August 22, 2025, granted the appeal and varied DP 24097. Paragraph 47 revokes approval of the data-processing improvements; paragraph 48 preserves power-generation approval with revised conditions.

Why approval was revoked: The Tribunal found that the landowner-consent requirement was not met. The Ember surface lease did not substitute for the landowner's written consent to the specific data-processing application. The Tribunal did not need to decide whether noise, fire risk, or other community impacts made the proposal unsuitable.

Former permit term: The original December 18, 2029 expiry for data-processing use was deleted in the Tribunal decision. It is not a continuing authorization for Bitcoin mining.

Current-status boundary: The revoked data-processing proposal remains listed as a historical record. ADCW has not verified a replacement data-processing approval or current construction, commissioning, or operation. The power approval preserved in the August 22, 2025 decision does not itself establish its current operating status.

Kineticor Data Centre Campus

Verified listing

Kineticor Asset Management · Rocky View County · AI / High-performance computing

A refused 1,107-acre AI data centre and technology park proposal in northeast Rocky View County.

View project detailsHide project details
Not disclosed
Not disclosed
Low-water cooling concept
Study was not filedProposal refused before permit stage
Current status
InactiveRocky View County refused the area structure plan on September 9, 2025; the proposal cannot proceed under that plan
Power arrangement

Not disclosed

Capacity context
Not disclosedNo additional capacity context published.
Cooling and water
Low-water cooling conceptThe former proposal projected a 4,000 to 6,000 m³ initial fill (4 to 6 million L) and comparatively small routine cooling use.
Noise details
Study was not filedThe County's review said a later development-permit application would need a noise-impact assessment covering predicted boundary levels, mitigation, and monitoring. Council refused the area structure plan before that stage, and ADCW did not identify a completed project-specific assessment.
Verified
2026-07-31
Treaty geography
Treaty 7 territory

Synapse Olds Data Centre

Evidence profile

Synapse Real Estate Corp. · Town of Olds · Hyperscale / AI

A former proposal for a 1 GW AI data centre campus in Olds. Synapse says the project will not proceed as proposed after the AUC denied the proposed 1.4 GW supporting power plant.

Read evidence profile
Quick factsHide quick facts
1 GW proposed data centre capacity
No approved power source identified
Closed-loop data-centre cooling proposed
75 dBA optionProposed emergency-generator rating
Current status
InactiveSynapse says the Olds project will not proceed as proposed after the AUC denied its supporting power-plant application
Power arrangement

No approved power source identified; the proposed 1.4 GW on-site natural-gas plant was denied by the AUC.

Capacity context
1 GW proposed data centre capacityTen proposed 100 MW data centre blocks at full build.
Cooling and water
Closed-loopClosed-loop coolingCooling fluid circulates repeatedly through a contained loop instead of being routinely discharged after one pass.That describes the loop, not the whole site's water use. A separate heat-rejection system can still use water, and filling, maintenance, and leaks also matter.Learn more → data-centre cooling proposedDeveloper estimate: approximately 60 m³/day (60,000 L/day) across the filed site design; not an approved allocation or measured demand.
Noise details
75 dBA optionThe historical proposal included a noise-impact assessment and municipal peer review. The proposed 75 dBA emergency-generator option produced Rule 012 exceedances at several nearby receptors; the associated power plant was later refused.
Verified
2026-08-25
Location precision
Exact site →
Treaty geography
Treaty 7 territory